Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-AOC | ₹11.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.5 L+₹1,606.43 (0.14%)Rejected-Finance 39 F NEW REVENUE COLONY ACHALPUR KADIPUR SADAR PRATAPGARH | PRATAPGARH | PRATAPGARH | UTTAR PRADESH | ₹11.5 L+₹1,606.43 (0.14%) | L2 | Rejected-Finance L2 |
Tender Value
₹11.5 L
EMD Value
₹22,960
Closing Date
23 Jul 2026, 12:00 pmClosed
EERED RBL
SONIA NAGAR RAEBARELI
LOT NO 02 VIKAS KHAND DEENSHSHGAURA MAI PIPAL KE PAID SE MAHRANI MANDIR TAK PURE PRAHLAD CHANDAI CHAUHAAR MAI INTERLOCKING KA NIRMAAN
2026_REDUP_1166262_3
988/EE/RED/RBLDT 02.07.2026
Open Tender
Civil Works
Percentage
90 days
UNCHAHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹225
₹22,960
Yes
2 Sept 2026
8 Jul 2026
23 Jul 2026
8 Jul 2026
23 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
| - | Earth work cutting & filling in ordinary soil in embankment ,watering of excavated earth into the trenches or space between the sides of foundation & building. S.I.no MoRTH 301 (3.1) | 45.9 | Cum | 180.5 | ₹8,284.95 |
| - | Earth work in surface excavation not exceding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plainincluding getting out and disposal of excavated earth upto 50 m and lift upto 1.50 m, as directed by Engineer in charge.(S.I.no.2.8.1) | 20.25 | Cum | 187.15 | ₹3,789.79 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All works upto plinth level.1:6:12.(S.I. no.273) | 10.8 | Cum | 4,221.8 | ₹45,595.44 |
| 5 | Brick work with common burnt clay (non modular)bricks of Class M-150 in 1:4 cement &coarse sand mortar In foundation & plinth (S.I. no.6.1.1) | 31.67 | Cum | 5,889.05 | ₹1,86,506.21 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All works upto plinth level. with 1:2:4 cement, coarse sand, 20mm gauge stone grit, S.I.No. 4.1.3 | 2.93 | Cum | 6,447.65 | ₹18,891.61 |
| 7 | Construction of granular sub base by providing well graded materials, inclucing supply of all materials, labour and T&P etc. reqrired for proper completion of the work. | 59.27 | Cum | 2,536.5 | ₹1,50,338.36 |
| - | S/L of 80 mm thick c.c. interlocking (Zig-Zag rubber moulded) with Block over 22.4 to 53mm G.S.B. incluiding undulation etc complete all respects. MORD 1500 (6.7) | 790.25 | Sqm | 899.27 | ₹7,10,648.12 |
| 9 | Suppy of 350mm dia NP-3 Hume pipe including local shifting and laying &fixing complete | 10 | rm | 1,845.57 | ₹18,455.7 |
| 10 | S/ F of Sign Board/Inauguration Stone & Photo graphy | 1 | Job | 4,940 | ₹4,940 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_2187666.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .