| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹16.6 L−₹3,371.22 (0.20%)Accepted-AOC | ₹16.6 L−₹3,371.22 (0.20%) | 2 | Accepted-AOC accept |
| 2 | 1₹16.6 LRejected-Finance | ₹16.6 L | 1 | Rejected-Finance reject |
| Sl No | Description | Qty | Unit | PONMALAR L2 | P MADASAMY L1 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 1,816 | Sqm | 29 ₹52,664 | 27.33 ₹49,631.28 Lowest |
| 2.00 | Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of VG30 bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumapic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30T CMP with bitumen Boiler,tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumapic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as clause 505 MORTH Rev-5. | 91 | Cum | 10,750 ₹9,78,250 | 10,748.1 ₹9,78,077.1 Lowest |
| 3.00 | Providing and laying Bituminous concrete to 40mm thick using 0.13 cum of 19.00-9.50 mm, 0.13cum of 9.50-2.36 mm and 0.26cum of 2.36mm and below with 46.28 kgs of VG 30 /VG 40 bitumen 4.02 kg plastic waste for 10m2 including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20–30 tonnes capacity, conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 30 mm with mechanical Paver to the specified grades and cross sections and consolidated by 80 - 10 tonne vibratory/ pneumatic roller to the required density etc., including labor for attending to paver site etc., including hire charges and fuel charges for 20 – 30t CMP with bitumen boiler, tipper trucks, paver finisher,/ 9m paver finisher, vibratory/ pneumatic rollers and all other tools and plant required including fule and all other incidental charges etc., complete as per specification using CMP as for clause 507of MORTH Rev-5Rev-5. | 55 | Cum | 11,365 ₹6,25,075 | 11,362.6 ₹6,24,943 Lowest |
| 4.00 | Collection,supply and filling of Well Gravel in layers of not more than 15cm thick including all cost and conveyance of Gravel from the approved quarry to the work site and stacking them to departmental gauge for pre measurement including labourcharges for spreading and all other incidental charges etc, complete complying as per clause 401 MORTH specification. | 28 | Cum | 255 ₹7,140 | 253.8 ₹7,106.4 Lowest |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
28 May 2025, 3:00 pmClosed
Executive Officer
55, Nadukadai Road, Udangudi
Strengthening of BT road at Kothuvapalli Street in Udangudi Town Panchayat.
2025_DTP_557457_1
220/2025
Open Tender
Civil Works - Roads
Works
180 days
Strengthening of BT road at Kothuvapalli Street i
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,000
Udangudi Town Panchayat
5 Sept 2025
13 May 2025
29 May 2025
13 May 2025
28 May 2025
21 May 2025
20 May 2025
Amount
Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of VG30 bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumapic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30T CMP with bitumen Boiler,tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumapic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as clause 505 MORTH Rev-5.
Providing and laying Bituminous concrete to 40mm thick using 0.13 cum of 19.00-9.50 mm, 0.13cum of 9.50-2.36 mm and 0.26cum of 2.36mm and below with 46.28 kgs of VG 30 /VG 40 bitumen 4.02 kg plastic waste for 10m2 including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20–30 tonnes capacity, conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 30 mm with mechanical Paver to the specified grades and cross sections and consolidated by 80 - 10 tonne vibratory/ pneumatic roller to the required density etc., including labor for attending to paver site etc., including hire charges and fuel charges for 20 – 30t CMP with bitumen boiler, tipper trucks, paver finisher,/ 9m paver finisher, vibratory/ pneumatic rollers and all other tools and plant required including fule and all other incidental charges etc., complete as per specification using CMP as for clause 507of MORTH Rev-5Rev-5.
Collection,supply and filling of Well Gravel in layers of not more than 15cm thick including all cost and conveyance of Gravel from the approved quarry to the work site and stacking them to departmental gauge for pre measurement including labourcharges for spreading and all other incidental charges etc, complete complying as per clause 401 MORTH specification.
PONMALAR (BID ID -1351190)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .