Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.8 LAccepted-AOC DEORIA PATRATU BHURKUNDA RAMGRAH DIST RAMGRAH JHARKHAND | RAMGRAH | RAMGARH | JHARKHAND | L-1 | Accepted-AOC L - 1 BIDDER | |
| 2 | Rejected-Technical AT GANJHUDIH HAZARI MORE P O SAWANG DIST BOKARO JHARKHAND 829128 | SAWANG | BOKARO | JHARKHAND | 829128 | - | Rejected-Technical L - 2 BIDDER | |
| 3 | Rejected-Technical STATION ROAD PAKIHARI GURUDUH I E L P O GOMIA DIST BOKARO JHARKHAND | GOMIA | BOKARO | JHARKHAND | - | Rejected-Technical L - 3 BIDDER |
Tender Value
₹2.1 L
EMD Value
₹2,700
Closing Date
13 Dec 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Engineer(Civil)
Office of the Project Officer, Sawang Washery.
Maintenance and Alignment works of Railway Track at Swang Washery.
2022_CCL_263955_1
PO/PE(C)/SGW (WS)/E-Tender/22-23/13 dt- 01.12.22
Open Tender
Civil Works - Others
Item Rate
25 days
Sawang Washery.
Refer Tender Document
3 documents required · 3 mandatory
₹2,700
19 Feb 2023
1 Dec 2022
14 Dec 2022
2 Dec 2022
13 Dec 2022
2 Dec 2022
2 Dec 2022 - 7 Dec 2022
Amount
Through packing of any kind of sleeper with stone ballast to maintain correct alignment cross and longitudinal level as required for maintaining track gauge, versine superlevation etc on both straight and curve track laid with contractors tools and labour inclusive of all charges as per IRPWM as directed by I/C 1st through packing of track (M+4) ist density of sleeper.
Through packing of any kind of sleeper with stone ballast to maintain correct alignment cross and longitudinal level as required for maintening track gauge, versine superlevation etc on both straight and curve track laid with contractors tools and labour inclusive of all charges as per IRPWM as directed by 1/C 2nd through pakcing of track (M+4) ist density of sleeper.
Through packing of any kind of sleeper with stone ballast to maintain correct alignment cross and longitudinal level as required for maintening track gauge, versine superlevation etc on both straight and curve track laid with contractors tools and labour inclusive of all charges as per IRPWM as directed by 1/C 3rd through pakcing of track (M+4) ist density of sleeper. (Rites/RPO-KOL/Quotation/P Way matis/2013/01.01.2013
Through packing of any kind of sleeper with stone ballast to maintain correct alignment cross and longitudinal level as required for maintening track gauge, versine superlevation etc on both straight and curve track laid with contractors tools and labour inclusive of all charges as per IRPWM as directed by 1/C 4th through pakcing of track (M+4) ist density of sleeper. (Rites/RPO-KOL/Quotation/P Way matis/2013/01.01.2013
Total impact of GST for the purpose of CTC
M/S S P YADAV
RAJ KUMAR VISHWAKARMA
stage.html
html • 0.04 MB
techsummary_273009.pdf
PDF • 2.46 MB
finsummary_273009.pdf
PDF • 2.46 MB
AOWSWGWS013.pdf
PDF • 3.61 MB
finance_273009.pdf
PDF • 0.47 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .