| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical AS per TCR | |
| 3 | Rejected-Technical SALBAGAN ROAD BENACHITY DURGAPUR BARDHAMAN BARDHAMAN 713213 WEST BENGAL INDIA | DURGAPUR | BARDHAMAN | WEST BENGAL | 713213 | - | Rejected-Technical AS per TCR |
Tender Value
₹3.4 L
EMD Value
₹4,300
Closing Date
16 Sept 2022, 10:00 amClosed
Area Engineer (EandM)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Burdwan, West Bengal-713346
Lifting, erection and changing of damaged shell plate of Vertical Boiler No. WBL 10511 at No. 1 Pit of Madhaipur Colliery.
2022_ECL_255020_1
GM-PND/EandM/22-23/50/1917 dated 29/08/2022
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Madhaipur Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,300
29 Sept 2022
5 Sept 2022
17 Sept 2022
6 Sept 2022
16 Sept 2022
6 Sept 2022
6 Sept 2022 - 13 Sept 2022
Amount
Lifting, erection and changing of damaged shell plate of Vertical Boiler No. WBL 10511 at No. 1 Pit of Madhaipur Colliery. (Inclusive of CMPF/EPF)
Boiler erection lifting and same position setting
Old damaged shell extension plate angle gas cutting and out dressing grinding consumable and Labour charges.
Shell extension plate materials few plate angle + 10% allowance = 317 kg (size 6' dia & 1 ft. hieght ) thick 12 mm ( 317 kg x @ Rs. 100.00 per kg)
New shell extension plate & angle rolling, Bending, fabrication & same position fitting welding grinding, dressing smoothly consumable & Labour charges.
Damaged sheel furnash plate furnesh plate & Rivat Plate cutting out & Dressing Gracing proper-V-with consumable & Labour charges.
New BQ Plate size 600 MM x 1000 MM x 16 MM Thick & 10% allowance both side new plate total 175 x @ 225/- per Kg.
New BQ furnace shall plate, rolling, opposite side Joggling Bending charfges 175 KG x @ Rs. 150/- per kg.
Rolling and urnace shell plate proper fabricatged-V & same position fitting charges 175 Kg x @ Rs. 75.00 per kg.
Rivet work 50 nos. Gas cutting Heated Hammering & out by manual with consumable & Labour charges 50 nos. x @ Rs. 100.00 each
Rivet hole BQ welding built up and hole removing with consumable & labour charges 50 nos. x @ Rs. 100 each
New BQ Rivet same size same position riveting, cocking with materials & consumable & Labour charges 50 nos. x Rs. 400.00 each
BQ welding both side furnace plate - 4.4 Mtr x Rs. 4000 ER MTR
Approval of Director of Boiler Kolkata Regulation 392 of IBR 1950
Materials testing Taratola, Kolkata
Stage inspection arrangement by Boiler Inspector Director
Hydraulic test arrangement by Boiler Inspector Director
Contractor Profit
Total impact of GST for the purpose of CTC
UNITED ENGINEERING ENTERPRISE
GHOSH ENGINEERING
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .