| 1 | L1₹1.3 CrAccepted-AOC NO 5 144 SOLAIGOUNDANURKADU PARAPATTI SALEM DT 636105 | SALEM | TAMIL NADU | 636105 | ₹1.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 Cr+₹3.4 L (2.64%)Rejected-AOC | ₹1.3 Cr+₹3.4 L (2.64%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.4 Cr+₹8.8 L (6.80%)Rejected-AOC PLOT NO 5 E BLOCK 203 HARMONEY BLUE MOON ARUL MURUGAN NAGAR ZAMIN PALLAVARAM CHENNAI 600 117 | CHENGALPATTU | TAMIL NADU | 600117 | ₹1.4 Cr+₹8.8 L (6.80%) | L3 | Rejected-AOC L3 |
| 4 | L4₹1.4 Cr+₹10.1 L (7.82%)Rejected-AOC EAST CROSS STREET AT 67 M LENGTH IN VEERAGANU VEERAGANUR TOWN PANCHAYAT SALEM DISTRICT | ₹1.4 Cr+₹10.1 L (7.82%) | L4 | Rejected-AOC L4 |
Tender Value
₹1.3 Cr
EMD Value
₹1.4 L
Closing Date
3 Feb 2025, 3:00 pmClosed
Additional Collector (Development)
DRDA, Salem
Salem District - Veerapandy Block - Strengthening the Road from sevampalayam to Reddimaniyakaranoor road via pathai muniyappan koil H/o kalparapatti Panchayat in NABARD -RIDF-XXX -2024-2025 Package No.02
2024_RDTN_514663_21
Roc.No.9140/2023/A4
Open Tender
Civil Works - Roads
Item Wise
180 days
DRDA
As per tender Document
3 documents required · 3 mandatory
₹0
₹1.4 L
DRDA, Salem
21 Mar 2025
31 Dec 2024
3 Feb 2025
31 Dec 2024
3 Feb 2025
31 Dec 2024
2 Jan 2025
Amount
Strengthening the Road from Sevampalayam to Reddimaniyakaranoor via pathal Muniyappan koil 0/0-2/130 H/O kalparapatti
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking 5CM TO10CM Old metalled surface and sectioning for 1Sqm
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher, vibratory / phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface. Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803
Culvert 3.00m Span Culvert Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, etc complete per SS 20 B.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers., compacting etc., complete complying with standard specifications
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete Below sill
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete Above sill
Plain Cement concrete 1:2:4 using 20mm HBG Metal for foundation including watering wherever necessory laid in layers of not more than 15cm thick,compacting etc.,complete with standard specifications and as directed.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Providing and fixing 6mm Bitumen felt for expansion joint between Drit wall and Deck slab.
Provision of 2nos Rumble strips covered with premix bituminious carpet , 15-20mm high centre , 250mm wide placed at 1m c/c at approved location to control speed marked with white strips of road marking paint
Provision for HM stone
Provision for KM stone
Provision for Sign Board
Provision for Name Board charges etc., complete
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
N.RAJENDRAN (BID ID -1241666)
VEL CONSTRUCTIONS (BID ID -1241769)
SRI AMMAN CONSTRUCTIONS (BID ID -1240724)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .