| 1 | L-1₹13.7 LAccepted-AOC 1ST FLOOR FLAT NO A 104 ANANT EMEGINE SOCIETY PURANA BUS STAND KORBA DISTT KORBA C G 495678 | 495678 | L-1 | Accepted-AOC Accepted as the bidder attains L-1 status | |
| 2 | L-2₹11.7 L+₹7,900 (0.68%)Rejected-Finance 0 GOPAL GANJ CHABUTRA KE SAMNE PRATAPGARH PRATAPGARH PRATAPGARH RAJASTHAN 312605 | PRATAPGARH | RAJASTHAN | 312605 | L-2 | Rejected-Finance Rejected as the bidder attains L-2 status | |
| 3 | L-3₹13.3 L+₹1.7 L (14.2%)Rejected-Finance 42 11 DIPKA PALI ROAD DIPKA DIPKA KORBA CHHATTISGARH 495452 | KORBA | CHHATTISGARH | 495452 | L-3 | Rejected-Finance Rejected as the bidder attains L-3 status | |
| 4 | L-4₹15.0 L+₹3.4 L (29.1%)Rejected-Finance 12 NANDGAON PO NIGAHI DISTT SINGRAULI MP 486884 | SINGRAULI | MADHYA PRADESH | 486884 | L-4 | Rejected-Finance Rejected as the bidder attains L-4 status | |
| 5 | L-5₹15.4 L+₹3.8 L (32.6%)Rejected-Finance PATHAK COMPLEX NEAR NAGAR PALIKA GATE PALI ROAD DIPKA DISTT KORBA CG 495452 | KORBA | CHHATTISGARH | 495452 | L-5 | Rejected-Finance Rejected as the bidder attains L-5 status |
| Sl No | Description | Qty | Unit | V R ENTERPRISES L2 | SHASHI BHUSHAN SINGH L3 | DUCK CONSTRUCTION COMPANY L4 | POWERTEK INDIA L6 | JAGDAMBA ASSOCIATES L5 | AARNA Constructions L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Transportation of poles loading onto departmental truck from stock yard, unloading from truck and shifting from road side to pole pit | 200 | No. | 150 ₹30,000 | 200 ₹40,000 | 350 ₹70,000 | 1,400 ₹2,80,000 | 262 ₹52,400 | 50 ₹10,000 Lowest |
| 2.00 | Shifting of materials other than poles from stockyard to pole pit | 200 | No. | 20 ₹4,000 Lowest | 40 ₹8,000 | 200 ₹40,000 | 210 ₹42,000 | 56 ₹11,200 | 50 ₹10,000 |
| 3.00 | Erection of 9/11/13 mtr long steel tubular poles including excavation of pole pit as per site conditions and grouting with OB stone boulder without cement, sand and stone aggregate etc., as required. | 170 | No. | 2,150 ₹3,65,500 Lowest | 2,450 ₹4,16,500 | 3,000 ₹5,10,000 | 2,960 ₹5,03,200 | 3,166 ₹5,38,220 | 2,800 ₹4,76,000 |
| 4.00 | Erection of 9/11/13 mtr long steel tubular poles including excavation of pole pit as per site conditions and grouting by OB Boulder and cement, without sand and stone aggregate. | 30 | No. | 2,150 ₹64,500 Lowest | 2,350 ₹70,500 | 3,000 ₹90,000 | 3,450 ₹1,03,500 | 4,415 ₹1,32,450 | 2,850 ₹85,500 |
| 5.00 | Erection of stay set complete : Supply of GI stay set, 5/8" X 5 feet, along with all accessories and fixing of stay set with stay insulator including excavation for stay pit and grouting by OB, Boulder and cement | 120 | No. | 1,850 ₹2,22,000 | 1,600 ₹1,92,000 | 1,250 ₹1,50,000 Lowest | 1,960 ₹2,35,200 | 2,532 ₹3,03,840 | 2,500 ₹3,00,000 |
| 6.00 | Supply and erection of 11 KV grade Polymer disc insulator, ball and socket type, 70 KN for 11 KV overhead lines as required. | 240 | No. | 450 ₹1,08,000 | 600 ₹1,44,000 | 650 ₹1,56,000 | 850 ₹2,04,000 | 361 ₹86,640 | 180 ₹43,200 Lowest |
| 7.00 | Supply and erection of 11 KV grade Polymer pin insulator, ball and socket type, 10 KN for 11 KV overhead lines as required. | 320 | No. | 200 ₹64,000 | 300 ₹96,000 | 550 ₹1,76,000 | 456 ₹1,45,920 | 147 ₹47,040 | 110 ₹35,200 Lowest |
| 8.00 | Dismantling of 9/11/13 m pole with bracket etc. | 70 | No. | 650 ₹45,500 Lowest | 800 ₹56,000 | 1,550 ₹1,08,500 | 2,100 ₹1,47,000 | 1,269 ₹88,830 | 1,100 ₹77,000 |
| 9.00 | Dismantling of overhead line comprising of ACSR DOG conductor, GI Wire, cross arms, insulators etc as required. | 1 | Km | 15,000 ₹15,000 | 8,000 ₹8,000 | 2,000 ₹2,000 Lowest | 9,800 ₹9,800 | 63,248 ₹63,248 | 4,000 ₹4,000 |
| 10.00 | Stringing of DOG conductor, including un-coiling from drum, transporting to site, laying of conductor along route, stringing and binding on insulators and jumpering. | 5 | Km | 8,500 ₹42,500 | 12,000 ₹60,000 | 3,000 ₹15,000 Lowest | 8,900 ₹44,500 | 13,589 ₹67,945 | 3,200 ₹16,000 |
Tender Value
₹46.6 L
EMD Value
₹58,300
Closing Date
2 Aug 2025, 5:00 pmClosed
Staff Officer (EnM)
Office of the General Manager, Dipka Area, Ph. No. 9424141353
Monsoon preparatory work of HT overhead line pumping feeders of LK1, LK2 and Old Dipka sump in view of changed profile of sump area for the monsoon season at Dipka Expansion Project.
2025_SECL_339956_1
SECL/GM/DA/SO(EnM)/ e-tender/25-26/52 dtd-19/07/25
Open Tender
Electrical and Maintenance Works
Item Rate
90 days
Dipka Expansion Project, Dipka Area
Please refer to tender documents
5 documents required · 5 mandatory
₹58,300
1 Oct 2025
21 Jul 2025
4 Aug 2025
21 Jul 2025
2 Aug 2025
22 Jul 2025
21 Jul 2025 - 28 Jul 2025
Amount
Transportation of poles loading onto departmental truck from stock yard, unloading from truck and shifting from road side to pole pit
Shifting of materials other than poles from stockyard to pole pit
Erection of 9/11/13 mtr long steel tubular poles including excavation of pole pit as per site conditions and grouting with OB stone boulder without cement, sand and stone aggregate etc., as required.
Erection of 9/11/13 mtr long steel tubular poles including excavation of pole pit as per site conditions and grouting by OB Boulder and cement, without sand and stone aggregate.
Erection of stay set complete : Supply of GI stay set, 5/8" X 5 feet, along with all accessories and fixing of stay set with stay insulator including excavation for stay pit and grouting by OB, Boulder and cement
Supply and erection of 11 KV grade Polymer disc insulator, ball and socket type, 70 KN for 11 KV overhead lines as required.
Supply and erection of 11 KV grade Polymer pin insulator, ball and socket type, 10 KN for 11 KV overhead lines as required.
Dismantling of 9/11/13 m pole with bracket etc.
Dismantling of overhead line comprising of ACSR DOG conductor, GI Wire, cross arms, insulators etc as required.
Stringing of DOG conductor, including un-coiling from drum, transporting to site, laying of conductor along route, stringing and binding on insulators and jumpering.
Dismantling of overhead line comprising of ACSR Rabbit Conductor, GI Wire, cross arms, insulators etc as required.
Stringing of Rabbit conductor, including un-coiling from drum, transporting to site, laying of conductor along route, stringing and binding on insulators and jumpering.
Erection of cradle guarding including supply of 8 SWG/4 mm G.I wire, fabrication of the cradle guard and fixing onto guarding channels.
Supplying and fixing of MS nut bolt of different size as required.
Fabrication of MS Channel/Angle/Flat for bracket or clamp as per requirement.
Earthing of G.I Earth plate 600mm x 600mm x 6 mm thick including accessories and providing masonary enclosure with CL/MS cover plate hinged to frame, having locking arrangement and 20 mm dia. G.I. watering pipe- 2.7 m long with funnel etc. along with charcoal/ coke and salt as required.
Supplying and fixing of 25 mm x 5 mm GI strip as earthing continuity conductor, including connection/ termination with GI nut, bolt, spring washer etc. as required. (@ 10m earth pit for 14 sets.)
Note: The estimated cost is excluding CMPF @ 12% and CMPS @ 7%. These statutory payment as applicable shall be reimbursed to the contractor on production of proof of payment limited to the maximum likely number of workmen to be deployed per day is 08 nos.
Total impact of GST for the purpose of CTC
V R ENTERPRISES (BID ID -1170258)
SHASHI BHUSHAN SINGH (BID ID -1171565)
DUCK CONSTRUCTION COMPANY (BID ID -1172036)
JAGDAMBA ASSOCIATES (BID ID -1172186)
POWERTEK INDIA (BID ID -1172110)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .