Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.1 L+₹22,565 (4.60%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M MAHESHKANNAN L1 | B BHAVANI L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling RCC by manual/ by using deploying machineries | 9 | m3 | 3,915 ₹35,235 Lowest | 4,095.1 ₹36,855.9 |
| 2.00 | Hire charges for deploying earth moving machinery (JCB/Poclain) for earthwork including diesel, oil and labour charges etc., complete. | 16 | hr | 826.2 ₹13,219.2 Lowest | 864.2 ₹13,827.2 |
| 3.00 | Hire charges for Tipper tractor including diesel, oil and labour charges etc., complete. | 32 | hr | 482.3 ₹15,433.6 Lowest | 504.5 ₹16,144 |
| 4.00 | Supplying, erecting shuttering with necessary sipports for plinth beam with all cross bracing etc., complete ( RCC column footing plinth, beam and lintel sides )- For Drain work | 140 | m2 | 790.8 ₹1,10,712 Lowest | 827.2 ₹1,15,808 |
| 5.00 | Plain Cement Concrete 1:2:4 (One part of Cement, two part of Crushed Sand (M- Sand), four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 17 | m3 | 7,538.8 ₹1,28,159.6 Lowest | 7,885.6 ₹1,34,055.2 |
| 6.00 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed. | 102 | m2 | 821.8 ₹83,823.6 Lowest | 859.6 ₹87,679.2 |
| 7.00 | Supplying fabricating and placing in position of MS grills for reinforcement rate including the cost of steel for all works, blinding wire etc. | 304 | Kg | 95.4 ₹29,001.6 Lowest | 99.8 ₹30,339.2 |
| 9.00 | ADD GST 18% | 1 | GST | 74,804.6 ₹74,804.6 Lowest | 78,245.6 ₹78,245.6 |
Tender Value
₹4.9 L
EMD Value
₹4,906
Closing Date
11 Mar 2026, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai, Thallakulam, Madurai.
Raising the Existing Storm Water Drain Wall and Providing Precast Slab Arrangements at Thirumalai Colony Main Road in Ward No.65.
2026_MAWS_669933_1
Z2 / E1 / Est.562 / 25-26
Open Tender
Civil Works
Lump-sum
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,906
30 Sept 2026
4 Mar 2026
11 Mar 2026
4 Mar 2026
11 Mar 2026
4 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling RCC by manual/ by using deploying machineries | 9 | m3 | - | - |
| 2 | Hire charges for deploying earth moving machinery (JCB/Poclain) for earthwork including diesel, oil and labour charges etc., complete. | 16 | hr | - | - |
| 3 | Hire charges for Tipper tractor including diesel, oil and labour charges etc., complete. | 32 | hr | - | - |
| 4 | Supplying, erecting shuttering with necessary sipports for plinth beam with all cross bracing etc., complete ( RCC column footing plinth, beam and lintel sides )- For Drain work | 140 | m2 | - | - |
| 5 | Plain Cement Concrete 1:2:4 (One part of Cement, two part of Crushed Sand (M- Sand), four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 17 | m3 | - | - |
| 6 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed. | 102 | m2 | - | - |
| 7 | Supplying fabricating and placing in position of MS grills for reinforcement rate including the cost of steel for all works, blinding wire etc. | 304 | Kg | - | - |
| 9 | ADD GST 18% | 1 | GST | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_805072.xls
BOQ • 0.30 MB
doc1.pdf
Tender Documents • 0.83 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .