| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹38.8 LAccepted-AOC | ₹38.8 L | L-1 | Accepted-AOC Accepted as per TCR |
| 2 | L-2₹40.0 L+₹1.2 L (3.01%)Rejected-Finance | ₹40.0 L+₹1.2 L (3.01%) | L-2 | Rejected-Finance Rejected as L-2 bidder |
| 3 | L-3₹48.8 L+₹10.0 L (25.7%)Rejected-Finance | ₹48.8 L+₹10.0 L (25.7%) | L-3 | Rejected-Finance Rejected as L-3 bidder |
| Sl No | Description | Qty | Unit | MIR AZAM KHAN L3 | A.H. KHAN L2 | MASUD AKHTAR KHAN L1 |
|---|---|---|---|---|---|---|
| 1.00Work Description A | ||||||
| 1.01 | Stone fall cleaning and stacking in regular stack | 301.92 | Cum | 905.23 ₹2,73,307.04 | 710 ₹2,14,363.2 | 700 ₹2,11,344 Lowest |
| 1.02 | Roof bolting and jamming at junction (stone) | 263 | Nos | 467.53 ₹1,22,960.39 | 305 ₹80,215 | 300 ₹78,900 Lowest |
| 1.03 | Recess cutting in soft stone by hand (floor) | 13.92 | Cum | 7,241.82 ₹1,00,806.13 | 6,150 ₹85,608 | 4,000 ₹55,680 Lowest |
| 1.04 | Recess cutting in coal | 4.32 | Cum | 2,327.73 ₹10,055.79 | 2,270 ₹9,806.4 | 1,800 ₹7,776 Lowest |
| 1.05 | RCC (1:2:4) with reinforcement | 153.12 | Cum | 6,265.82 ₹9,59,422.36 | 5,250 ₹8,03,880 | 4,000 ₹6,12,480 Lowest |
| 1.06 | Centering and shuttering | 408 | Sqm | 1,809.92 ₹7,38,447.36 | 1,360 ₹5,54,880 Lowest | 1,400 ₹5,71,200 |
| 1.07 | Duggi cutting in coal (48 nos girder) | 2.16 | Cum | 6,517.64 ₹14,078.1 | 6,150 ₹13,284 | 3,000 ₹6,480 Lowest |
| 1.08 | PCC (1:2:4) for duggi jamming | 0.96 | Cum | 5,288.17 ₹5,076.64 | 5,631 ₹5,405.76 | 3,000 ₹2,880 Lowest |
| 1.09 | Girder standard section carrying, lowering through pit transporting, carrying to the working place, sizing and placing at roof and jamming | 48 | Nos | 3,651.28 ₹1,75,261.44 | 2,650 ₹1,27,200 | 1,500 ₹72,000 Lowest |
Tender Value
₹51.9 L
EMD Value
₹65,000
Closing Date
26 Mar 2026, 5:00 pmClosed
General Manager, Kunustoria Area, ECL
O/o the General Manager, Kunustoria Area, ECL, PO- Toposi, Dist- Paschim Bardhaman, 713362, WB
Support with RCC side wall with girder at various junctions at Kenda Top seam of Kunustoria Colliery under Kunustoria Area
2026_ECL_355800_1
GM/KNT/CMC/NIT/25-26/847 Dt. 06.03.2026
Open Tender
Civil Works - Others
Item Rate
210 days
Kunustoria Coliery, Kunustora Area
Please refer tender documents
5 documents required · 5 mandatory
₹65,000
20 Jul 2026
10 Mar 2026
27 Mar 2026
10 Mar 2026
26 Mar 2026
11 Mar 2026
11 Mar 2026 - 19 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Work Description A | |||||
| 1.01 | Stone fall cleaning and stacking in regular stack | - | Cum | 963.93 | - |
| 1.02 | Roof bolting and jamming at junction (stone) | - | Nos | 497.85 | - |
| 1.03 | Recess cutting in soft stone by hand (floor) | - | Cum | 7,711.45 | - |
| 1.04 | Recess cutting in coal | - | Cum | 2,478.68 | - |
| 1.05 | RCC (1:2:4) with reinforcement | - | Cum | 6,672.15 | - |
| 1.06 | Centering and shuttering | - | Sqm | 1,927.29 | - |
| 1.07 | Duggi cutting in coal (48 nos girder) | - | Cum | 6,940.3 | - |
| 1.08 | PCC (1:2:4) for duggi jamming | - | Cum | 5,631.1 | - |
| 1.09 | Girder standard section carrying, lowering through pit transporting, carrying to the working place, sizing and placing at roof and jamming | - | Nos | 3,888.06 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Tendernotice_1.pdf
PDF • 1.40 MB
Tendernotice_2.pdf
PDF • 2.00 MB
BOQ_368662.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .