| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 CrAccepted-AOC 0 | ₹10.1 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹10.2 CrRejected-Finance | ₹10.2 Cr | L2 | Rejected-Finance Reject Due to Higher Rate |
| 3 | L3₹10.3 CrRejected-Finance | ₹10.3 Cr | L3 | Rejected-Finance Reject Due to Higher Rate |
| 4 | L4₹11.7 CrRejected-Finance | ₹11.7 Cr | L4 | Rejected-Finance Reject Due to Higher Rate |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Qualified in Technical bid |
Tender Value
₹14.5 Cr
EMD Value
₹29 L
Closing Date
30 Jan 2021, 12:00 pmClosed
K K PAHUJA
Superintending Engineer, Sultanpur-Amethi Circle, PWD, Sultanpur
Widening and Strengthening of Lambhua Arjunpur gothuwa Gajipur (kakrahi tak) km. 1 to 14 tak (ODR) Road in District Sultanpur
2021_CEUFZ_544591_1
31/1COM-SU.A.CIR./2020-21 DATE 05.01.2021
Open Tender
Civil Works
365 days
SULTANPUR
Widening and Strengthening of Lambhua Arjunpur gothuwa Gajipur (kakrahi tak) km. 1 to 14 tak (ODR) Road in District Sultanpur
6 documents required · 6 mandatory
₹2,714
Yes
₹29 L
Yes
SULTANPUR
7 Jun 2021
13 Jan 2021
30 Jan 2021
13 Jan 2021
30 Jan 2021
13 Jan 2021
22 Jan 2021
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Construction of embankment with approved material obtained from borrow pits with all lifts and 4 Km. leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads 4 Km. transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MORT&H specification
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing, laying, spreading of graded stone aggregate (wet mix macadam stabilized) after mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying with 1% OPC cement and 3.5% emulsion in uniform single layers on sub- base / Sub grade and compacting with road roller to achieve the desired density
Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. As per MORT&H specification.
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification.
M/S A.S.TRADERS
M/S LUCKY TRADERS
M/s Alok Infra Projects
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid