| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-Finance | ₹2.5 Cr | L1 | Accepted-Finance DUE TO LOW BID PREMIUM |
| 2 | L2₹2.5 CrAccepted-Finance ERODE | ERODE | TAMIL NADU | 638001 | ₹2.5 Cr | L2 | Accepted-Finance DUE TO LOW BID PREMIUM |
| Sl No | Description | Qty | Unit | SRI BALAJI AND CO L1 | MSK Infra Projects L2 |
|---|---|---|---|---|---|
| 1.00 | Picking The Existing B.T Surface Up To 50mm Thick Including Screening Stacking and old metal for such complete is decided by the departmental officers etc Complete as per standard specification | 4,552 | M2 | 27 ₹1.2 L | 25.75 ₹1.2 L |
| 2.00 | Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 1,268 | M3 | 2,785 ₹35.3 L | 2,658.43 ₹33.7 L |
| 3.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications | 12,679 | M2 | 95 ₹12.0 L | 91.96 ₹11.7 L |
| 4.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM/ surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 12,679 | M2 | 22 ₹2.8 L | 21.06 ₹2.7 L |
| 5.00 | Providing and laying 50mm compacted thickness Dense Bituminous Macadam using 0.24 cum of 26.50mm - 13.20mm graded metal and 0.25 cum of 13.20 mm - 2.36mm graded metal and 0.23 cum of 2.36mm and below with 53.20 kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to work site and stacking them on road side to standard departmental metric gauge for premeasurement , heating the bitumen and aggregates to required temperature and mixing them in central hot mix plant ,spreading the mix to the required grades and lines , compaction by 80-100KN power road roller including labour charges for loading,spreading etc including hire charges and fuel charges for mini hot mix plant ,power road roller ,bitumen boiler and all other tools and plants employed etc as per clause 505 of MORTH Rev-5 specification. | 634 | M3 | 10,890 ₹69.0 L | 10,957.14 ₹69.5 L |
| 6.00 | Providing and laying tack coat of 2.0 kgs/10 sqm over the B.T surface treated with binder using 2.0 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 24,249 | M2 | 32 ₹7.8 L | 30.71 ₹7.4 L |
| 7.00 | Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 45.27kgs of VG30 / VG40 bitumen and 5.03Kg for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 1,108 | M3 | 11,215 ₹1.2 Cr | 11,546.3 ₹1.3 Cr |
Updated dates
Tender Value
₹3.0 Cr
EMD Value
₹3.0 L
Closing Date
28 Jan 2026, 3:00 pmClosed
THE COMMISSIONER,ERODE CITY MUNICIPAL CORPORATION
246, MEENAKHI SUNDARANAR SALAI, ERODE-638001
RESTORATION OF B.T SURFACE DAMAGED DUE TO UGSS SCHEMES AND WATER SUPPLY SCHEMES IN RAJAGANAPATHY NAGAR MAIN ROAD
2026_MAWS_643674_1
E1-8726-2025-6-ERODE CITY MUNICIPAL CORPORATION
Open Tender
Civil Works - Roads
120 days
ERODE CITY MUNICIPAL CORPORATION
Please refer Tender documents.
13 documents required · 13 mandatory
₹10,000
₹3.0 L
ERODE CITY MUNICIPAL CORPORATION
3 Feb 2026
14 Jan 2026
28 Jan 2026
14 Jan 2026
28 Jan 2026
14 Jan 2026
14 Jan 2026
Picking The Existing B.T Surface Up To 50mm Thick Including Screening Stacking and old metal for such complete is decided by the departmental officers etc Complete as per standard specification
Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM/ surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying 50mm compacted thickness Dense Bituminous Macadam using 0.24 cum of 26.50mm - 13.20mm graded metal and 0.25 cum of 13.20 mm - 2.36mm graded metal and 0.23 cum of 2.36mm and below with 53.20 kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to work site and stacking them on road side to standard departmental metric gauge for premeasurement , heating the bitumen and aggregates to required temperature and mixing them in central hot mix plant ,spreading the mix to the required grades and lines , compaction by 80-100KN power road roller including labour charges for loading,spreading etc including hire charges and fuel charges for mini hot mix plant ,power road roller ,bitumen boiler and all other tools and plants employed etc as per clause 505 of MORTH Rev-5 specification.
Providing and laying tack coat of 2.0 kgs/10 sqm over the B.T surface treated with binder using 2.0 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 45.27kgs of VG30 / VG40 bitumen and 5.03Kg for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_771250.xls
BOQ • 0.24 MB
CONDITIONS_6.pdf
Tender Documents • 0.76 MB
Download all tender documents and submit your bid