Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | ₹1.5 Cr | L1 | Accepted-AOC Being Lowest |
| 2 | L2₹1.5 Cr+₹4.7 L (3.12%)Rejected-Finance SWAGAT CO OP HSG SOCIETY LTD 22 303 CHAITANYA SHIVAJI RAJE COMPLEX MHADA COMPLEX OPP EKA NAGAR KANDIVALI W MUMBAI 400 067 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400067 | ₹1.5 Cr+₹4.7 L (3.12%) | L2 | Rejected-Finance Being other than Lowest |
| 3 | L3₹1.6 Cr+₹12.0 L (8.05%)Rejected-Finance | ₹1.6 Cr+₹12.0 L (8.05%) | L3 | Rejected-Finance Being other than Lowest |
| 4 | L4₹1.7 Cr+₹21.7 L (14.6%)Rejected-Finance PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | ₹1.7 Cr+₹21.7 L (14.6%) | L4 | Rejected-Finance Being other than Lowest |
| 5 | Rejected-Technical 1446 ELITE ENTERPRISES NORTH SOLAPUR NEAR SUSHIL MARATHI SCHOOL SOLAPUR MAHARASHTRA 413004 | SOLAPUR | MAHARASHTRA | 413004 | - | - | Rejected-Technical Three class below and Not having category c (i) and c (vi) |
Tender Value
₹1.5 Cr
EMD Value
₹2.3 L
Closing Date
11 Sept 2021, 6:00 pmClosed
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
REP MAINT OF VRF PLANTS CHILLED WATER PIPE LINES AND MISC CONNECTED VALVES OF CENTRAL AC PLANT FIRE FIGHTING WATER DISTUN SYSTEM HYDRANT HOSE BOX FIRE DETECTION AND FIRE ALARM SYSTEM AND CONNECTED ACCES M AND O AND REP MAINT OF CENTRAL AC PLANT AT
2021_MES_468120_1
8091/CWE(NW) MUMBAI/E8
Open Tender
Civil Works
Item Rate
330 days
AGE (I) Asvini
Class B
7 documents required · 7 mandatory
₹1,000
Yes
AGE (I) Asvini
₹2.3 L
Yes
12 Oct 2021
14 Aug 2021
13 Sept 2021
14 Aug 2021
11 Sept 2021
6 Sept 2021
14 Aug 2021 - 4 Sept 2021
Amount
PART- I Manning and operation of Central Air Conditioning Plant of given below capacity by employing following types of Operators in shift duty complete all as specified and directed :-
1st Shift (06:00 to 14:00) - Qualified 01 Nos High skilled operator & 01 unskilled for handling 1200Ton Central AC Plant- 02 Nos (For AC Plant & 55 Nos AHU, FCU, RU units Units).
2nd Shift (14:00 to 22:00) - Qualified 01 Nos High skilled operator & 01 unskilled for handling 1200Ton Central AC Plant- 02 Nos (For AC Plant & 55 Nos AHU, FCU, RU units Units).
3rd Shift (22:00 to 06:00) - Qualified 01 Nos High skilled operator & 01 unskilled for handling 1200Ton Central AC Plant- 02 Nos (For AC Plant & 55 Nos AHU, FCU, RU units Units).
The total Plant consists following equipments and duties:- a) Central Air Conditioning plant of capacity 3 x 400 TR double screw compressor, make Diakin (Each compressor of capacity 200TR x 2 Nos) Model Name- PFS4302DBRY, suitable for R 134a AC Supply with one No of microprocessor based soft start central pannel with safty operation with shell and tube type water cooled condenser and shell and tube water cooled chiller, anti vibratiion damper , refrigerant pipe flowing, switch butterfly valve, balancing valve, NRV, Strainer, gauges etc, for 24 hrs. daily for efficient and contious running /operation of central air conditioning plant and its electrical panel board with other installation/ equiptmentas mentioned below to Maintaining Log sheet, lodging of complaint ,attending complaint Mointering of PLC including taking care of Chillers plant ,cooling towers,condenser pumps/motors, chiller pumps/motors pilferage, theft or damages installed at INHS Asvini, Comprising with following :- (i)Chiller Plant capacity of 400 TR - 3 Nos .
(ii) Condenser Pump Set of 40 hp motor capacity- 4 Nos. Condenser water pump with 3 phase induction motor, butterfly valve NRV and strainer etc with head of 25mtr, discharge 306cum/hr make GEC, motor rating 30KW, 1465RPM, 47 Amps, 415V Make Kirloskar. (iii) Chiller Pump Set of 100 hp motor capacity -4 Nos Chilled water pump set with 3phase, 415V,Induciotn motor Make Kirloskar including butterfly valve, NRV and strainer etc, with pump head of 60mtr, discharge 3445 LPM, rating 55KW, 1465RPM. (iv) Cooling Tower (FRP) with 15/20 HP blower motor - 3 Nos. Cooling tower with motor fan, sump, butterfly valve NRV, strainer makeup tank of capacity 10000 litres pvc syntex tank, motor capacity of 15/20HP Nos of Advance cooling tower ltd.
b) Air Handling Unit of Central AC Plant of min capacity of 1.5 TR TO 66TR (Make Carrier Aircon/ Blue Star) Double skin air handling unit draw/ blow type complete with fan /centrifugal blower, coil section with multirow deep cooling coil, heating coils, humidifer sectiion, filter section with synthtic fibre including TEFC induction motor, belt drive package, balancing valve gate valve 3way diverting valve, Y strainer airvent, temperature and pressure gauge etc for efficient and continous running/operation of AHU and its electrical panel board, Desk top with other installation/equiptment below, lodging of complaint, Monitoring of AHU Panel Board, Pilferage theft or damages installed at INHS Asvini Comprising with following:- (i) RU Unit - 9 Nos. (ii) FCU Unit - 9 Nos. (iii) Air Handling Unit - 37 Nos. (iv) Water softing plants - 01. (v) Air Curtains - 54 Nos.
(a) Rates quoted by the contractor shall be deemed to be included cleaning of installatin and surrounding area of pump house, operation of chlorine dosing system, taking care from any pilferage/damage of installation and maintaining documents/ registers, chlorine testing register duty roster and attendance register complete all as specified and directed. (b) The rates quoted by the contractor shall be deemed to be included provision of all latest labour laws / regulation including all relevant taxes as applicable. (c) Contractor shall quoted the rates considering their monthly leaves, reliver etc as per labour laws and nothing extra shall be paid on account of the above. In case of absence of staff/tradesman from duty, payment of the that day will not be paid, In addition to that a penlaty of Rs 1500/- per day per persons will be recovered from contractor dues. also in case of long absence continously (more than one week) of staff/tradesman, the payment of that day will not be paid. The contractor shall have to claim on this account. (d) Contractor has to supply three sets of tools and plants to the labour employed by him and should be placed with the safe custody of dapartment, rates quoted shall be deemed to be included the above provision.
(a) Surprise check will be carried out by department representative and if any employes is not available at his working place, he will be treated as absent. (b) Contractor has to submit the list of employees including reserve alongwith police verification, Aadhar card, Aadhar card linked Bank Account No and relevant documents as mentioned in PS to the Engineer-in-Charge alongwith performance security before issue work order. (c) The payment shall be made to employees on or before 10th of every calender month. Payment to employees shall be done by crossed cheque / RTGS / NEFT / IMPS through Aadhar card linked Bank Account only and it shall not be less than minumum fair wages as per Act in vogue (d) Contractor has to submit proof of payment of EPF subscription made by his alongwith RAR failing which RAR will not be progressed for payment (e) Contractor has to employ the number of labours per day as intimated by the Engineer-in-Charge for which he has to make alternative arrangement. (f) The rates quoted by the contractor shall be deemed to be included provision of all latest labour laws / regulations including all relevant taxes as applicable. (g) Contractor shall quote the rates considering their monthly leaves, releiver etc as per labour laws and nothing extra shall be paid on account of the above. In case of absence of staff/tradesman from duty, payment of that day will not be paid. In addition to that a penalty of Rs 1500/- per day per person will be recovered from contractors dues. Also in case of long absence (more than one week) of staff/tradesman, the penalty shall be recovered including Sundays & Holidays if any. The contractor shall have no claim on this account.
(h) Contractor has to supply three sets of Tools and Plants (as applicable) to the labours employed by him and should be placed with the safe custody of department. Rates quoted shall be deemed to be included the above provision. (j) In case any variation in manpower as indicated in Column No 4 of BOQ due to any reasons / or any manpower held in Department or any policy change contractor should have no claim on that account. (xiii) The bidders are advised not to quote rate less than minimum fair wages as circulated by competent authority. If the quoted amount is less than the estimated cost Item No 1.01 to 1.03 i.e Rs 22,05,885.00 , the lowest bidder will have to deposit FDR/BGB as elaborated herein after in favour of Accepting Officer within 07 days of opening of financial bid (Cover No 2) . (xiv). The deposited amount shall be the difference between estimated cost i.e Rs 22,05,885.00 and amount quoted by lowest bidder for respective item. FDR/BGB shall be released only after satisfactory completion of work. If the contractor fails to pay minimum wages to employees, the department shall have right to withhold the said amount which will be verified by GE. The decision of Accepting Officer regarding amount to be withhold shall be final and binding. The withhold amount will be utilised by GE for payment to employees if contractor fails to pay minimum wages and balance amount if any shall only be released. If the lowest bidder fails to deposit the amount as stated above within 07 days, the contractor shall be banned for 06 months & his bid shall be rejected. The contractor shall sumbit 03 Nos of BGBs/FDRs of equal amount as mentioned above. The BGBs/FDRs validity shall be 04 months, 08 month & 12 months respectively for the purpose of encashment/ release as the case may be. (xv) The rates quoted shall be inclusive of suitable reliver wherever sundays & holidays are mentioned for working (m) Quotes rates should include Stationary,Uniform,Shoes,log book.etc
PART- II Repairs/ Routine maintenance of Central Air Conditioner Plant (Make:Daikin) to entire hospital, maintained twenty four hours for desire temperature of 25 degree +/-2 degree celsius and humidity of 55 +/- 5 % without interruption including repairing/replacement of damage/unserviceable of valve, chiller pipe, conderser pipe, cooling towers, insulation of chilled water pipe line, greasing of motor & pumps complete all as specified and directed.
Chiller Plant capacity of 400 TR - 3 Nos.
Condenser Pump Set of 40 HP motor capacity - 4 Nos.
Chiller Pump Set of 100 HP motor capacity - 4 Nos.
Cooling Tower (FRP) with 15/20 HP blower motor - 3 Nos.
Repairs/ Routine maintenance of Daikin make chiller No -1 Model No- PFS4302DBRY, Ser No:0000110 of capacity of 400Ton screw type double compressorincluding replacement of damaged parts like- electronic/ electric parts, equipment motor & connected parts, compressor repair & connected parts and all including day today maintenece and all parts of chiller unit excluding Compressor oil and filters.
Repairs/ Routine maintenance of Daikin make chiller No-2 Model No- PFS4302DBRY, Ser No : 0000132 of capacity of 400Ton screw type double compressorincluding replacement of damaged parts like- electronic/ electric parts, equipment motor & connected parts, compressor repair & connected parts and all including day today maintenece and all parts of chiller unit excluding Compressor oil and filters complete all as specified and directed.
Repairs/ Routine maintenance of Daikin make chiller No-3 Model No- PFS4302DBRY, Ser No : 0000131 of capacity of 400Ton screw type double compressorincluding replacement of damaged parts like- electronic/ electric parts, equipment motor & connected parts, compressor repair & connected parts and all including day today maintenece and all parts of chiller unit excluding Compressor oil and filters complete all as specified and directed.
Repairs/ Routine maintenance of Air Handling Units (Make : Carrier Aircon/ Blue Star),ducts, chilled water pipe line to entire hospital, for desire temperature of 25+/- 2 degree centigrade and humidity of 55 +/- 5% without interruptiion including repairing of damaged/ un functional valves, minor chiller water pipe insulation, duct insulation ( For chilled water pipe up to 01 meter & for duct insulation 1 sqm considered as minor) , chilled water pipe line, ducts (inlet and out let), Cleaning of Cooling coils/ filters with chemical, Fire dampers, Humidity controls system complete all as specified and directed:- (a) AHUs -37 Nos. (b) RU Unit - 9 Nos. (c) FCU Unit - 9 Nos. (d) Air Curtains -54 Nos. (e) Condenser water pipe line - 204 RM. (f) Ducting (Gi/Al) - 11459 Sq mtr. (g) Chilled water pine line Insulation -2847 RM.
NOTE:- (a) For item Nos 2.01 to 2.04 & 3.00 to 6.00 AC Mechanic have to attend local Maint complaint register, Minor faults, routine cleaning, servicing plant and filters. Any number of manpower required for carrying out the routine maintenance(Minimum 05 Nos of man power required at site for servicing and repairs) is deemed to be included in the quoted rates. b) The contractor shall ensure a Mechanical engineer (Degree or 03 yrs diploma holder) of minimum three years experience in HVAC visits the plant atleast twice in a week to check and ensure the serviciability of plant, report the same to AGE (I) Asvini or his authorised representative. (c) AC mechanic must be capable of carrying out any type of maintenance or attending breakdown in above mentioned plants. (d) Incase of any breakdown the additional man power if required will be arranged by the contractor without any price adjustment. (e) The cost of replacement of Minor parts as mentioned in appendix A enclosed here with shall be deemed to be included in quoted rates of Sch A part II Item Nos. 2.01 to 2.04 & 3.00 to 6.00
(i)Relay over load of all type and Amperage. (ii)All motor bearing as per existing size and make. (iii)Pump bearing as per existing size and make. (iv)Couplings of motors. (v)Gland packing graphical coating as per the ground required and size. (vi)Coupling bush with pin. (vii)V Belt as per required size and make. (viii)Blower bearing of any size for motor and pumps. (ix)Misc as nuts, bolts,washer etc. (x)Servogen grease as per required at site. (xi)Relay any type and rating. (xii)MCCB, MCB for any type and capacity for motor/pumps. (xiii)Pressure guage. (xiv)Temperature guage. (xv)Single phase preventers. (xvi)All types of contactors excluding chiller contactors. (xvii)Cable glands and lugs. (xviii)All motor windings below 5 HP. (xix)Minor pipe insulation & duct insulation work- up to 1 mtr.
Repairs/ Routine maintenance of VRF plants of Mitsubishi make of following capacity round the clock including maintaining the plants twenty four hours for desired temperature of 21+/-3 degree celcius without interuption including repairs/ replacement of damaged/ unserviceable minor parts, controlling valves, copper tubings, nitrile rubber insulation, and all electrical/ electronics components, control wirings, sensors,Thermistors, thermocol inner packs,indoor/ outdoor fan motor windings, vibration pads, painting of rusted out door stands and connected accessories, drainage lines, pre filters control/ communication wirings,earthings, leak test and all other accessories not mentioned in this schedule complete all as specified and directed.
(a) Out door unit of capacity 48 hp -6 Nos.
(b) Out door unit of capacity 36 hp - 6 Nos.
(c) Out door unit of capacity 24 hp - 6 Nos.
(d) Four way Way casette type indoor Unit of any capacity (Model Capacity PLFYP80VBM-E to PLFYP125VBM-E) -200 Nos.
(e) Split hi wall type indoor unit of any capacity -15 Nos .
Note:- (a) For item Nos 7.01 to 7.05 above AC Mechanic have to attend local Maint complaint register, Minor faults, routine cleaning, Dry servicing of plant and filters. Any number of manpower required for carrying out the routine maintenance(Minimum 02 Nos of High skilled Refrigerator Mechanic required at site for servicing and repairs) is deemed to be included in the quoted rates. b) The contractor shall ensure visit of OEM manufacturer Engineer monthly once and report/ serviceability of Out door units and same shall be submitted to this Office. The charges for all OEM procedures are deemed to be included in the quoted rates. The reports of OEM Engineer shall be produced before submitting RARs. (c) AC mechanic must be experienced in VRF Plants and capable for carrying out any type of maintenance or attending breakdown in above mentioned plants. (d) Incase of any breakdown the additional man power if required will be arranged by the contractor without any price adjustment. (e) The cost of replacement of all Minor parts which are not mentioned in schedule shall be deemed to be included in quoted rates Item No 7.01 to 7.05
Dismantling of Out door unit covers of any capacity completly by disconnecting/ covering all electric/electronic boards and wiring and servicing condensor coils and compressor, reservoir areas completly wet servicing by using approved chemicals by OEM manufacturer and re assembling setting all parameters by using softwares by an OEM engineer testing all included complete all as specified and directed.
Dismantling of four way/ high wall indoor unit covers of any capacity completly by disconnecting/ covering all electronic boards and wiring and servicing cooling coils, expansion valves, indoor drainage pumps, drainage lines completly wet servicing by using approved chemicals by OEM manufacturer by using tray jackets including cleaning the surface after servicing testing complete all as specified and directed.
Supply and charging of Refrigerant fresh gas R 410 complete all as specified and directed. .
Supply and fix Compressor Cat Part No- R69025478 for Out door units of VRF 18 to 16 HP Unit(Model No- PUHY-400 to 450 YHM) including testing complete all as specified and directed.
Supply and fix Control Board ,Cat Part No- R61011281 for Out door units of VRF 18 to 16 HP Unit(Model No- PUHY-400 to 450 YHM) including testing complete all as specified and directed.
Supply and fix MNET Board, Cat Part No- R 61012281 for Out door units of VRF 18 to 16 HP Unit(Model No- PUHY-400 to 450 YHM) including testing complete all as specified and directed.
Supply and fix Noise filter Cat Part No- R61015293 for Out door units of VRF 18 to 16 HP Unit(Model No- PUHY-400 to 450 YHM) including testing complete all as specified and directed.
Supply and fix Fan board Cat Part No- R 61037280 for Out door units of VRF 18 to 16 HP Unit(Model No- PUHY-400 to 450 YHM) including testing complete all as specified and directed.
Supply and fix Invertor board, Cat Part No-R61039280 for Out door units of VRF 18 to 16 HP Unit(Model No- PUHY-400 to 450 YHM) including testing complete all as specified and directed.
Supply and fix Motor YC9201A, Cat Part No- R61122220 for Out door units of VRF 18 to 16 HP Unit(Model No- PUHY-400 to 450 YHM) including testing complete all as specified and directed.
Supply and fix Compressor Cat Part No- R69025478 for Out door units of VRF 14 to 10 HP Unit(Model No- PUHY-250 -350 YHM) including testing complete all as specified and directed.
Supply and fix Control Board ,Cat Part No- R61011281 for Out door units of VRF 14 to 10 HP Unit(Model No- PUHY-250 -350 YHM) including testing complete all as specified and directed.
Supply and fix MNET Board, Cat Part No- R 61012281 for Out door units of VRF 14 to 10 HP Unit(Model No- PUHY-250 -350 YHM) including testing complete all as specified and directed.
Supply and fix Noise filter Cat Part No- R61015293 for Out door units of VRF 14 to 10 HP Unit(Model No- PUHY-250 -350 YHM) including testing complete all as specified and directed.
Supply and fix Fan board Cat Part No- R 61037280 for Out door units of VRF 14 to 10 HP Unit(Model No- PUHY-250 -350 YHM) including testing complete all as specified and directed.
Supply and fix Invertor board, Cat Part No-R61039280 for Out door units of VRF 14 to 10 HP Unit(Model No- PUHY-250 -350 YHM) including testing complete all as specified and directed.
Supply and fix Motor YC9201A, Cat Part No- R61122220 for Out door units of VRF 14 to 10 HP Unit(Model No- PUHY-250 -350 YHM) including testing complete all as specified and directed.
Supply and fix Condensor coil, for Out door units of VRF Unit(Model No- PUHY-250 -450 YHM) including leak testing by using nitrogen all as per OEM instructions complete all as specified and directed.
Supply and fix PCB for four way casette/hiwall type indoor units of VRF Unit(Model Capacity PLFYP80VBM-E to PLFYP125VBM-E) including testing complete all as specified and directed.
Supply and fix Drain Pump for four way casette/hiwall type indoor units of VRF Unit(Model Capacity PLFYP80VBM-E to PLFYP125VBM-E) including testing complete all as specified and directed.
Supply and fix Blower motor for four way casette/hiwall type indoor units of VRF Unit(Model Capacity PLFYP80VBM-E to PLFYP125VBM-E) including testing complete all as specified and directed.
Supply and fix Linear expansion Valve for four way casette/hiwall type indoor units of VRF Unit(Model Capacity PLFYP80VBM-E to PLFYP125VBM-E) including testing complete all as specified and directed.
Supply and fix Remote Controller for four way casette/hiwall type indoor units of VRF Unit(Model Capacity PLFYP80VBM-E to PLFYP125VBM-E) including testing complete all as specified and directed.
Supply and fix Cooling Coil for four way casette/hiwall type indoor units of VRF Unit(Model Capacity PLFYP80VBM-E to PLFYP125VBM-E) including testing complete all as specified and directed.
Supply and fix in repair Sensar ( Chilled water/Condensor water/ oil temp / bearing temp) complete all as specified and directed. Make: Daikin, Model Name- PFS4302DBRY for chiller of 400 TR.
Supply and Charging of Gas R 134a complete all as specified and directed
M&L for rewinding of electric motor of 943.2 Horse power (200TR) screw compressor motor make - Diakin , 3phase 50hz, 415V with super enamelled copper winding wire of suitable guage including dismantling, assembling after rewinding to its original location complete all as specified and directed
M&L for rewinding of electric motor of the following capacity, 3phase 50hz, 415V with super enamelled copper winding wire of suitable guage including dismantling, assembling after rewinding to its original location of capacity 100 Horse power (340TR) complete all as specified and directed
All as per Srl Item No. 35.00 here in before but 40 HP
All as per Srl Item No. 35.00 here in before but 25 HP
All as per Srl Item No. 4.00 here in before but 20 HP
All as per Srl Item No. 35.00 here in before but 15 HP
All as per Srl Item No. 35.00 here in before but 10 HP
All as per Srl Item No.35.00 here in before but 7.5 HP
All as per Srl Item No. 35.00 here in before but 5 HP
Taking out old unservicable Advance munter a set of fills sheet from Advance cooling tower model No- AL-091 at the site and Supply and fixing of new fills sheet of same size, quality for cooling tower as per the existing at the site complete all as specified and directed
Taking out old unservicable Advance cooling tower model No- AL-091, ABS nozzles and Supply and fixing of new cooling tower nozzles as per the existing complete all as specified and directed.
Dismantling/Taking down old unservicable FRP body structure of cooling tower carefully and cleaning the sump with chemical and supply and fixing of new FRP sheets as per size existing at site including all fixing material such as m seal other water resistance adhesive and make the cooling tower structure leak proof complete all as specified and directed
Removal of old unserviceable oil of any viscocity and make, supply and filling of gear box oil of any make and viscocity complete all as specified and directed
Dismantling/taking down old unservicable cooling coil of any size and Supply and fixing of new cooling coil 1/2" dia copper tubes and aluminium fins, the gap between two tubes not less than 20mm including inlet and outlet pipes 18 guage GI outer frame and connecting pipe lines and connected insulation AHU body refitting complete all as specified and directed
Descaling of condenser shell and tube by using chemical and nylon brush ,Taking out complete impurities by circulating chemical solution and replace unsv gasket complete and testing (with nitrogen gas)after completion of work complete all as specified and directed
Descaling of evapourator or chiller shell and tube by using chemical and nylon brush ,Taking out complete impurities by circulating chemical solution and replace unsv gasket complete and testing with nitrogen gas after completion of work complete all as specified and directed
Supply and fixing in repair of dry and wet bulb therometer of make dimple complete all as specified and directed.
Taking down old unserviceable insulation over the chiller pipe line ,cleaning water pipe surface with steel brush remove dirt/ dust M&L for chilled pipe line insulation by applying a coat of zinc chromite primer and apply a two coats of cold setting adhesive compound(CRPX) on pipes for sticking the insulation bonded mineral wool of density 144 Kg/Cum, 50mm thickness tightly pressed on th pipe up to 300mm dia seal all the joint with adhesive compound wrap the insulation surface by using one layer of polythene sheet 50mm wide pvc tape cover the entrire with chiken mesh finish the surface, of density 144 Kg/Cum and with one coat of sand and cement plaster and cover 28 guage GI cladding of approved color complete suitable for above insulated pipe section complete all as specified and directed
Taking down old unsv duct insulation, cleaning the duct surface with steel brush remove dirt/dust and make it free of mill scale , greases and foreign matter.M&L for paint the surface with two coats of bituminous paint taking spl care over non galvanised part , applying rubber based adhesive CRPX compound manufacted by shaimar Tar product on ducts sticking the fiber glass section in the form of pad with the density 24 Kg/Cum shall be fixed tightly to the surface & all joints to be sealed properly by using sealing compound,cover with aluminium foil kraft paper laminate with minimum overlap of 50mm, seal each lap joint with self adhesive aluminium foil tape 50mm wide, complete all as specified and directed
Taking down old unsv GM gate/globe/Air relief valve,Supply and fixing of new GM Gate/Globe valve with of 40mm dia complete all as specified and directed.
All as per Srl Item No. 53.00 here in before but 32mm dia.
All as per Srl Item No. 53.00 here in before but 25 mm dia.
Taking down old unsv CI butter fly valve of any make and size and supply and fixing of new CI Butter fly valve slim seal design with nitrile rubber lined seat with clutch lever (p10) as per IS 13095 of size 250mm complete all as specified and directed.
All as per Srl Item No. 56.00 here in before but but 200mm.
All as per Srl Item No. 56.00 here in before but but 150mm.
All as per Srl Item No. 56.00 here in before but but 125mm.
All as per Srl Item No. 56.00 here in before but but 100mm.
Taking down old existing MS pipes Supply , lay and welding MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc. of size 300mm complete all as specified and directed. Make:- Jindal or equivalent.
All as per Srl Item No. 61.00 here in before but but 250mm dia.
All as per Srl Item No. 61.00 here in before but but 200mm dia.
All as per Srl Item No. 61.00 here in before but but 150mm dia.
All as per Srl Item No. 61.00 here in before but but 100mm dia.
All as per Srl Item No. 61.00 here in before but but 80mm dia.
All as per Srl Item No. 61.00 here in before but but 65 mm dia.
M & L Steel structural fabrication works fabricated from structural steel sections including nuts, bolts,washers, welding ,bending cold or hot, drilling holes for bolts, in any shape or size as indicated or directed and inclusive of one primary coat, one under coat and one finishing coat of paint complete all as specified and directed.
Taking down old unserviceable/deteriorated insulation from any surface ,cleaning the steel surfaces by using wire brush etc. and supply & fix nitrile rubber insulation 19mm thickness sticking on surfaces by using approved adhesive and sealing the joints by weather proof tape complete all as specified and directed
Supply and fixing in repair of 4-1RM91 PVC Fills 300 nos are made of Virgin rigid PVC fiims, vaccum formed in shape and design of honey comb constn, even distribution of water to achieve maximum heat exchange, larger wetted surface area and high efficiency water to air heat transfer complete all as specified and as directed.
Comprehensive maintanence of all fire hydrant both single and double type,centrifugal pump set of 70 HP-2 No's,75 HP-2 No's 15HP booster pump -8 No's , fire hose, hose reel drum,gate valve, lugs, rubber washer of hydrant, pressure switch and other connceted accessories including greasing and oiling for smooth opeartion of all hydrant, butterfly valves, pump, motor gland packing ,sluice valve, hose reel,fire brigade conncetion, Hose box and keys and connected accessories including supply and replacement of unservicable minor part like inlet blank cap,chain,rubber seal,seat, O ring ,washers,gland packing such that there should no leakage of water during pressure test of minimum 3.5Kg/cm2 and easy fixing of male nozzles to any one of the hydrant valves mentioned above all as specfied and directed by Engineer-in-charge. Note:Pressure test should be done in presence of user reprenstative and obtain signed that all fire hydrant are in serviceable condition.
Excavation in trenches not exc 1.5 mtr wide and not exc 1.5 mtr in depth for floor laying of HDPE pipe and getting out in hard soil , complete all as specified and as directed .
Removing the excavated material/ soil exc 250 and not exc 500m out of MoD land complete all as specified and directed .
Returning & filling in, including spreading, levelling, watering & well ramming in layers not exc 25 cm as in soil complete all as specified & directed .
Demolition of Exisiting concrete supporting block of pumps and motor, excedding 15cm of thickness above and below ground level all specfied and directed by Engineer-in-charge
M&L cement concrete 1:2:4, type B-2 (using 40 mm graded stone aggregate) as in support of Base frame with MS bolts placed in concrete and hardstanding finishing even and fair without using extra cement all as specified.
S&F FASD starter of capacity 17.5 KW,415V ,3-phase including conncetion of motor cable to starter and testing all as specfied and directed
M& L for Disconnecting centrifugal pump from motor, suction and delivery pipe line of any Make, model and taking down packing for removing and insertion of new shaft sleeves replacements or remove Bearing or replacemnt of mechanical seal and other connected parts using bearing puller gear and fix new bearings and greasing all parts, coupling pump to motor and check for proper shaft alignments such that no vibratiobn produce during opertion of following capacity pumps. NOTE: Pump Bearing will be paid separately
Pump coupled with 75 HP motor
Pump coupled with 70 HP motor
Pump coupled with 15/30 HP motor
Supply of high performace Bearing suitable for motor and pump of capacity 75HP,70HP .Make:SFC/NBC
Supply of high performace Bearing suitable for motor and pump of capacity 15HP,20HP,30HP .Make:SFC/NBC
Supply of high performace Bearing of size 6312-2Z Make:SFC/NBC
Supply of high performace Bearing of size 6311 Make:SFC/NBC
S&F in repair AC-3 type contactor with control voltage of 230V AC with integrated auxillary or Add on block contacts with 1 or 2 NO and NC including connection of control wiring to contactor and testing of starter after repairing .
contactor rating of 12A
contactor rating of 18A
contactor rating of 25A
conatactor rating of 40A
conatactor rating of 70A
S&F in repair Thermal over load relay with adjustable setting with integrated auxillary or Add on block contacts with 1 or 2 NO and NC including connection of control wiring to OLR and testing of starter after repairing .
OLR of capacity suitable for 75HP motor
OLR of capacity suitable for 30HP motor
OLR of capacity suitable for 15HP motor
M&L for Disconnecting motor power cables of various sizes from electrical motor of different capacities and decoupling from the pump sets,removing and taking down carefully and transporting to authorised workshop ,Dismantaling stator and rotor carefully and rewinding stator assembly with supper enamelled copper winding wire of suitable gauge matching to existing gauge and cleaning of slots ,core with carbon tetra chloride solution and apply two coats of insulation varnish and keep stator assembly in heating chamber to improve insulation strength ,reassemble motor completey and transporation to site ,coupling pump to motor and check for proper shaft alignments such that no vibratiobn produce during opertioncoupling to pump with exact allinment ,connect power cables to motor and testing of following capacity motor
Supply ,install , testing and commissioning automatic/manual fire pump starter control panel ,automatic operation based on pressure sensor ,protection aganist dry run of pump, in replacement, indoor type, Aluminium bus bar with colour coded heat shrinkable sleeves, IP 43 Protection class, factory fabricated, cubical panel, wall mounted, self supported, made out of 2mm thick CRCA sheet with locking arrangement, one sides openable, dust vermin proof suitable for 3 phase 4 wire 415 volt 50Hz AC including suitable size copper insulated conductor control wiring,current transfomer,3 phase indication lamps for incoming on/off ,pump om/off indication,3 line multi function digital multi meter and powder coating, connecting the cable with necessary cable glands, lugs etc for all incoming & outgoing cables, proper arrangement for ventilation , making necessary alterations to existing GI pipe for holding pressure gauge,sensor and gate valve for on/off sensor and Accomodating the following items all as directed & specified by engineer -in- charge Panel consist of following items (a) 415V,63A main MCCB 4P Ics=100%Icu ,Rupturing capacity of 36KA-1 no's (b) FASD starter suitable for 15HP motor -1 No's. ( c) Pipe mounted pressure switchs,pressure gauge -2 No's and control wiring from sensor to panel for auto on/off of pump. (d) Flush Mounted multifunction meter with 3 line LED display of accuracy class 1 -1 N0's Make:L&T Model No:4405 series 0r equivalent model (e) All other necessary sensors , wiring , accesories required for auto/manual operation of above panel should be include in quoted rates.
Supply and fix in repair of of M.S. fabricated Common base plate of suitable size and thickness of 5mm for 75/7HP pumpsets with Anti vibration pads on four side duly applied anti corrison paint, foundation bolts etc. as required and check for proper shaft alignments such that no vibratiobn produce during opertion using Laser Shaft Alignment system including removing old MS base plate and disconnection and connection of suction and delivery line all as specified and directed by Engr-in-Charge.
Supply and fix in repair of of M.S. fabricated Common base plate of suitable size and thickness of 5mm for 30/15HP pumpsets with Anti vibration pads on four side duly applied anti corrison paint, foundation bolts etc. as required and check for proper shaft alignments such that no vibratiobn produce during opertion using Laser Shaft Alignment system including removing old MS base plate and disconnection and connection of suction and delivery line all as specified and directed by Engr-in-Charge.
Taking out old unserviceable and S & F rubberized fabric reinforced rubber lined fire hose (RRL Hose) including gunmetal male and female instantaneous type of coupling hose confirming to IS 636 type II and coupling confirming IS 903-1975 in all respect 15 mtr long complete all as specified and as directed by Engineer-in-Charge
Fixing in replacement Fire Hydrant valve double headed gun metal suitable for 100 mm pipe sections completely including nut bolts, packing and connected item all as specified and as directed by Engineer-in-Charge
Fixing in replacement Fire Hydrant valve single headed gun metal suitable for 80 mm pipe sections complete including nut bolts, packing and connected item all as specified and as directed by Engineer-in-Charge
Fixing in replacement Gun metal ball Valve heavy duty suitable for 25 mm bore dia bore Pipe lines complete including nut bolts, packing and connected item all as specified and as directed by Engineer-in-Charge
Taking out old unserviceable and S & F cast iron swing check type reflex valve (non return valve) heavy duty double flanged complete with by pass arrangement, designed for a pressure of 7 kg/sq, cm of size 100 mm bore all as directed.
Taking out old unserviceable and S & F cast iron swing check type reflex valve (non return valve) heavy duty double flanged complete with by pass arrangement, designed for a pressure of 7 kg/sq, cm of size 150 mm bore all as directed.
Supply and fix sluice valve of size 150mm dia PN1.6 including flanges, nut, bolts and welding all as specfied and directed by Engineer-in-charge
Supply and fix sluice valve of size 100mm dia PN1.6 including flanges, nut, bolts and welding all as specfied and directed by Engineer-in-charge
Material and labour for painting of external fire hose cabinets, Fire lines etc with one coats of synthetic enamel paint colour red on external surfaces ,one coat of red oxide primer after preparation of surfaces complete all as speicified and and directed by Engineer-in-Charge.
Supply & fixing in replacement Fire Brigade inlet connection 2 way complete all as specified and as directed by Engineer-in-Charge
Supply and fixing in replacement of damaged glass wired glass panes 6 mm thick suitable for existing fire cabinet outdoor type complete all as specified and as directed by Engineer-in-Charge
Supply and fixing in replacement of gun metal lugs suitable for existing fire cabinet indoor type complete all as specified and as directed by Engineer-in-Charge
Taking out damaged unserviceable heavy duty GI pipe sections from existing Fire lines of any and supply and fix heavy duty GI pipe ISI including welding, welding of flanges,nuts bolts specifictions complete all as specified and as directed by Engineer-in-Charge of following size
(a) GI pipe 100mm bore
(b) GI pipe 150mm bore
Supply and fix MS fittings like Tee, elbow,bend ,reducer and other fittings as per site requiremnt all as specfied and directed
Supply and fix foot valve ball type of size 200mm dia complete all as specified and as directed by Engineer-in-Charge.
Supply and fix MIMC panel of size 2000mm×1000mm layout showing fire fighting pipeline system location hydrant,riser,fire brigade inlet valve,pump houses,valve,valves chambers including LED lights fiiting inside for night vision of board all as specified and as directed by Engineer-in-Charge.
Supply and fix MIMC panel of size 2000mm×1000mm layout showing water supply pipeline system, pump houses,valve,valves chambers including LED lights fiiting inside for night vision of board all as specified and as directed by Engineer-in-Charge.
Taking down existing conventional type fire and smoke detector and Supply, Installation,Testing & Commissioning of Analog Addressable Intelligent multisensor detector, (Heat & Smoke) with duel angle angle decentralize intelligence, soft addressable Photo thermal ( Dual Optical with Forward and backward scattering to eliminate false fire signature & One Thermal Chambers) type, decentralize intelligence with inbuilt fault isolator wiring complete with base as required .Make: Honeywell or equivalent make compatible to existing system.
Taking down existing Manual Call Point and Supply, installation, testing & commissioning of Addressable Manual Call Points with built in fault isolator and same shall be made of ABS plastic, square in shape Surface /Flush Mounting with mounting base & required accessories. Make: Honeywell
Replacement of PVC conduit 25 mm size heavy duty (white colour) including clamps and screws and fixing arragement complete all as specified and as directed by Engineer-in-Charge. Make : Polycab
Supply and laying in replacement two core 1.5 Sq.mm, Multistranded, twisted Copper cable, FRLS Armoured cable laid through existing conduit / fixed to wall / ceiling / loop using proper clamps / clips complete all as specified and as directed by Engineer-in-Charge. Make: Polycab
Supply and fix reponse indicator of suitable size including ncessary wiring from the dector to RI all as specfied and directed by Engineer-in-Charge.
Repairs/ maintenance of fire detection and alarm system including testing complete with Micoprocessor based fire alarm control panels (01 Nos) in P-72 (Hospital Building) including attending the fire alarm system faults, testing, checking including labor for replacement of unserviceable components mentioned below . The fire alarm system -01 Nos. with the following:
(a) Response indicator (b) Audio alarm (Hooter) (c) Manual Call Point (d) Multisensor Detector
Replacement of unserviceable batteries of capacity 12 V 7 AH dry type complete all as specified and as directed by Engineer-in-Charge. Make: Exide
Provision of full rehearsal/ drill of fire fighting practice by opening the sluice valves, hydrants and landing valves, fixing of hose reel, checking serviceability of fire brigade inlets and any other works required for the practice including required manning and instructed by Engineer-in-Charge and provisioning of washers for hydrants. Note :- Penalty at the rate of Rs. 5000 per building per month shall be imposed on the contractor if fire fighting practice is not carried out during a month.
Supply and fix flow meter of size 300mm including calbirating and obatin certifiacte,necessary alterations to pipe line for fixing of meter all as specfied and directed
Material and labour for manfacture of duplicate key of two sets for opening of fire alram panel existing at different location all as specfied and directed
Repairs/ maintenance of fire detection and alarm system complete with Micoprocessor based fire alarm control panel of Dental Block including attendIing the fire alarm system faults, testing, checking including replacement of unserviceable components mentioned in str No.50,51. The fire alarm system consisting of Qty-2 Nos.
Removing existing automatic fire detection and alaram system of 8 loop 128 module and refixing at another location including disconnceting connceting fire cable ,other conncted accessories like MCP,response indicator kept at safe safe and reuse at another location refixing the same items including drawing cable and made panel working all as specfied and directed by Engineer-in-charge.
cooltech engineering services
BRITE INDUSTRIES
shakti engineering and electrical works
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .