| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.0 CrAdmitted-Finance 142 | L1 | Admitted-Finance | |
| 2 | L2₹28.3 Cr+₹25.4 L (0.90%)Admitted-Finance CHHAPRAULI | BAHRAICH | UTTAR PRADESH | 271801 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SHIV SHAKTI CONSTRUCTION L1 | M/S AJAY KUMAR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in filling and removing for Ring Bundh of canal with carriage earth up to 1 Km. distance by power transport including all cost of material, Labour and T&P etc. for proper completion of work as directed by Engineer In- charge. | 26,416 | Cum. | 150 ₹39,62,400 Lowest | 174 ₹45,96,384 |
| 2.00 | Supply of H.D.P.E. Geo bags made of 240 GSM woven fabric confirming to 15351 (2015) of size 1.09x0.69 mtr. Filling of Geo bags with R.B.M. laying and machine sewing with geo material. | 18,000 | No. | 150 ₹27,00,000 Lowest | 239 ₹43,02,000 |
| 3.00 | Supplying , fixing and Extraction of Sheet pile driving into the ground (Above 5 mt ) required depth including all cost of material cutting, welding , painting with bitumen, labour and T&P etc. (per M.T.) for proper completion of work. | 156 | M.T | 62,000 ₹96,72,000 | 60,667 ₹94,64,052 Lowest |
| 4.00 | Earth work in excavation mixed with dry wet or under water including Ramming and dressing the surface to the required levels slope and also including all lead & lifts. | 25,834 | Cum. | 100 ₹25,83,400 Lowest | 107 ₹27,64,238 |
| 5.00 | Laying Cement Concrete P.C.C. M-20 (1:1.5:3) in foundation with stone ballast & Coarse sand including dewatering with all arrangement, T&P, POL,Electric Charge Etc Including all cost of material,labour and T.& P. etc. complete. | 10,396 | Cum. | 8,200 ₹8,52,47,200 | 7,995 ₹8,31,16,020 Lowest |
| 6.00 | Providing and laying cement concrete M 20 (1:1.5:3 ) with cement,Coarse and and 13.2 to 1.2 mm tone grit including cost of all material, Labour and T&P etc. complete. | 3,292 | Cum. | 7,000 ₹2,30,44,000 | 6,952 ₹2,28,85,984 Lowest |
| 7.00 | Laying Reinforced Cement Concrete in RCC M-25 (1:1:2) (Cement,Coarse sand & Shingle 10-20 mm size) including dewatering with all arrangement T&P, POL, Electric Charge Etc all cost of material,labour and T.& P. etc. complete. | 3,634 | Cum. | 10,000 ₹3,63,40,000 | 9,921 ₹3,60,52,914 Lowest |
| 8.00 | Providing and laying R.C.C M25 (1:1:2) with cement , coarse sand , and 10-20mm stone grit including cost of all material, labour and T&P etc.complete. | 1,037 | cum | 8,800 ₹91,25,600 | 8,627 ₹89,46,199 Lowest |
| 9.00 | Providing and laying R.C.C M30 (Design mix) with cement , coarse sand , and 10-20mm stone grit including cost of all material, labour and T&P etc.complete. | 464 | cum | 7,900 ₹36,65,600 | 7,736 ₹35,89,504 Lowest |
| 10.00 | Centering & shuttering for R.C.C. work including cost of centering & shuttering upto 3.0 m height for proper complection of job as directed by Engineer-in-charge. | 9,459 | Sqm. | 790 ₹74,72,610 | 777 ₹73,49,643 Lowest |
Tender Value
₹29.3 Cr
EMD Value
₹58.6 L
Closing Date
5 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE DRAINAGE CIRCLE ALIGARH
OFFICE OF S.E. DRAINAGE CIRCLE ALIGARH
Construction of Head Regulator at Km. 238.680, Cross Regulator at Km. 239.200 and Inter Connecting Regulator at Km 238.300 and Other works on UGC for Supply of water to Jal Nigam Mathura
2026_UPIDC_1189677_2
13/SE/DCA/2026-27
Open Tender
Civil Works - Canal
Item Wise
425 days
BULANDSHAHAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,944
₹58.6 L
16 Nov 2026
26 Oct 2026
5 Nov 2026
26 Oct 2026
5 Nov 2026
26 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in filling and removing for Ring Bundh of canal with carriage earth up to 1 Km. distance by power transport including all cost of material, Labour and T&P etc. for proper completion of work as directed by Engineer In- charge. | 26,416 | Cum. | - | - |
| 2 | Supply of H.D.P.E. Geo bags made of 240 GSM woven fabric confirming to 15351 (2015) of size 1.09x0.69 mtr. Filling of Geo bags with R.B.M. laying and machine sewing with geo material. | 18,000 | No. | - | - |
| 3 | Supplying , fixing and Extraction of Sheet pile driving into the ground (Above 5 mt ) required depth including all cost of material cutting, welding , painting with bitumen, labour and T&P etc. (per M.T.) for proper completion of work. | 156 | M.T | - | - |
| 4 | Earth work in excavation mixed with dry wet or under water including Ramming and dressing the surface to the required levels slope and also including all lead & lifts. | 25,834 | Cum. | - | - |
| 5 | Laying Cement Concrete P.C.C. M-20 (1:1.5:3) in foundation with stone ballast & Coarse sand including dewatering with all arrangement, T&P, POL,Electric Charge Etc Including all cost of material,labour and T.& P. etc. complete. | 10,396 | Cum. | - | - |
| 6 | Providing and laying cement concrete M 20 (1:1.5:3 ) with cement,Coarse and and 13.2 to 1.2 mm tone grit including cost of all material, Labour and T&P etc. complete. | 3,292 | Cum. | - | - |
| 7 | Laying Reinforced Cement Concrete in RCC M-25 (1:1:2) (Cement,Coarse sand & Shingle 10-20 mm size) including dewatering with all arrangement T&P, POL, Electric Charge Etc all cost of material,labour and T.& P. etc. complete. | 3,634 | Cum. | - | - |
| 8 | Providing and laying R.C.C M25 (1:1:2) with cement , coarse sand , and 10-20mm stone grit including cost of all material, labour and T&P etc.complete. | 1,037 | cum | - | - |
| 9 | Providing and laying R.C.C M30 (Design mix) with cement , coarse sand , and 10-20mm stone grit including cost of all material, labour and T&P etc.complete. | 464 | cum | - | - |
| 10 | Centering & shuttering for R.C.C. work including cost of centering & shuttering upto 3.0 m height for proper complection of job as directed by Engineer-in-charge. | 9,459 | Sqm. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
Tendernotice_2.pdf
PDF • 2.08 MB
BOQ_2272207.xls
BOQ • 0.33 MB
DateCorrigundam.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .