| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.2 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹12.3 Cr+₹10.6 L (0.87%)Admitted-Finance SHRI DANVENDRA PRATAP SINGH SHRIRAM COMPLEX SITPURA BUS STAND NAGOD ROAD SATNA MADHYA PRADESH 485446 | SATNA | SATNA | MADHYA PRADESH | 485446 | L2 | Admitted-Finance | ||
| 3 | L3₹12.3 Cr+₹12.7 L (1.04%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹13.1 Cr
EMD Value
₹26.1 L
Closing Date
4 Nov 2024, 6:00 pmClosed
ACE PWD Zone-I Jodhpur
ACE PWD Zone-I Jodhpur
Repair of various Rural Roads/CD works badly damaged during heavy rains in biferjoy cyclone, District Pali. Package No.RJ-25-01/DRR/2024-25
2024_CEPWD_426028_12
NIT No 11 of 2024-25 ACE PWD ZONE I Jodhpur
Open Tender
Civil Works
Percentage
300 days
Pali
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,000
Executive Engineer, PWD Division, Pali
₹26.1 L
Yes
9 Nov 2024
11 Oct 2024
5 Nov 2024
11 Oct 2024
4 Nov 2024
11 Oct 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (A) Road Work Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material upto a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm thickness as per MORTH specification clause 201-By mechanical Means . -In area of light jungle | - | Hect | - | - |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 metres, stacking serviceable and unserviceable materials separately as per MORTH specification clause 202.- By Mechanical Means :-Bituminous courses | - | Cum | - | - |
| 3 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 301 | 0.4 | Cum | - | - |
| 4 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 100 m as per Techn Specification Clause 301 | 0.4 | Cum | - | - |
| 5 | Extra for laying earth as per specification for compaction in 200 mm thick loose layers and dressing [MoRTH Specification Clause 305.3.5]. - BY MANUAL MEANS : When Laying of earth in layers is done simultaneously with excavation of earth work with all lead and lift but excluding rolling and watering | 0.4 | Cum | - | - |
| 6 | Extra for watering the earth to bring the earth upto required O.M.C excluding rolling | 0.4 | Cum | - | - |
| 7 | Extra for rolling to specification with the use of Vibratory roller when earth is at suitable moisture content with desired field density not less than 95% of maximum dry density (Modify Heavy Proctor test), excluding watering. | 0.4 | Cum | 1 | ₹0.4 |
| 8 | Providing laying, spreading and compacting specified graded crushed stone in sub-base course including premixing the material at OMC in wet mix plant, carriage of mixed material, laying in uniform layers with motor grader, F.E.loader on a prepared surface and compacting with vibratory compactor to achieve the desired density including all material, labour, mach-nery, lighting barricading and maintenance of diversion complete.[MoRTH specification Clause 401] includiong 20 Km lead .b) For Grading II Material | - | Cum | - | - |
| 9 | Providing and laying granular sub-base material having P.I.not more than 6, including spreading in layers not exceeding 150 mm compacted thickness and consolidation by 8-10 tonne power roller to required camber and grade including cost of water and hire charges of machinery, including T&P with all lead (Compacted thickness to be measured).as per MORTH specification table 400-1, 400-2 : - For grading-III with CBR value not less than 20. to attain 100% proctor density. | - | Cum | - | - |
| 10 | Providing, laying, spreading and compacting stone aggregate of as per table 400-12 and 400-13 Wet Mix Macadam specification including premixing the material with water to OMC inwet mix plant as per approved design mix, carriage of mixed material by Tipper to site laying in uniform layers with motor grader/F.E.Loader/paver finisher, in sub base/ base course on a well prepared under base and compacting with vibrotry roller to achieve the desired density including lighting, guarding, barricading and maintance of diversion etc. (MoRTH specification : Clause 406) by mechanical mean with lead up to 20 Km. | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.04 MB
Tendernotice_2.pdf
PDF • 2.34 MB
Tendernotice_3.pdf
PDF • 3.74 MB
Tendernotice_4.pdf
PDF • 0.19 MB
Tendernotice_5.pdf
PDF • 1.69 MB
Tendernotice_6.pdf
PDF • 0.44 MB
Tendernotice_7.pdf
PDF • 5.67 MB
BOQ_767925.xls
BOQ • 0.31 MB
PQ_25_01_Pali.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .