| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.5 LAccepted-AOC | ₹11.5 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹11.7 LRejected-AOC | ₹11.7 L | 2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | CHANDRASEKARAN C L2 | RAVI K L1 |
|---|---|---|---|---|---|
| 1.00 | Picking 5cm to 10cm ols metalled surface and sectioning | 350 | Sqm | 28 ₹9,800 | 23.3 ₹8,155 |
| 2.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B | 189 | Cum | 142 ₹26,838 | 131.7 ₹24,891.30 |
| 3.00 | Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 50.4 | Cum | 882 ₹44,452.80 | 857 ₹43,192.80 |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 157.5 | Cum | 2,830 ₹4.5 L | 2,817.8 ₹4.4 L |
| 5.00 | Providing and applying Primer Coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 7kg/10sqm using mechanical means as per MORD Technical Specification Clause 502 | 1,050 | Sqm | 89 ₹93,450 | 85 ₹89,250 |
| 6.00 | Providing and applying Tack Coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 2.50kg/10sqm on the prepared granular surface treated with prime & cleaned with Hydraulic broom as per MORD Technical Specification Clause 502 | 1,050 | Sqm | 21 ₹22,050 | 19.6 ₹20,580 |
| 7.00 | Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete | 1,050 | Sqm | 328.7 ₹3.5 L | 328.7 ₹3.5 L |
| 8.00 | Provision for Name board | 1 | Nos | 3,500 ₹3,500 | 3,500 ₹3,500 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,78,371.14 ₹1.8 L | 1,76,131.37 ₹1.8 L |
Tender Value
₹11.7 L
EMD Value
₹11,700
Closing Date
29 Sept 2025, 3:00 pmClosed
The Block Development Officer(BP)
Panchayat Union, Thirumanur
Strengthening the road from PUE School to Mayanam road Km 0/0-0/280 in Vettriyur Panchayat in Thirumanur Block of Ariyalur District Under SFC (D.Pt) 2025-26
2025_RDTN_608980_1
RC.No.A2/2515/2025, Date.22.09.2025
Open Tender
Civil Works - Roads
90 days
Thirumanur
As per tender document
5 documents required · 5 mandatory
₹0
₹11,700
25 Feb 2026
26 Sept 2025
29 Sept 2025
26 Sept 2025
29 Sept 2025
26 Sept 2025
Amount
Picking 5cm to 10cm ols metalled surface and sectioning
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5
Providing and applying Primer Coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 7kg/10sqm using mechanical means as per MORD Technical Specification Clause 502
Providing and applying Tack Coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 2.50kg/10sqm on the prepared granular surface treated with prime & cleaned with Hydraulic broom as per MORD Technical Specification Clause 502
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
CHANDRASEKARAN C (BID ID -1474803)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid