| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr Quoted ₹1.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 CrRejected-Finance D NO 271D3 5 ANDAL NAGAR K R NAGAR NALATINPUTHUR KOVILPATTI TK 628 716 | KOVILPATTI | TUTICORIN | TAMIL NADU | 628716 | ₹1.5 Cr | L2 | Rejected-Finance L2 |
| 3 | L33₹1.6 CrRejected-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹1.6 Cr | L33 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical BQR conditions not satisfied |
| 5 | Rejected-Technical 4 35 B EAST STREET JAMBULINGAPURAM K VELAYUTHAPURAM POST KALUGUMALAI VIA KAYATHAR TALUK THOOTHUKUDI DISTRICT 628 | THOOTHUKUDI | TAMIL NADU | - | - | Rejected-Technical BQR conditions not satisfied |
| Sl No | Description | Qty | Unit | J SETHURAMALINGAM L1 | S CHELLADURAI CONTRACTOR L2 | K DHINAKARAN L3 |
|---|---|---|---|---|---|---|
| 1.00 | Conducting check survey in the already fixed route, fixing of tower location and pit marking etc., complete. | 7 | Loc | 500 ₹3,500 | 600 ₹4,200 | 2,000 ₹14,000 |
| 2.00 | Earthwork excavation in hard stiff clay black cotton hard red earth shales murram gravel stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead, lift, etc., complete. | 60 | M3 | 104 ₹6,240 | 100 ₹6,000 | 300 ₹18,000 |
| 3.00 | Earthwork excavation in soft disintegrated rock or kankar not requiring blasting. | 60 | M3 | 156 ₹9,360 | 150 ₹9,000 | 300 ₹18,000 |
| 4.00 | Earthwork excavation in medium rock and dense medium rock not requiring blasting. | 60 | M3 | 274 ₹16,440 | 300 ₹18,000 | 300 ₹18,000 |
| 5.00 | Earthwork excavtion in hard rock by measured in solid including contol blasting and stacking | 110 | M3 | 350 ₹38,500 | 500 ₹55,000 | 300 ₹33,000 |
| 6.00 | Dewtering charges per hour including hire charges for 10/15Hp Diesel motor with pump including cost of all lead, lift etc., complete. | 30 | Hrs | 10 ₹300 | 1 ₹30 | 500 ₹15,000 |
| 7.00 | Providing shorring and shuttering and removing the same after concreting including all cost of materials, lead, lift, etc., complete. | 82.3 | M2 | 50 ₹4,115 | 1 ₹82.30 | 25 ₹2,057.50 |
| 8.00 | Supplying and Transporting of template and stubs from store to site and assembling at site and shifting the template from Loc. to Loc. and back to stores. HC(O) tower | 2 | Loc | 8,000 ₹16,000 | 12,000 ₹24,000 | 20,000 ₹40,000 |
| 9.00 | Supplying and Transporting of template and stubs from store to site and assembling at site and shifting the template from Loc. to Loc. and back to stores. KC(O) tower | 5 | Loc | 10,000 ₹50,000 | 15,000 ₹75,000 | 20,000 ₹1 L |
| 10.00 | PCC 1:3:6 using 40mm HBG metal (machine crushed) for including cost of all materials lead lift etc complete. | 70 | M3 | 5,000 ₹3.5 L | 6,000 ₹4.2 L | 4,500 ₹3.1 L |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
20 Jan 2026, 12:00 pmClosed
CE/TP SO/Madurai
CE / TP SO / Madurai
Shifting existing 110KV LILO line from 110KV S.R.Pudur Arumuganeri Samugarengapuram 400/230-110 SS
2026_EB_641346_1
CE/TP SO/MDU Specn.No.008/2025-26
Open Tender
Construction Works
180 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.4 L
27 May 2026
9 Jan 2026
21 Jan 2026
9 Jan 2026
20 Jan 2026
9 Jan 2026
Conducting check survey in the already fixed route, fixing of tower location and pit marking etc., complete.
Earthwork excavation in hard stiff clay black cotton hard red earth shales murram gravel stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead, lift, etc., complete.
Earthwork excavation in soft disintegrated rock or kankar not requiring blasting.
Earthwork excavation in medium rock and dense medium rock not requiring blasting.
Earthwork excavtion in hard rock by measured in solid including contol blasting and stacking
Dewtering charges per hour including hire charges for 10/15Hp Diesel motor with pump including cost of all lead, lift etc., complete.
Providing shorring and shuttering and removing the same after concreting including all cost of materials, lead, lift, etc., complete.
Supplying and Transporting of template and stubs from store to site and assembling at site and shifting the template from Loc. to Loc. and back to stores. HC(O) tower
Supplying and Transporting of template and stubs from store to site and assembling at site and shifting the template from Loc. to Loc. and back to stores. KC(O) tower
PCC 1:3:6 using 40mm HBG metal (machine crushed) for including cost of all materials lead lift etc complete.
PCC 1:2:4 using 20mm metal (machine crushed) for for foundation concrete with form work including the cost of all materials, lead, lift etc., complete.
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. HC(O) tower wet
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. KC(O) tower wet
Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials lead lift etc complete. (Earth pipe and Earth strip will be supplied by the contractor)
Transport, erection of tower parts including sorting out of tower parts in stores, loading into lorry, transporting the same to site, unloading at site, erection of towers, tightening punching of bolts and nuts including all lead lift labour etc complete including charges for rectification of tower parts if any including labour lead lift etc complete.
Transport and hoisting of 8 units single tension 120 KN Disc or Poimer insulators including all cost of labour lead lift T&P etc complete
Transport and hoisting of 7 units suspension 90 KN Disc or Polimer insulators including all cost of labout lead lift T&P etc complete
Lowering of HT/LT line including restringing the same including cost of all materials lead lift etc complete.
Providing ordinary bamboo trussels including all cost of materials lead lift etc complete
Transport of 6 Nos. of Panther conductor, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers for tension locations including giving jumber connection for power conductor including transport charges, loading unloading lead lift etc complete.
Transport of 6 Nos. of Panther conductor, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers for tension locations including giving jumber connection for power conductor including transport charges, loading unloading lead lift etc complete.
Transport of OPGW(24 Fibre) earthwire, paying out, jointing, rough sagging, tensioning, including giving jumber connection including transport charges, loading unloading lead lift etc complete..
Supplying and fixing of danger board, including all cost of board, labour painting and writing charges in Hindi, English and in Tamil etc., complete
Supply and fixing of Phase Plate consisting of 3 Nos. including all cost plate, lead, lift, labour, painting etc., complete
Supply and fixing of Number Plate including all cost plate, lead, lift, labour, painting etc., complete
Supplying and fixing of 16swg name board of required size including all cost of lead lift labour painting and writing charges in Hindi, English and in Tamil etc complete
Painting with anticorrosive paint, two coats including all cost of materials lead lift etc complete
Providing temporary guys including all cost of earthwork refilling labour etc complete
PCC 1:2:4 using 20mm machine crushed metal for muffing and coping and plastering the same with CM 1:3, 12mm thick including all cost of shuttering charges lead lift labour materials etc complete
Tack welding of bolts and nuts in towers using diesel generator Set.s and applying zinc chromate paint including cost of all materials, lead and hire charges etc., complete.
Removal of surplus earth ina low lying area to a average distance of 200m by head load.
Labour charges for dismantling of 8 Units of 120 KN disc insulators inlcuding cost of all lead, lift etc., complete.
Labour charges for dismantling of 7 Units of 90 KN disc insulators inlcuding cost of all lead, lift etc., complete.
Labour charges for dismantling of 6 Nos. Panther conductor including cost of all lead, lift, T&P etc., complete.
Labour charges for dismantling of OPGW including cost of all lead, lift, T&P etc., complete.
Labour charges for dismantling of GI tower parts including cost of all lead, lift, T&P etc., complete.
GI Tower parts
GI Bolt and Nuts
Panther Conductor
OPGW- 24 fibre DWSM cable, accessories,including erection,testing and commissioning
90 KN disc insulators
120 KN disc insulators
Single Tension Fittings for panther
Single Suspension Fittings for panther
S.B.Damper for panther
PA Rod for Panther
Repair Sleeve for Panther
Mid span compression joint for Panther
Number Plate
Phase Plate
Danger Board
Name Board
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_768103.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid