Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹122.8 CrAccepted-AOC | ₹122.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹135.2 CrRejected-AOC | ₹135.2 Cr | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per Scrutiny |
| 4 | Rejected-Technical | - | - | Rejected-Technical As per Scrutiny |
| 5 | Rejected-Technical 807 PEARL BUSINESS PARK NETAJI SUBHASH PLACE PITAMPURA DELHI | DELHI | DELHI | - | - | Rejected-Technical As per Scrutiny |
| Sl No | Description | Qty | Unit | SMC Infrastructures pvt ltd L2 | GYAN CONSTRUCTION CO L1 |
|---|---|---|---|---|---|
| 1.00 | Designing and constructing new 72 MLD Capacity (with 20 % overloading) Water Treatment Plant with allied works and its commissioning including geotechnical investigation, preparation of hydraulic and RCC designs and drawings, construction of aeration fountain, inlet chamber, flash mixer, raw water channels, construction of two numbers of Clari flocculators (36 MLD capacity each), byepass arrangements, filter house, chemical house including testing laboratory and toilets, filter backwash arrangements with elevated water tank, air blowers and pumps, Store Room, Filter beds, under-drain system with V-wire arrangement & required sluice gates/valves, Construction of Chlorine contact tank and chlorine room, Chemical dosing pumps and pipeline, construction of RCC pure water sumps (2 Numbers having 9000 Cum capacity each), Pump House over Pure Water Sumps, interconnections and bye-pass arrangements, Waste water recirculation sump and pump house, valves, including all necessary piping arrangement for recirculation and arrangement for sludge removal as per site requirement, arrangement for integration of new WTP with existing WTP, construction of internal CC roads with RCC built up gutters, kerbing, service pipes, road markings etc., LED street lights, roof top grid connected solar PV system over pure water sumps as per specification, landscaping, tree plantation, construction of minimum 100 sqm built up area conference cum display RCC building with all furnishings and furniture, providing all external/internal painting to the structure with waterproof apex paint and all waterproof apex paint and all water contacting surfaces painting, food grade or special epoxy paint, waterproofing work of all structures, providing lightening arresters at WTP site, providing, designing, erecting and commissioning of CCTV camera and intercom system at new WTP site. Other necessary sub-works/equipment's/accessories required for successful commissioning of the 72 MLD ( with 20 % overload) Water Treatment Plant as per approved GAD, approved RCC/hydraulic designs. | 1 | Job | 1,35,22,07,822 ₹135.2 Cr | 1,22,79,37,585 ₹122.8 Cr |
Updated dates
Tender Value
Refer Docs
EMD Value
₹61.5 L
Closing Date
29 Jan 2026, 11:00 amClosed
Superintending Engineer, MIDC Circle Office, CSN
Superintending Engineer, MIDC Circle Office, CSN
Waluj Centralized Water Supply Scheme. Upgradation and expansion of existing water supply scheme by Designing and construction of new 72 MLD WTP and allied works
2025_MIDC_1257849_1
20/A/01
Open Tender
Civil Works
CSN
Please refer Tender documents.
2 documents required · 2 mandatory
₹29,500
₹61.5 L
Superintending Engineer, MIDC Circle Office, CSN
6 Apr 2026
10 Dec 2025
30 Jan 2026
10 Dec 2025
29 Jan 2026
24 Dec 2025
10 Dec 2025 - 18 Dec 2025
19 Dec 2025
Designing and constructing new 72 MLD Capacity (with 20 % overloading) Water Treatment Plant with allied works and its commissioning including geotechnical investigation, preparation of hydraulic and RCC designs and drawings, construction of aeration fountain, inlet chamber, flash mixer, raw water channels, construction of two numbers of Clari flocculators (36 MLD capacity each), byepass arrangements, filter house, chemical house including testing laboratory and toilets, filter backwash arrangements with elevated water tank, air blowers and pumps, Store Room, Filter beds, under-drain system with V-wire arrangement & required sluice gates/valves, Construction of Chlorine contact tank and chlorine room, Chemical dosing pumps and pipeline, construction of RCC pure water sumps (2 Numbers having 9000 Cum capacity each), Pump House over Pure Water Sumps, interconnections and bye-pass arrangements, Waste water recirculation sump and pump house, valves, including all necessary piping arrangement for recirculation and arrangement for sludge removal as per site requirement, arrangement for integration of new WTP with existing WTP, construction of internal CC roads with RCC built up gutters, kerbing, service pipes, road markings etc., LED street lights, roof top grid connected solar PV system over pure water sumps as per specification, landscaping, tree plantation, construction of minimum 100 sqm built up area conference cum display RCC building with all furnishings and furniture, providing all external/internal painting to the structure with waterproof apex paint and all waterproof apex paint and all water contacting surfaces painting, food grade or special epoxy paint, waterproofing work of all structures, providing lightening arresters at WTP site, providing, designing, erecting and commissioning of CCTV camera and intercom system at new WTP site. Other necessary sub-works/equipment's/accessories required for successful commissioning of the 72 MLD ( with 20 % overload) Water Treatment Plant as per approved GAD, approved RCC/hydraulic designs.
stage.html
html • 0.05 MB
techsummary_2167990.pdf
BOQ Comparative Chart
xlsx
finsummary_2167990.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.12 MB
ItemSpecification.pdf
Other Document • 0.23 MB
LTETATIVELAYOUTWTP.pdf
Additional Documents • 1.14 MB
BOQ_2167990.xls
BOQ • 0.33 MB
TenderDocument.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid