| Sl No | Description | Qty | Unit | K.Moorthy L1 | sangeetha L2 |
|---|---|---|---|---|---|
| 1.00Construction of Culvert from Kattukandigai in Asanallikuppam panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B | 40.58 | Cum | 260 ₹10,551 Lowest | 262 ₹10,632 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. Complete | 5.07 | Cum | 5,647 ₹28,630 Lowest | 5,647 ₹28,630 Lowest |
| 4.00 | Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. Complete | 32.73 | Sqm | 5,917 ₹1,93,663 Lowest | 5,917.94 ₹1,93,694 |
| 5.00 | Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. Complete | 3.36 | Cum | 6,940 ₹23,318 Lowest | 6,940.58 ₹23,320 |
| 6.00 | RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc, | 3.31 | MT | 9,372 ₹31,021 Lowest | 9,372.8 ₹31,024 |
| 7.00 | Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete | 0.3 | Cum | 91,873.22 ₹27,562 Lowest | 91,873.22 ₹27,562 Lowest |
| 8.00 | Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items | 85.44 | Cum | 547 ₹46,736 Lowest | 547.5 ₹46,778 |
| 9.00 | Deck Slab | 12.13 | Sqm | 1,095 ₹13,282 Lowest | 1,095 ₹13,282 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 67,457.34 ₹67,457.34 Lowest | 67,485.96 ₹67,485.96 |
Tender Value
Refer Docs
EMD Value
₹4,482
Closing Date
16 Jul 2026, 3:00 pmClosed
The President
The President Panchayat Office Asanallikuppam
Construction of Culvert from Kattukandigai in Asanallikuppam panchayat
2026_RDTN_684628_1
A2/751/2025
Open Tender
Civil Works
Item Rate
Panchayat Office Asanallikuppam
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,482
Yes
18 Jul 2026
8 Jul 2026
16 Jul 2026
8 Jul 2026
16 Jul 2026
8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Culvert from Kattukandigai in Asanallikuppam panchayat | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B | 40.58 | Cum | 263.78 | ₹10,704.19 |
| 3 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. Complete | 5.07 | Cum | 5,647.14 | ₹28,631 |
| 4 | Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. Complete | 32.73 | Sqm | 5,917.94 | ₹1,93,694.18 |
| 5 | Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. Complete | 3.36 | Cum | 6,940.58 | ₹23,320.35 |
| 6 | RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc, | 3.31 | MT | 9,372.8 | ₹31,023.97 |
| 7 | Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete | 0.3 | Cum | 91,873.22 | ₹27,561.97 |
| 8 | Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items | 85.44 | Cum | 547.5 | ₹46,778.4 |
| 9 | Deck Slab | 12.13 | Sqm | 1,095 | ₹13,282.35 |
| 10 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.44 MB
BOQ_822980.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .