Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.0 LAdmitted-Finance | -15.00% | ₹4.0 L | L1 | Admitted-Finance |
| 2 | L2₹4.2 L+₹18,526.49 (4.58%)Admitted-Finance | -11.11% | ₹4.2 L+₹18,526.49 (4.58%) | L2 | Admitted-Finance |
| 3 | L3₹4.9 L+₹80,964.09 (20.0%)Admitted-Finance | +2.00% | ₹4.9 L+₹80,964.09 (20.0%) | L3 | Admitted-Finance |
Tender Value
₹4.8 L
EMD Value
₹9,520
Closing Date
12 Aug 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Construction of Tin shed near Bua Datti Devsthan of Barber community at Rehal Kalandrian Pyt. Rehal Kalandrian Block Bishnah under PRI Capex for the Financial Year 2026-2027.
2026_RDPR_318268_2
e-NIT No. 280 REWJ of 2026-27 dated 27-07-2026
Open Tender
Civil Works
Percentage
30 days
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹9,520
5 Sept 2026
28 Jul 2026
13 Aug 2026
28 Jul 2026
12 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Labour engaged for general site clearance. | 5 | No. | 553 | ₹2,765 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 5 | cum | 479.3 | ₹2,396.5 |
| 3 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 0.62 | cum | 4,826.5 | ₹2,992.43 |
| 4 | CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in positionreinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 3.29 | cum | 7,104.35 | ₹23,373.31 |
| 5 | FORM WORK Centering and shuttering including strutting, propping etc. and removal of form for: Columns | 18.74 | sqm | 742.55 | ₹13,915.39 |
| 6 | Reinforcement for R.C.C work including cutting, bending , binding etc. | 262.87 | kg | 123.2 | ₹32,385.58 |
| 7 | Steel work in built up tubular(round,square or rectanular hollow tubesetc) including cutting hoisting fixing in position and applying a priming coat of steel primer incl. Welding and bolted with special shaped washers etc. | 1,767.07 | kg | 156.95 | ₹2,77,341.64 |
| 8 | Providing and fixing precoated galvanised iron profile (size shape and pitch of corrugated sheets as approved by engineer in charge ) 0.50mm total coated thickness with zinc coating 120 gm per sqm as per IS 277 in 240 mpa steel grade 5.7 microns primer on both sides as per specifications in schedule 2022 complete job | 130.11 | sqm | 706.5 | ₹91,922.72 |
| 9 | Earthfilling in layers using local earth including 05 km initial carriage including ramming watering | 33.98 | cum | 276.6 | ₹9,398.87 |
| 10 | Sand + Bajri for (25km) | 21 | cum | 465.14 | ₹9,767.94 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_1047663.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .