Loading…
Loading…
Tender Value
₹1.9 L
EMD Value
₹9,700
Closing Date
1 Oct 2026, 6:55 pm4d left
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
Construction of culvert and renovation of Drain at Galwanpora (Rakh Hakermulla)
2026_RDPR_325381_66
NIT_77_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
SOIBUGH
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹9,700
21 Sept 2026
21 Sept 2026
3 Oct 2026
21 Sept 2026
1 Oct 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenchs/drains by manually including disposal of earth for an ave lead of 1m,lift upto 1.5m in all kinds of soils | 27 | Cum | 479.3 | ₹12,941.1 |
| 2 | Providing and laying of stone soling hand packed complete Job including by MT incl. plum. | 7.3 | Cum | 1,200 | ₹8,760 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) plum 20 % | 9.47 | Cum | 5,733.6 | ₹54,297.19 |
| 4 | providing & laying of RCC including curing but excluding the cost of centering,shuttering ,finishing and reinforecement in 1:2:4 mix | 2.61 | Cum | 7,104.35 | ₹18,542.35 |
| 5 | Steel reinforecement for RCC work including straightening,cutting ,bending placing in position and binding all complete | 240.12 | Kg | 115.35 | ₹27,697.84 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 144 | Sqm | 286.35 | ₹41,234.4 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: slabs etc. | 4.5 | Sqm | 718.2 | ₹3,231.9 |
| 8 | Carraige of aggregates from Source to Site. | 10.87 | cum | 445.64 | ₹4,844.11 |
| 9 | Carraige of sand from Source to Site. | 5.44 | cum | 520.34 | ₹2,829.61 |
| 10 | Providing 12mm plaster in 1:4 mix ratio( 1cement:4 fine sand) | 50.4 | Sqm | 283.8 | ₹14,303.52 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_1099190.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .