| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance GF 3 F 12 KSSIDC BUILDING 5TH CROSS 1ST STAGE PEENYA INDUSTRIAL ESTATE BANGALORE | BENGALURU URBAN | KARNATAKA | 560058 | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹22.9 L (18.1%)Admitted-Finance PLOT NO 21 20 D I BLOCK MIDC CHINCHWAD PUNE 411019 PUNE CITY | PUNE | MAHARASHTRA | 411019 | ₹1.5 Cr+₹22.9 L (18.1%) | L2 | Admitted-Finance |
| 3 | L3₹1.9 Cr+₹65.3 L (51.6%)Admitted-Finance 001 CASABLANCA SANGAM PRESS ROAD KOTHRUD PUNE 411038 | PUNE | PUNE | MAHARASHTRA | 411038 | ₹1.9 Cr+₹65.3 L (51.6%) | L3 | Admitted-Finance |
| 4 | L4₹2.2 Cr+₹97.7 L (77.3%)Admitted-Finance 953 16TH CROSS 1ST PHASE 1ST STAGE CHANDRA LAYOUT BANGALORE KARNATAKA 560072 | BENGALURU URBAN | KARNATAKA | 560072 | ₹2.2 Cr+₹97.7 L (77.3%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Power One Micro Systems (P) Ltd L1 | INFONPOWER SYSTEMS PVT LTD L4 | PRASA INFOCOM AND POWER SOLUTIONS P LTD L3 | Ador Powertron Limited L2 |
|---|---|---|---|---|---|---|---|
| 1.00Please note that Quoted rates are exclusive opf GST. GST will be paid separtely as per rules and regulation of GOI. | |||||||
| 2.00 | Supply, installation, testing and commissoning of UPS & Battery rack for 100 KVA Modular UPS rating UPS with minimum 15 Minutes battery backup , with static & manual bypass Input Voltage: 3 Ph 415 Volts, ±10% Output : 3 -Phase-415Volts 4w 50 Hz ±1% , .( UPS Make :- As per approved make list attached). Scope of work includes Supply, installation, testing , commissioning, shifting, transport, labour and final testing of UPS with its all accessories including External isolation transformer, power links, cables, switchgears with enclosuer etc as complete to make it functional. Installation should be done by Engineer of authorised service dealer or manufacture of said UPS. Related information should be submiited to IISER Pune in advance for approval. Any charges payable to the UPS agency will be borne by the contractor. Detailed specifications of UPS is attached with tender document. Please refer Volume II . Page no. 136 to 153 for Scope of work and technical specifications. ( Approved make : a) Novature / Eaton / Vertive / Ador / Socomec ) Warranty two year for UPS and three years for Battery. | 5 | NOS | 16,93,747 ₹84,68,735 Lowest | 28,80,000 ₹1,44,00,000 | 23,40,896 ₹1,17,04,480 | 19,17,700 ₹95,88,500 |
| 3.00 | Supply, installation, testing and commissoning of UPS & Battery rack for 60 KVA Conventional Type rating UPS with minimum 15 Minutes battery backup , with static & manual bypass Input Voltage: 3 Ph 415 Volts, ±10% Output : 3 -Phase-415Volts 4w 50 Hz ±1% , .( UPS Make :- As per approved make list attached). Scope of work includes Supply, installation, testing , commissioning, shifting, transport, labour and final testing of UPS with its all accessories without isolation transformer, power links, cables, switchgears with enclosuer etc as complete to make it functional. Installation should be done by Engineer of authorised service dealer or manufacture of said UPS. Related information should be submiited to IISER Pune in advance for approval. Any charges payable to the UPS agency will be borne by the contractor. Detailed specifications of UPS is attached with tender document. Please refer Volume II . Page no. 136 to 153 for Scope of work and technical specifications.. ( Approved make : a) Novature / Eaton / Vertive / Ador / Socomec ) Warranty two year for UPS and three years for Battery. | 1 | NOS | 7,02,849 ₹7,02,849 Lowest | 12,60,000 ₹12,60,000 | 8,91,578 ₹8,91,578 | 8,57,710 ₹8,57,710 |
| 4.00 | Supply, installation, testing and commissoning of UPS & Battery rack for 20 KVA Conventional Type rating UPS with minimum 15 Minutes battery backup , with static & manual bypass Input Voltage: 3 Ph 415 Volts, ±10% Output : 1 -Phase-230Volts 3w 50 Hz ±1% , .( UPS Make :- As per approved make list attached). Scope of work includes Supply, installation, testing , commissioning, shifting, transport, labour and final testing of UPS with its all accessories without isolation transformer, power links, cables, switchgears with enclosuer etc as complete to make it functional. Installation should be done by Engineer of authorised service dealer or manufacture of said UPS. Related information should be submiited to IISER Pune in advance for approval. Any charges payable to the UPS agency will be borne by the contractor. Detailed specifications of UPS is attached with tender document. Please refer Volume II . Page no. 136 to 153 for Scope of work and technical specifications. ( Approved make : a) Novature / Eaton / Vertive / Ador / Socomec ) Warranty two year for UPS and three years for Battery. | 2 | NOS | 3,26,340 ₹6,52,680 Lowest | 5,40,000 ₹10,80,000 | 3,36,525.5 ₹6,73,051 | 3,63,700 ₹7,27,400 |
| 5.00 | Supply, installation, testing and commissoning of UPS & Battery rack for 10 KVA Conventional Type rating UPS with minimum 15 Minutes battery backup , with static & manual bypass Input Voltage: 3 Ph 415 Volts, ±10% Output : 1 -Phase-230Volts 3w 50 Hz ±1% , .( UPS Make :- As per approved make list attached). Scope of work includes Supply, installation, testing , commissioning, shifting, transport, labour and final testing of UPS with its all accessories without isolation transformer, power links, cables, switchgears with enclosuer etc as complete to make it functional. Installation should be done by Engineer of authorised service dealer or manufacture of said UPS. Related information should be submiited to IISER Pune in advance for approval. Any charges payable to the UPS agency will be borne by the contractor. Detailed specifications of UPS is attached with tender document. Please refer Volume II . Page no. 136 to 153 for Scope of work and technical specifications. ( Approved make : a) Novature / Eaton / Vertive / Ador / Socomec ) Warranty two year for UPS and three years for Battery. | 2 | NOS | 2,47,511 ₹4,95,022 | 4,50,000 ₹9,00,000 | 2,59,348.5 ₹5,18,697 | 2,36,700 ₹4,73,400 Lowest |
| 6.00Comprehensive Annual Maintenance Contract for following UPS , For First Year on completion of warranty period(02 years) , mentioned in item , Excluding battery backup. Terms and conditions of CAMC will be as per attached sheet with Tender document volume II, Pg no 148-153. Bidder please quote basic rate per month for AMC of item no (7 to 16) | |||||||
| 7.00 | 100 KVA UPS ( Medeleeve) | 12 | Months | 4,840 ₹58,080 Lowest | 6,000 ₹72,000 | 9,548.21 ₹1,14,578.52 | 7,300 ₹87,600 |
| 8.00 | 100 KVA UPS (G1) | 12 | Months | 4,840 ₹58,080 Lowest | 6,000 ₹72,000 | 9,548.21 ₹1,14,578.52 | 7,300 ₹87,600 |
| 9.00 | 100 KVA UPS ( LHC) | 12 | Months | 4,840 ₹58,080 Lowest | 6,000 ₹72,000 | 9,548.21 ₹1,14,578.52 | 7,300 ₹87,600 |
| 10.00 | 100 KVA UPS ( Main building first floor c block) | 12 | Months | 4,840 ₹58,080 Lowest | 6,000 ₹72,000 | 9,548.21 ₹1,14,578.52 | 7,300 ₹87,600 |
Tender Value
₹2.5 Cr
EMD Value
₹5.1 L
Closing Date
7 Oct 2024, 3:10 pmClosed
Director IISER Pune
IISER Pune Dr Homi Bhabha ropad pashan Pune 411008
SUPPLY INSTALLTION TESTING AND COMMISSIONING OF UPS FOR VARIOUS LOCATIONS AT IISER PUNE
2024_IISRP_825122_2
16/IISERPune/2024-25
Open Tender
Electrical Works
Works
180 days
IISER Pune
As per NIT
3 documents required · 3 mandatory
₹1,180
Director IISER Pune
₹5.1 L
28 Nov 2024
27 Sept 2024
8 Oct 2024
27 Sept 2024
7 Oct 2024
27 Sept 2024
Amount
Please note that Quoted rates are exclusive opf GST. GST will be paid separtely as per rules and regulation of GOI.
Supply, installation, testing and commissoning of UPS & Battery rack for 100 KVA Modular UPS rating UPS with minimum 15 Minutes battery backup , with static & manual bypass Input Voltage: 3 Ph 415 Volts, ±10% Output : 3 -Phase-415Volts 4w 50 Hz ±1% , .( UPS Make :- As per approved make list attached). Scope of work includes Supply, installation, testing , commissioning, shifting, transport, labour and final testing of UPS with its all accessories including External isolation transformer, power links, cables, switchgears with enclosuer etc as complete to make it functional. Installation should be done by Engineer of authorised service dealer or manufacture of said UPS. Related information should be submiited to IISER Pune in advance for approval. Any charges payable to the UPS agency will be borne by the contractor. Detailed specifications of UPS is attached with tender document. Please refer Volume II . Page no. 136 to 153 for Scope of work and technical specifications. ( Approved make : a) Novature / Eaton / Vertive / Ador / Socomec ) Warranty two year for UPS and three years for Battery.
Supply, installation, testing and commissoning of UPS & Battery rack for 60 KVA Conventional Type rating UPS with minimum 15 Minutes battery backup , with static & manual bypass Input Voltage: 3 Ph 415 Volts, ±10% Output : 3 -Phase-415Volts 4w 50 Hz ±1% , .( UPS Make :- As per approved make list attached). Scope of work includes Supply, installation, testing , commissioning, shifting, transport, labour and final testing of UPS with its all accessories without isolation transformer, power links, cables, switchgears with enclosuer etc as complete to make it functional. Installation should be done by Engineer of authorised service dealer or manufacture of said UPS. Related information should be submiited to IISER Pune in advance for approval. Any charges payable to the UPS agency will be borne by the contractor. Detailed specifications of UPS is attached with tender document. Please refer Volume II . Page no. 136 to 153 for Scope of work and technical specifications.. ( Approved make : a) Novature / Eaton / Vertive / Ador / Socomec ) Warranty two year for UPS and three years for Battery.
Supply, installation, testing and commissoning of UPS & Battery rack for 20 KVA Conventional Type rating UPS with minimum 15 Minutes battery backup , with static & manual bypass Input Voltage: 3 Ph 415 Volts, ±10% Output : 1 -Phase-230Volts 3w 50 Hz ±1% , .( UPS Make :- As per approved make list attached). Scope of work includes Supply, installation, testing , commissioning, shifting, transport, labour and final testing of UPS with its all accessories without isolation transformer, power links, cables, switchgears with enclosuer etc as complete to make it functional. Installation should be done by Engineer of authorised service dealer or manufacture of said UPS. Related information should be submiited to IISER Pune in advance for approval. Any charges payable to the UPS agency will be borne by the contractor. Detailed specifications of UPS is attached with tender document. Please refer Volume II . Page no. 136 to 153 for Scope of work and technical specifications. ( Approved make : a) Novature / Eaton / Vertive / Ador / Socomec ) Warranty two year for UPS and three years for Battery.
Supply, installation, testing and commissoning of UPS & Battery rack for 10 KVA Conventional Type rating UPS with minimum 15 Minutes battery backup , with static & manual bypass Input Voltage: 3 Ph 415 Volts, ±10% Output : 1 -Phase-230Volts 3w 50 Hz ±1% , .( UPS Make :- As per approved make list attached). Scope of work includes Supply, installation, testing , commissioning, shifting, transport, labour and final testing of UPS with its all accessories without isolation transformer, power links, cables, switchgears with enclosuer etc as complete to make it functional. Installation should be done by Engineer of authorised service dealer or manufacture of said UPS. Related information should be submiited to IISER Pune in advance for approval. Any charges payable to the UPS agency will be borne by the contractor. Detailed specifications of UPS is attached with tender document. Please refer Volume II . Page no. 136 to 153 for Scope of work and technical specifications. ( Approved make : a) Novature / Eaton / Vertive / Ador / Socomec ) Warranty two year for UPS and three years for Battery.
Comprehensive Annual Maintenance Contract for following UPS , For First Year on completion of warranty period(02 years) , mentioned in item , Excluding battery backup. Terms and conditions of CAMC will be as per attached sheet with Tender document volume II, Pg no 148-153. Bidder please quote basic rate per month for AMC of item no (7 to 16)
100 KVA UPS ( Medeleeve)
100 KVA UPS (G1)
100 KVA UPS ( LHC)
100 KVA UPS ( Main building first floor c block)
100 KVA UPS ( Main building first floor c block)
60 KVA UPS ( Guest house service block)
20 KVA UPS ( Guest house Secound floor)
20 KVA UPS ( Dinning Hall)
10 KVA UPS (Pashan gate)
10 KVA UPS (Medeleeve 107))
Comprehensive Annual Maintenance Contract for following UPS , For Secound Year on completion of warranty period(02 years) , mentioned in item , Excluding battery backup. Terms and conditions of CAMC will be as per attached sheet with Tender document volume II, Pg no 148-153 Bidder please quote basic rate per month for AMC of item no (18 to 27)
100 KVA UPS ( Medeleeve)
100 KVA UPS (G1)
100 KVA UPS ( LHC)
100 KVA UPS ( Main building first floor c block)
100 KVA UPS ( Main building first floor c block)
60 KVA UPS ( Guest house service block)
20 KVA UPS ( Guest house Secound floor)
20 KVA UPS ( Dinning Hall)
10 KVA UPS (Pashan gate)
10 KVA UPS (Medeleeve 107))
Comprehensive Annual Maintenance Contract for following UPS , For third Year on completion of warranty period (02 years) , mentioned in item , Excluding battery backup. Terms and conditions of CAMC will be as per attached sheet with Tender document volume II, Pg no 148-153. Bidder please quote basic rate per month for AMC of item no (29 to 38)
100 KVA UPS ( Medeleeve)
100 KVA UPS (G1)
100 KVA UPS ( LHC)
100 KVA UPS ( Main building first floor c block)
100 KVA UPS ( Main building first floor c block)
60 KVA UPS ( Guest house service block)
20 KVA UPS ( Guest house Secound floor)
20 KVA UPS ( Dinning Hall)
10 KVA UPS (Pashan gate)
10 KVA UPS (Medeleeve 107))
Comprehensive Annual Maintenance Contract for following UPS , For fourth Year on completion of warranty period , (02 years) mentioned in item , Excluding battery backup. Terms and conditions of CAMC will be as per attached sheet with Tender document volume II, Pg no 148-153. Bidder please quote basic rate per month for AMC of item no (40 to 49)
100 KVA UPS ( Medeleeve)
100 KVA UPS (G1)
100 KVA UPS ( LHC)
100 KVA UPS ( Main building first floor c block)
100 KVA UPS ( Main building first floor c block)
60 KVA UPS ( Guest house service block)
20 KVA UPS ( Guest house Secound floor)
20 KVA UPS ( Dinning Hall)
10 KVA UPS (Pashan gate)
10 KVA UPS (Medeleeve 107))
Comprehensive Annual Maintenance Contract for following UPS , For Fifth Year on completion of warranty period (02 years) , mentioned in item , Excluding battery backup. Terms and conditions of CAMC will be as per attached sheet with Tender document volume II, Pg no 148-153. Bidder please quote basic rate per month for AMC of item no (51 to 60)
100 KVA UPS ( Medeleeve)
100 KVA UPS (G1)
100 KVA UPS ( LHC)
100 KVA UPS ( Main building first floor c block)
100 KVA UPS ( Main building first floor c block)
60 KVA UPS ( Guest house service block)
20 KVA UPS ( Guest house Secound floor)
20 KVA UPS ( Dinning Hall)
10 KVA UPS (Pashan gate)
10 KVA UPS (Medeleeve 107))
Comprehensive Annual Maintenance Contract for following UPS , For Sixth Year on completion of warranty period (02 years) , mentioned in item , Excluding battery backup. Terms and conditions of CAMC will be as per attached sheet with Tender document Pg no volume II, Pg no 148-153. Bidder please quote basic rate per month for AMC of item no (62 to 71)
100 KVA UPS ( Medeleeve)
100 KVA UPS (G1)
100 KVA UPS ( LHC)
100 KVA UPS ( Main building first floor c block)
100 KVA UPS ( Main building first floor c block)
60 KVA UPS ( Guest house service block)
20 KVA UPS ( Guest house Secound floor)
20 KVA UPS ( Dinning Hall)
10 KVA UPS (Pashan gate)
10 KVA UPS (Medeleeve 107))
Ador Powertron Limited (BID ID -3098800)
PRASA INFOCOM AND POWER SOLUTIONS P LTD (BID ID -3100076)
INFONPOWER SYSTEMS PVT LTD (BID ID -3095525)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.43 MB
tenderdocuments.pdf
Tender Documents • 7.59 MB
BOQ_870288.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .