| Sl No | Description | Qty | Unit | M/S CLEAR LINE ENGINEERS CONTRACTOR L1 | MAHALAXMI TRANSFORMER INDUSTRY L3 | M/s Wazir Agencies L2 |
|---|---|---|---|---|---|---|
| 1.0025 KVA Distribution Transformer (Aluminium ) | ||||||
| 1.01 | Unloading of transformer from vehicle, | 1 | No. | 5 ₹5 Lowest | 82 ₹82 | 10 ₹10 |
| 1.02 | Dragging of transormer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations. | 1 | No. | 5 ₹5 Lowest | 91 ₹91 | 10 ₹10 |
| 1.03 | Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages. | 1 | No. | 5 ₹5 Lowest | 307 ₹307 | 10 ₹10 |
| 1.04 | Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including | 1 | No. | 5 ₹5 Lowest | 91 ₹91 | 10 ₹10 |
| 1.05 | Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc. | 1 | No. | 5 ₹5 Lowest | 104 ₹104 | 10 ₹10 |
| 1.06 | Reconditioning of LV Coil…..(Aluminium) | 1 | Kg | 40 ₹40 | 28 ₹28 Lowest | 50 ₹50 |
| 1.07 | Supply and Winding of HV Leg coil…. (Aluminium) | 1 | Kg | 570 ₹570 | 361 ₹361 | 350 ₹350 Lowest |
| 1.08 | Supply and Winding of LV Leg coil…. (Aluminium) | 1 | Kg | 410 ₹410 | 343 ₹343 Lowest | 350 ₹350 |
| 1.09 | Impregnation and Heat tretment of Transformer/coils | 1 | No. | 5 ₹5 Lowest | 370 ₹370 | 10 ₹10 |
Tender Value
Refer Docs
EMD Value
₹3 L
Closing Date
11 May 2023, 2:00 pmClosed
Executive Engineer Electric Division Batote
Executive Engineer Electric Division Batote
Reclamation of Damaged Distribution Transformers of Various Rating Aluminum Copper falling under the jurisdiction of Electric Division Batote under the Jurisdiction of Division Batote for the year 2023 24
2023_PDD_210179_1
e nit 02 of 2023-24
Open Tender
Electrical Works
Turn-key
360 days
Batote
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
Executive Engineer Electric Division Batote
₹3 L
Yes
22 May 2023
20 Apr 2023
12 May 2023
20 Apr 2023
11 May 2023
20 Apr 2023
Amount
25 KVA Distribution Transformer (Aluminium )
Unloading of transformer from vehicle,
Dragging of transormer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations.
Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages.
Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including
Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc.
Reconditioning of LV Coil…..(Aluminium)
Supply and Winding of HV Leg coil…. (Aluminium)
Supply and Winding of LV Leg coil…. (Aluminium)
Impregnation and Heat tretment of Transformer/coils
Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry.
Supply and fitting of HT Bushing (for all capacities)
Supply and fitting of HT Bush Rod (for all capacities)
Supply and fitting of LT Bushing
Supply and fitting of LT Bush Rod
Filtration/Dehydration of old oil including filling.(for all capacities)
Supply and filling of new transformer oil.(for all capacities)
Heat Treatment of Transformer by short Circuit
Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work.
Labour charges required for Testing of transformer after repair.
Loading of repaired Transformer to Vehicle including dragging from stacking site.
Labour charges for weighing ,stacking and loading of Aluminium/Copper scrap etc( for all capacities).
Re-assembling of Tranformers including providing and fixing of all sundry items
63 KVA Distribution Transformer (Aluminium )
Unloading of transformer from vehicle,
Dragging of transformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations.
Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages.
Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including
Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc.
Reconditioning of LV Coil…..(Aluminium)
Supply and Winding of HV Leg coil…. (Aluminium)
Supply and Winding of LV Leg coil…. (Aluminium)
Impregnation and Heat tretment of Transformer/coils
Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry.
Supply and fitting of LT Bushing
Supply and fitting of LT Bush Rod
Heat Treatment of Transformer by short Circuit
Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work.
Labour charges required for Testing of transformer after repair.
Loading of repaired Transformer to Vehicle including dragging from stacking site.
Re-assembling of Tranformers including providing and fixing of all sundry items
100 KVA Distribution Transformer (Aluminium )
Unloading of transformer from vehicle,
Dragging of transformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations.
Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages.
Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including
Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc.
Reconditioning of LV Coil…..(Aluminium)
Supply and Winding of HV Leg coil…. (Aluminium)
Supply and Winding of LV Leg coil…. (Aluminium)
Impregnation and Heat tretment of Transformer/coils
Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry.
Supply and fitting of LT Bushing
Supply and fitting of LT Bush Rod
Heat Treatment of Transformer by short Circuit
Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work.
Labour charges required for Testing of transformer after repair.
Loading of repaired Transformer to Vehicle including dragging from stacking site.
Re-assembling of Tranformers including providing and fixing of all sundry items
200/250 KVA Distribution Transformer (Aluminium /Copper)
Unloading of transformer from vehicle,
Dragging of transformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations.
Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages.
Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including
Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc.
Reconditioning of LV Coil….. (Copper)
Reconditioning of LV Coil…..(Aluminium)
Supply and Winding of HV Leg coil…. (Copper)
Supply and Winding of LV Leg coil…. (Copper)
Supply and Winding of HV Leg coil…. (Aluminium)
Supply and Winding of LV Leg coil…. (Aluminium)
Impregnation and Heat tretment of Transformer/coils
Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry.
Supply and fitting of LT Bushing
Supply and fitting of LT Bush Rod
Heat Treatment of Transformer by short Circuit
Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work.
Labour charges required for Testing of transformer after repair.
Loading of repaired Transformer to Vehicle including dragging from stacking site.
Re-assembling of Tranformers including providing and fixing of all sundry items
400 KVA Distribution Transformer (Copper)
Unloading of transformer from vehicle,
Dragging of transformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations.
Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages.
Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including
Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc.
Reconditioning of LV Coil….. (Copper)
Supply and Winding of HV Leg coil…. (Copper)
Supply and Winding of LV Leg coil…. (Copper)
Impregnation and Heat tretment of Transformer/coils
Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry.
Supply and fitting of LT Bushing
Supply and fitting of LT Bush Rod
Heat Treatment of Transformer by short Circuit
Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work.
Labour charges required for Testing of transformer after repair.
Loading of repaired Transformer to Vehicle including dragging from stacking site.
Cost of other scrap items like Damaged Bush rods and other items replaced during repairs of damaged transformers
Cost of Aluminium Scrap of all ratings transformers
Re-assembling of Tranformers including providing and fixing of all sundry items
Gaskets of Different sizes
Oil Drain valves
Welding of tramsformers
Nuts and Bolts of all sorts
Cost of Copper Scrap of all ratings transformers
M/s Wazir Agencies
MAHALAXMI TRANSFORMER INDUSTRY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .