| 1 | L1₹21.8 LAccepted-AOC 306 SHIV BARI MARG PANCHVATI NAGAR BATHINDA 151001 PB | BATHINDA | BATHINDA | PUNJAB | 151001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹22.2 L+₹39,897 (1.83%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹22.9 L+₹1.1 L (5.06%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹24.9 L+₹3.2 L (14.6%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹27.7 L+₹5.9 L (27.3%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹78,000
Closing Date
7 Jan 2021, 6:00 pmClosed
CWE
HQ CWE AF Bhisiana
OUTSOURCING SERVICES FOR EXTERNAL AND DG SYSTEM AT AF STATION BHISIANA
2020_MES_403014_1
CWE(BHI)/BHI-32/2020-21
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
AFS Bhisiana
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
GE AF Bhisiana
₹78,000
Yes
11 Jan 2021
12 Dec 2020
9 Jan 2021
12 Dec 2020
7 Jan 2021
26 Dec 2020
12 Dec 2020 - 21 Dec 2020
Amount
Manning and Operation including Preventive maintenance of DG Set of capacity mentioned below with AMF Panel, directly coupled with alternator 3 phase neutral 440/415 volts, round the clock (i.e for 24 Hours) in three shifts of 08 hours duration each with one operator per shift on all days including Sunday and Holiday.
The operator opretes 40 KVA, 30 KVA DG Set Installed at SMC, 82.5 KVA Dg Set installed at IT section, 82.5 KVA Dg Set installed at Station Exam Section and 30 KVA DG Set and Central AC Plant installed at certain technical building also monitering the Dg set installed at Silver jubilee pump house, Ahuja complex, Pump house, Mini pump house, Sewage no 01 and Sewage No 02.
60 KVA DG Set Installed at Signal Centre, 100 KVA DG Set installed at HQ Bldg, 30 KVA DG Set installed at IFATS Bldg, 2x25 KVA DG Set installed at Jaguar Bldg, 62.5 KVA Dg Set installed at Armoury. The operator also operate the Package A/C Plant installed at Signal Centre.
100 KVA Dg Set,160 KVA DG Set - 02 Nos Installed at P-4,40 KVA Parameter No 01 DG set . The operator also operate the Central type A/C Plant 02 Nos installed at P-4.
75 KVA Dg Set installed at 17 Sqn, 75 KVA Dg Set installed at 31 ORP, 30 KVA Dg sets installed at Blast Pen No 05,06,08,10, 35 KVA Dg sets installed at Parameter No 02 & 03, 30 KVA Dg set installed at 2211 Sqn and 20 KVA Dg set installed at 13 ORP.
Manning and Operation including Preventive maintenance of DG Set of capacity mentioned below with AMF Panel, directly coupled with alternator 3 phase neutral 440/415 volts, in two shifts (i.e for 16 Hours) of 08 hours duration each with one operator per shift on all days including Sunday and Holiday.
200 KVA, 160 KVA and 62.5 KVA DG Set Installed at CEO Complex The operator also operate the A/C Plant installed at CRRWand photo section in two shifts for 08 hours .
Notes applicable for Serial item No. 1.00 to 2.01:- Note :-The Contractor shall ensure the following before quoting the rate :- (i) Payment will be made through bank as per Labour Act. (ii) Provident Fund shall be Paid. (iii) Contractor shall be obtain the License and registration from Labour Commissioner (iv) Any lapse in the payment to Tradesmen/Helper the contractor will solely responsible. (v) Reliever to be provided for each person working continue for 6 days is deemed to be included in quoted rate. (vi) All DG Set Installations shall be handed over in operation state at the time of commencement of contract and shall be taken in the same state at the time of completion of contract period. (vii) Daily cleaning of DG Sets installation shall be carried out by the contractor without any extra cost, the rate quoted shall be deemed to be included for the same (viii) Daily cleaning of all rooms i,e floor, walls and ceiling of installation including internal electrical fixtures. (ix) Removing of vegetation growth, cleaning/brooming of open areas of installation surrounding approx 8 mtrs.(v) No unauthorised person shall be allowed to enter in the Installation. (x) The Operator should have minium qualification ITI or two years experience. (xi) The contractor shall also employ one electrician/DG Mechanic for maint/repair to electric panel/DG Set for minor repair as and when required. (xii) The contractor shall maintain a proper log sheet for daily running of DG Set Installation and record of running to be produced to the Engr-in-Charge and hand over the log sheet to the JE E/M in charge. (xiii) The operating personnel shall be provided with protective clothing & shall wear them while operating the plant. In case of any accident/injury, fatal or partial disability, the contractor shall be solely responsible for settling all claims/compensation. Department will have a right to recover any sum indicated/claimed by labour commissioner/court directive. The Contractor shall ensure provided all adequate & required means to the workmen for safety as per norms and also contractor will get his personnel insured.
Notes (Contd.......) DG Set Operator/Helper will carry out the following maintenance works- a) Checking of Engine Oil level. b) Checking of oil bath cleaner oil level c) Drain sediments from fuel tank. d) Checking of pre- cleaner dust pan e) Checking of air cleaner restriction. f) Checking of coolant level g) Record Oil pressure.. h) Checking /tightenig of all bolts / nuts of engine and alternator. j) Checking of AVM pads. k) Checking of diaphragm coupling l) Clean fuel tank breather m) Checking of Air piping n) Cleaning of oil bath Air cleaner Tray screen. o) Check / adjust Belts p) Checking battery voltage, water level and apply jelly on terminals. q) Checking fan hub / air blower hub and water pump. r) Tighten manifold Nuts and screws s) Cleaning of electrical connections with CTC solution. t) Checking of safety contols u) Cleaning of cooling system v) Cleaning of Engine and radiator assy.
M/s Vee Kay Associates
Aman Enterprises
M/s GURFATEH BUILDERS
Dhriti Constructions
NAIB ENTERPRISES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .