| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹59.4 LAdmitted-Finance | -29.92% | ₹59.4 L | L1 | Admitted-Finance |
| 2 | Not Admitted-Finance | - | - | - | Not Admitted-Finance Not qualified for AOC |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Finance | - | - | - | Not Admitted-Finance Not qualified for AOC |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹91.5 L
EMD Value
₹6.6 L
Closing Date
5 May 2026, 12:00 pmClosed
SE BANDA CIRCLE PWD BANDA
OFFICE OF THE SE BANDA CIRCLE PWD BANDA
CONSTRUCTION WORK OF MAHUTA KA MAJRA PANDEY PURVA LINK ROAD.
2026_CEBAN_1141044_4
1743/35 C-Banda Circle/2025 Dt. 08-04-2026
Open Tender
Civil Works
180 days
BANDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
Yes
₹6.6 L
Yes
OFFICE OF THE SE BANDA CIRCLE PWD BANDA
8 May 2026
24 Apr 2026
5 May 2026
24 Apr 2026
5 May 2026
24 Apr 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 50 meter as per MORD technical specification cause 301.5 MORD sepecification 301.5(i) S.No. 3.4 | - | cum | - | - |
Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lifts and loads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m. as per technical specification clause 303.1 including stablization with 2% slaked lime including mixing with rotavator complete. | - | cum | - | - | |
Providing, Laying and spreading material on a prepared sub grade, adding cement @ 2% by weight of the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to form a layer of sub base. | - | cum | - | - | |
Providing, Laying and spreading material on a prepared sub grade, adding cement @ 4% by weight of the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to form a layer of sub base. | - | cum | - | - | |
Providing and applying tack coat with V.G.-10 bitumen using bitumen pressure dristributor @ 0.35 to 0.45 kg. per sqm. on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | - | sqm | - | - | |
Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat . Claues 508 | - | sqm | - | - | |
Providing and laying seal coat Type-C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using As per Technical Specification Clause 510 | - | sqm | - | - | |
Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lifts and loads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m. as per technical specification clause 303.1 including stablization with 2% slaked lime including mixing with rotavator complete. | - | cum | - | - | |
Construction of C.C. Road
Construction of embankment with approved material obtained from borrow pits with all lift and leads transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.2 | - | cum | - | - | |
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | - | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 12.59 MB
Tendernotice_2.pdf
PDF • 1.27 MB
BOQ_2130738.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid