Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAdmitted-Finance | ₹3.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.0 Cr+₹47.2 L (13.5%)Admitted-Finance | ₹4.0 Cr+₹47.2 L (13.5%) | L2 | Admitted-Finance |
| 3 | L3₹4.3 Cr+₹79.4 L (22.7%)Admitted-Finance | ₹4.3 Cr+₹79.4 L (22.7%) | L3 | Admitted-Finance |
| 4 | L4₹4.8 Cr+₹1.3 Cr (36.1%)Admitted-Finance GUWAHATI | KAMRUP | ASSAM | 781030 | ₹4.8 Cr+₹1.3 Cr (36.1%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Meetei Construction Pvt. Ltd. L4 | M/S NDS Construction L1 | Vertex Construction L2 | M/s North East Enterprises L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Clearing grass and removal of rubbish upto a distance of 50 meters outside the periphery of area cleared (i) (By manual means) | 1.6 | Ha | 29,233.83 ₹46,774.13 | 18,500.37 ₹29,600.59 Lowest | 26,428.9 ₹42,286.24 | 26,908 ₹43,052.8 |
| 2.00 | Dismantling of flexible pavements (Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 meters, stacking servicable and unservicable material) (ii) By mechanical means: BITUMINOUS COURSE | 1,092 | Cum | 572.34 ₹6,24,995.28 | 647.2 ₹7,06,742.4 | 517.44 ₹5,65,044.48 Lowest | 518 ₹5,65,656 |
| 3.00 | Dismantling of flexible pavements (Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 meters, stacking servicable and unservicable material) (ii) By mechanical means: GRANULAR COURSE | 3,150 | Cum | 109.96 ₹3,46,374 | 460.22 ₹14,49,693 | 99.41 ₹3,13,141.5 Lowest | 101 ₹3,18,150 |
| 4.00 | Providing,laying,spreading and compacting stones agrregate to wet mix macadam specification including premixing the material with water to OMC in mechanical mix plant carriage of mixed material by tipper to site,laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 3,150 | Cum | 3,811.34 ₹1,20,05,721 | 2,422.52 ₹76,30,938 Lowest | 3,901.66 ₹1,22,90,229 | 3,999 ₹1,25,96,850 |
| 5.00 | Dense Graded Bituminous Macadam Grading - II
Providing and laying dense graded bituminous macadam with
higher capacity batch type HMP using crushed aggregates of
specified grading, premixed with bituminous binder @ 4.0
percent by weight of total mix and filler, transporting the hot
mix to work site, laying with a hydrostatic paver finisher with
sensor control to the required grade, level and alignment,
rolling with smooth wheeled, vibratory and tandem rollers to
achieve the desired compaction as per MoKIH specification
clause No. 505 complete in all respects. a) VG-40 | 12,600 | Sqm | 1,137.88 ₹1,43,37,288 | 1,058.1 ₹1,33,32,060 | 705.9 ₹88,94,340 Lowest | 900 ₹1,13,40,000 |
| 6.00 | Tack coat on Bituminous surfaces
Providing and applying tack coat with bitumen emulsion
using emulsion pressure distributor at the rate of 0.20 kg per
sqm on the prepared bituminous/granular surface cleaned
with mechanical broom | 12,600 | Sqm | 13.39 ₹1,68,714 | 8.5 ₹1,07,100 Lowest | 12.1 ₹1,52,460 | 13 ₹1,63,800 |
| 7.00 | Tack Coat on Granular surfaces treated with primer
Providing and applying tack coat with bitumen emulsion
using emulsion pressure distributor at the rate of 0.25 kg
per sqm on the prepared bituminous surface cleaned with
mechanical broom. | 945 | Cum | 16.5 ₹15,592.5 | 10.48 ₹9,903.6 Lowest | 14.92 ₹14,099.4 | 14.5 ₹13,702.5 |
| 8.00 | Prime Coat on WMM / WBM
Providing and applying primer coat with bitumen emulsion
on prepared surface of granular Base including clearing of
road surface and spraying primer at the rate of 0.70 kg/sqm
using mechanical means. | 21,700 | Cum | 45.53 ₹9,88,001 | 28.93 ₹6,27,781 Lowest | 41.16 ₹8,93,172 | 42 ₹9,11,400 |
| 9.00 | Bituminous Concrete (Providing and laying bituminous
concrete with higher capacity batch type hot mix plant
using crushed aggregates of specified grading, premixed
with bituminous binder @ 5.2 per cent of mix and filler,
transporting the hot mix to work site, laying with a hydrostatic
paver finisher with sensor control to the required grade, level
and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per
MORTH specification clauseNo. 507 complete in all respects
for Grading-I ( 13 mm nominal size)
a) VG-40 | 315 | Cum | 13,156.14 ₹41,44,184.1 | 8,362.15 ₹26,34,077.25 Lowest | 12,474.05 ₹39,29,325.75 | 13,520 ₹42,58,800 |
| 10.00 | Providing and laying semi dense bituminous concrete with 60-80 TPH batch type hot mix plant producing an average output of 35 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 508 complete in all respects
I) Grading -II-(10 mm Nominal Size) (A) Using Bitumen 60/70 | 1,092 | Cum | 13,616.12 ₹1,48,68,803.04 | 7,705.03 ₹84,13,892.76 Lowest | 11,505.36 ₹1,25,63,853.12 | 11,600 ₹1,26,67,200 |
Tender Value
₹5.1 Cr
EMD Value
₹5.1 L
Closing Date
29 Nov 2022, 3:00 pmClosed
DGM (P), NHIDCL RO IMPHAL
NHIDCL RO IMPHAL
Restoration and Rehabilitation of NH-02 of Imphal-Kohima Road from existing chainage Km 287.00 to Km 299.60 Total Length 12.60 Km in the state of Manipur in the FY 2022-23 on Item Rate mode
2022_NHIDC_722208_1
NHIDCL/RO-Imphal/RR/I-K/Km.287 -Km 299.60/2022-2
Open Tender
Civil Works
Item Rate
180 days
NHIDCL RO IMPHAL
Please refer Tender documents.
5 documents required · 5 mandatory
₹11,800
NHIDCL RO IMPHAL
₹5.1 L
5 Dec 2022
7 Nov 2022
30 Nov 2022
7 Nov 2022
29 Nov 2022
7 Nov 2022
Amount
Clearing grass and removal of rubbish upto a distance of 50 meters outside the periphery of area cleared (i) (By manual means)
Dismantling of flexible pavements (Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 meters, stacking servicable and unservicable material) (ii) By mechanical means: BITUMINOUS COURSE
Dismantling of flexible pavements (Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 meters, stacking servicable and unservicable material) (ii) By mechanical means: GRANULAR COURSE
Providing,laying,spreading and compacting stones agrregate to wet mix macadam specification including premixing the material with water to OMC in mechanical mix plant carriage of mixed material by tipper to site,laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Dense Graded Bituminous Macadam Grading - II Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoKIH specification clause No. 505 complete in all respects. a) VG-40
Tack coat on Bituminous surfaces Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom
Tack Coat on Granular surfaces treated with primer Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Prime Coat on WMM / WBM Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.
Bituminous Concrete (Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.2 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clauseNo. 507 complete in all respects for Grading-I ( 13 mm nominal size) a) VG-40
Providing and laying semi dense bituminous concrete with 60-80 TPH batch type hot mix plant producing an average output of 35 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 508 complete in all respects I) Grading -II-(10 mm Nominal Size) (A) Using Bitumen 60/70
Vertex Construction
M/s North East Enterprises
Meetei Construction Pvt. Ltd.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
RFP.pdf
Tender Documents • 1.41 MB
BOQ_759578.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .