Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 LAccepted-AOC | ₹16.6 L Quoted ₹16.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹18.0 LRejected-AOC | ₹18.0 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | DIVYA ENGINEERING | ASHWATH MARINE INFRA PRIVATE LIMITED |
|---|---|---|---|---|---|
| 1.00 | Chipping and cleaning the existing damaged plastered surface from walls rate including cost of all labour, lead, lift etc., complete. | 593.52 | M2 | 5,341.68 ₹6,303.18 | 5,715.6 ₹6,744.41 |
| 2.00 | Special ceiling plastering with C.M.1:3, 10 mm thick for RCC works including cost of all materials, labours, lead, lift, curing, etc. complete. | 12.04 | M2 | 3,913 ₹4,617.34 | 4,186.91 ₹4,940.55 |
| 3.00 | wall Plastering with C.M 1:5, 20 mm thick including cost of all materials, labours, lead, lift, curing, etc. complete | 270.73 | M2 | 1,53,233.18 ₹1.8 L | 1,63,959.5 ₹1.9 L |
| 4.00 | Dismantling the spalled / distressed RCC and loose particles from the existing concrete including roughening the surface after thorough cleaning, rate including cost of all labour, lead, lift etc., complete. | 3.6 | M3 | 16,491.6 ₹19,460.09 | 17,646.01 ₹20,822.29 |
| 5.00 | Providing Micro concrete using Rendroc RG/ equivalent to the distressed/ spalled concrete pedestals by applying one coat of Nitozinc/ equivalent primer after thorough cleaning of rust in the reinforcement, fabricating and erecting slurry tight form work with plywood shutters with suitable supports which do not deform or leak due to pressure of micro concrete, mixed micro concrete should be placed continuously for an average thickness of 75mm, applying one coat of polymer modified acrylic emulsion (Nitobond AR /equivalent) on the finished surface as a curing membrane, applying DEKGUARD/ equivalent primer by spraying to the concrete surface, and applying Two coat of DEKGUARD/ EQIVALENT top coat to the concrete surface by brush or roller (coating should be done continuously without any break), rate including cost of all materials, labour, lead, lift, T&P's etc., complete. | 94.95 | M2 | 3,67,646.4 ₹4.3 L | 3,93,381.65 ₹4.6 L |
| 6.00 | Providing two coats of emulsion to the outer wall surfaces after through scrapping the old colour washed surface rate including cost of materials, labour, lead, lift etc., complete. | 3,430.94 | M2 | 7,71,961.5 ₹9.1 L | 8,25,998.81 ₹9.7 L |
| 7.00 | PCC 1:5:10 mix using 40 mm jelly for foundation including cost of materials, labours, lead, lift etc., complete. | 47.19 | M3 | 2,47,794.69 ₹2.9 L | 2,65,140.32 ₹3.1 L |
| 8.00 | Providing PCC 1:1.5:3 screed concrete using OP/PP Cement with 6mm - 10mm HBG metal (machine crushed) including cost of materials, labours, T&P's, leads, curing etc., complete. | 15.73 | M3 | 1,13,256 ₹1.3 L | 1,21,183.92 ₹1.4 L |
Tender Value
Refer Docs
EMD Value
₹14,800
Closing Date
14 Oct 2025, 2:00 pmClosed
CE TTPS Thoothukudi
Office of the SE Civil TTPS Thoothukudi
Repair and Maintenance Works to the Outside of North and South Wall of Switchyard 1 of Unit 3
2025_EB_609110_1
CE SE C TTPS 265 2025 26
Open Tender
Civil Works - Others
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,800
Yes
14 May 2026
26 Sept 2025
15 Oct 2025
26 Sept 2025
14 Oct 2025
26 Sept 2025
Chipping and cleaning the existing damaged plastered surface from walls rate including cost of all labour, lead, lift etc., complete.
Special ceiling plastering with C.M.1:3, 10 mm thick for RCC works including cost of all materials, labours, lead, lift, curing, etc. complete.
wall Plastering with C.M 1:5, 20 mm thick including cost of all materials, labours, lead, lift, curing, etc. complete
Dismantling the spalled / distressed RCC and loose particles from the existing concrete including roughening the surface after thorough cleaning, rate including cost of all labour, lead, lift etc., complete.
Providing Micro concrete using Rendroc RG/ equivalent to the distressed/ spalled concrete pedestals by applying one coat of Nitozinc/ equivalent primer after thorough cleaning of rust in the reinforcement, fabricating and erecting slurry tight form work with plywood shutters with suitable supports which do not deform or leak due to pressure of micro concrete, mixed micro concrete should be placed continuously for an average thickness of 75mm, applying one coat of polymer modified acrylic emulsion (Nitobond AR /equivalent) on the finished surface as a curing membrane, applying DEKGUARD/ equivalent primer by spraying to the concrete surface, and applying Two coat of DEKGUARD/ EQIVALENT top coat to the concrete surface by brush or roller (coating should be done continuously without any break), rate including cost of all materials, labour, lead, lift, T&P's etc., complete.
Providing two coats of emulsion to the outer wall surfaces after through scrapping the old colour washed surface rate including cost of materials, labour, lead, lift etc., complete.
PCC 1:5:10 mix using 40 mm jelly for foundation including cost of materials, labours, lead, lift etc., complete.
Providing PCC 1:1.5:3 screed concrete using OP/PP Cement with 6mm - 10mm HBG metal (machine crushed) including cost of materials, labours, T&P's, leads, curing etc., complete.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_727868.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid