Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 CrAccepted-AOC | ₹1.4 Cr | 1 | Accepted-AOC L1 Accepted |
| 2 | 2₹1.4 Cr+₹6.5 L (4.66%)Rejected-Finance | ₹1.4 Cr+₹6.5 L (4.66%) | 2 | Rejected-Finance L2 Rejected |
| Sl No | Description | Qty | Unit | M JAYARAJ L2 | SRI PERIYASAMY CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.10Strengthening and Five Year Maintanance to the Sathakudi to Pattamudaiyan road Km 0/0-2/400 in Keelkudivattathur Panchayat | |||||
| 1.20 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 864 | Cum | 137.85 ₹1,19,102.4 | 131.15 ₹1,13,313.6 Lowest |
| 1.30 | PICKING old metalled/BT Surface upto. 10cm thick as directed by the deparmtnetal officers | 2,406.67 | Sqm | 22.93 ₹55,184.94 | 21.7 ₹52,224.74 Lowest |
| 1.40 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 1,083 | Cum | 2,596.94 ₹28,12,486.02 | 2,473.28 ₹26,78,562.24 Lowest |
| 1.50 | Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 7,220 | Sqm | 84.67 ₹6,11,317.4 | 80.64 ₹5,82,220.8 Lowest |
| 1.60 | Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 7,220 | Sqm | 19.65 ₹1,41,873 | 18.71 ₹1,35,086.2 Lowest |
| 1.70 | BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 180.5 | Sqm | 11,898.35 ₹21,47,652.18 | 11,331.76 ₹20,45,382.68 Lowest |
| 1.80Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms | |||||
| 1.90 | KM 0/0-1/0 | 45 | Cum | 885.35 ₹39,840.75 | 843.19 ₹37,943.55 Lowest |
| 2.00 | KM 1/0-2/0 | 45 | Cum | 895.25 ₹40,286.25 | 852.62 ₹38,367.9 Lowest |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
21 Jan 2025, 3:00 pmClosed
ADDITIONAL COLLECTOR (DEVELOPMENT)
DRDA PUDUKKOTTAI
Package No. 27 - Avudayarkoil Panchayat Union - Strengthening and Five Year Maintanance to the Sathakudi to Pattamudaiyan road Km 0/0-2/400 in Keelkudivattathur Panchayat Under NABARD RIDF XXX-2024-25
2024_RDTN_515210_1
PDKT/DRDA/NABARD/27
Open Tender
Civil Works - Roads
Item Rate
180 days
AVUDAIYARKOIL
Please refer tender document
4 documents required · 4 mandatory
₹0
₹1.4 L
DRDA PUDUKKOTTAI
7 Aug 2025
30 Dec 2024
21 Jan 2025
30 Dec 2024
21 Jan 2025
30 Dec 2024
7 Jan 2025
Amount
Strengthening and Five Year Maintanance to the Sathakudi to Pattamudaiyan road Km 0/0-2/400 in Keelkudivattathur Panchayat
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
PICKING old metalled/BT Surface upto. 10cm thick as directed by the deparmtnetal officers
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Provision for Hecta metre stone
Provision for Kilo metre stone
Provision for 60 cm Equilateral triangle cautionary
Providing and fixing Name board Cum Citizen Board
Contruction of single row pipe culvert @ Ch-5
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
Filling with M-Sand and filling including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc.. Completed
Provision for 0.900M pipe NP3
Collection and supply of gravel form appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc. completed
Contruction of single row pipe culvert @ Ch-110
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
Filling with M-Sand and filling including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc.. Completed
Provision for 0.900M pipe NP3
Collection and supply of gravel form appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc. completed
Contruction of single row pipe culvert @ Ch-150
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
Filling with M-Sand and filling including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc.. Completed
Provision for 0.900M pipe NP3
Collection and supply of gravel form appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc. completed
Contruction of single row pipe culvert @ Ch-240
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
Filling with M-Sand and filling including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc.. Completed
Provision for 0.900M pipe NP3
Collection and supply of gravel form appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc. completed
Contruction of single row pipe culvert @ Ch-540
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
Filling with M-Sand and filling including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc.. Completed
Provision for 0.900M pipe NP3
Collection and supply of gravel form appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc. completed
Contruction of single row pipe culvert @ Ch-1000
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
Filling with M-Sand and filling including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc.. Completed
Provision for 0.900M pipe NP3
Collection and supply of gravel form appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc. completed
Retaining wall 567m - 667m and 680m-770m
Earth work excavation for foundation in all soils such as redearth ,hard stiff clay soil, stiff black cotton soil,hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges etc complete
PCC 1:4:8 mix using 40mm ISS metal including all labour charges for mixing, laying and curing etc complete
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
Cement concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
Retaining wall 1900m -1930m
Earth work excavation for foundation in all soils such as redearth ,hard stiff clay soil, stiff black cotton soil,hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges etc complete
PCC 1:4:8 mix using 40mm ISS metal including all labour charges for mixing, laying and curing etc complete
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
Cement concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M JAYARAJ (BID ID -1229481)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .