Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 121004 | Admitted-Finance |
| 2 | Admitted-Finance 121004 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
30 Apr 2019, 3:00 pmClosed
Mr Sushant Deshpande
thyssenKrupp Industrial Solutions (India) Private Limited (Formerly Uhde India Private Limited) Uhde House, L B S Marg, Vikhroli (W), Mumbai - 400083, India.
Supply Of Cryogenic Centrifugal Pumps for Naphtha Cracker Expansion Project at Panipat Refinery
2019_REFHQ_90104_1
6714-PPM-00-EC-0024
Limited
Mechanical - Pumps, Compressors, Steam Turbines and Other Equipment
Supply
330 days
IOCL Panipat
As per tender documents
4 documents required · 4 mandatory
Exempted
20 Feb 2020
12 Jan 2019
2 May 2019
12 Jan 2019
30 Apr 2019
4 Feb 2019
Supply of Cryogenic Centrifugal Pumps for Naptha Cracker Expansion Unit
Design, Supply of Material, Manufacture, Inspection, Testing, Painting, Documentation and Preparation for Shipment of ERU DEMETHANIZER REFLUX PUMPS Tag no: 17-P-9103 A/B , Accessories & auxilliary Systems, Commissioning spares,Mandatory spares, Special tools & tackles, Third party Inspection and other miscellaneous items as per MR and scope of supply for Naptha Cracker Expansion Unit for IOCL PANIPAT REFINERY as specified in Material Requisition.
Design, Supply of Material, Manufacture, Inspection, Testing, Painting, Documentation and Preparation for Shipment of ERU DEMETHANIZER BOTTOMS PUMPS TAG NO: 17-P-9104 A/B, Accessories & auxilliary Systems, Commissioning spares,Mandatory spares, Special tools & tackles, Third party Inspection and other miscellaneous items as per MR and scope of supply for Naptha Cracker Expansion Unit for IOCL PANIPAT REFINERY as specified in Material Requisition.
Design, Supply of Material, Manufacture, Inspection, Testing, Painting, Documentation and Preparation for Shipment of ERU DEETHANIZER REFLUX PUMPS TAG NO: 17-P-9105 A/B , Accessories & auxilliary Systems, Commissioning spares,Mandatory spares, Special tools & tackles, Third party Inspection and other miscellaneous items as per MR and scope of supply for Naptha Cracker Expansion Unit for IOCL PANIPAT REFINERY as specified in Material Requisition.
Design, Supply of Material, Manufacture, Inspection, Testing, Painting, Documentation and Preparation for Shipment of EBR PUMP-OUT PUMP TAG NO: 17-P-9201, Accessories & auxilliary Systems, Commissioning spares,Mandatory spares, Special tools & tackles, Third party Inspection and other miscellaneous items as per MR and scope of supply for Naptha Cracker Expansion Unit for IOCL PANIPAT REFINERY as specified in Material Requisition.
Charges for Site Supervision of erection, testing and commissioning of Cryogenic Centrifugal Pumps for Naptha Cracker Expansion Unit
Per diem charges for upto 8 hours work on normal working days.
Overtime rate / hour beyond normal 8 hours work on normal working days.
Overtime rate / hour for work on weekly off days / holidays (as applicable to Refinery site).
Charges for 2 years Operation and Maintenance Spares for Cryogenic Centrifugal Pumps for Naptha Cracker Expansion Unit
Lumpsum Charges for 2 years Operation and Maintenance Spares of ERU DEMETHANIZER REFLUX PUMPS Tag no: 17-P-9103 A/B -Please provide separate price break up in BoQ2
Lumpsum Charges for 2 years Operation and Maintenance Spares of ERU DEMETHANIZER BOTTOMS PUMPS TAG NO: 17-P-9104 A/B -Please provide separate price break up in BoQ2
Lumpsum Charges for 2 years Operation and Maintenance Spares of ERU DEETHANIZER REFLUX PUMPS TAG NO: 17-P-9105 A/B -Please provide separate price break up in BoQ2
Lumpsum Charges for 2 years Operation and Maintenance Spares of EBR PUMP-OUT PUMP TAG NO: 17-P-9201 -Please provide separate price break up in BoQ2
Description of Work / Item(s)
Break Up of 2 years Operation and Maintenance Spares for ERU DEMETHANIZER REFLUX PUMPS Tag no: 17-P-9103 A/B) for Naptha Cracker Expansion Unit Quoted in BOQ1 Sl. No. 3.01
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Break Up of 2 years Operation and Maintenance Spares for ERU DEMETHANIZER BOTTOMS PUMPS TAG NO: 17-P-9104 A/B for Naptha Cracker Expansion Unit Quoted in BOQ1 Sl. No. 3.02
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Break Up of 2 years Operation and Maintenance Spares for ERU DEETHANIZER REFLUX PUMPS TAG NO: 17-P-9105 A/B for Naptha Cracker Expansion Unit Quoted in BOQ1 Sl. No. 3.03
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Break Up of 2 years Operation and Maintenance Spares for EBR PUMP-OUT PUMP TAG NO: 17-P-9201 for Naptha Cracker Expansion Unit Quoted in BOQ1 Sl. No. 3.04
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Enter Item Description here
Description of Work / Item(s)
Cost Component for Sr. No. 1.01 of BOQ1
Direct Material Cost
Direct Labour Cost
Factory Overhead
Total Production Cost (1.01 + 1.02 + 1.03)
Cost Component for Sr. No. 1.02 of BOQ1
Direct Material Cost
Direct Labour Cost
Factory Overhead
Total Production Cost (2.01 + 2.02 + 2.03)
Cost Component for Sr. No. 1.03 of BOQ1
Direct Material Cost
Direct Labour Cost
Factory Overhead
Total Production Cost (3.01 + 3.02 + 3.03)
Cost Component for Sr. No. 1.04 of BOQ1
Direct Material Cost
Direct Labour Cost
Factory Overhead
Total Production Cost (4.01 + 4.02 + 4.03)
Description of Work / Item(s)
GUARANTEED POWER CONSUMPTION FOR ERU DEMETHANIZER REFLUX PUMPS Tag no: 17-P-9103 A/B)
GUARANTEED POWER CONSUMPTION FOR ERU DEMETHANIZER BOTTOMS PUMPS TAG NO: 17-P-9104 A/B
GUARANTEED POWER CONSUMPTION FOR ERU DEETHANIZER REFLUX PUMPS TAG NO: 17-P-9105 A/B
GUARANTEED POWER CONSUMPTION FOR EBR PUMP-OUT PUMP TAG NO: 17-P-9201
Sulzer Pumps India Private Limited
Sulzer Pumps India Private Limited
Sulzer Pumps India Private Limited
Bidder Name
Flowserve India Controls Private Limited
Sulzer Pumps India Private Limited
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Portion of Quoted Rate in Currency
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Portion of Quoted Rate in Currency
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Description of Work / Item(s)
GUARANTEED POWER CONSUMPTION FOR ERU DEMETHANIZER REFLUX PUMPS Tag no: 17-P-9103 A/B)
GUARANTEED POWER CONSUMPTION FOR ERU DEMETHANIZER BOTTOMS PUMPS TAG NO: 17-P-9104 A/B
GUARANTEED POWER CONSUMPTION FOR ERU DEETHANIZER REFLUX PUMPS TAG NO: 17-P-9105 A/B
GUARANTEED POWER CONSUMPTION FOR EBR PUMP-OUT PUMP TAG NO: 17-P-9201
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .