Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹16.9 L
EMD Value
₹16,934
Closing Date
16 Jun 2026, 5:00 pmClosed
EXECUTIVE OFFICER
OFFICE OF THE EXECUTIVE OFFICER,NAC RANPUR
CONSTRUCTION OF CC ROAD ALONG MCC /MRF RD 221M TO 442M
2026_ORULB_131019_26
RNPNAC-02/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
NAC RANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹16,934
Yes
17 Jun 2026
5 Jun 2026
17 Jun 2026
5 Jun 2026
16 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in foundation in hard soil including rough dressing and levelling the bed by depositing soil within initial lead and lift . | - | Cum | 1 | - |
| 2 | Supplying and filling Sand in foundation and on Road Surface including watering and ramming with Cost, Conveyance and Royalty of all materials etc.initial lead and lift . | 87.85 | Cum | 1,020.8 | ₹89,677.28 |
| 3 | Cement Concrete in (1:3:6) using 40mm size Hard GraniteC.B. metal in foundation Bed and Road including watering, curring with Cost, Conveyance and Royalty of all materials etc. allcomplete . | 116.47 | Cum | 6,326.1 | ₹7,36,800.87 |
| 4 | Cement Concrete in (1:2:4:) using 12MM to 20mm size hard granite chips (C.B.) with watering and Curing including cost, conveyance and royalty of all materials etc. complete | 95.6 | Cum | 7,954.1 | ₹7,60,448.55 |
| 5 | Rigid and Smooth centering and shuttering for cement concrete work and dismantling them after casting including cost & conveyance of all materials etc. complete. | 380.12 | Sqm | 249.8 | ₹94,953.98 |
| 6 | Add Cost of Display Board & Photographs (Pre ,During & Post ) | - | Cum | 1 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.51 MB
BOQ_594594.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .