| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC | ₹5.2 L | L1 | Accepted-AOC As per Upload |
| 2 | L2₹5.4 LRejected-Finance GRAM SOHANAAG THANA BELGHAT DISTRICT GORAKHPUR | ₹5.4 L | L2 | Rejected-Finance As per Upload |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per Upload |
| Sl No | Description | Qty | Unit | M/s M.K Traders L1 | KALAYANI CONSTRUTION L2 |
|---|---|---|---|---|---|
| 1.00 | E/W in excavation of foundation in all type of soil including lead up to 30m lift up to 1.50m and its proper disposal and back filling as per direction by engineer in charge required for proper completion of work including cost of all T&P,Labour etc. | 474.68 | M³ | 103 ₹48,892.14 | 90 ₹42,721.29 |
| 2.00 | Laying C.C- A 40 (M-10) in foundation of all structures with Cement O.P.C.,43 grade. course sand of F.M. not less than 2.0 and hard stone ballest (20-40mm size) including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc. | 2.8 | M³ | 8,406 ₹23,536.80 | 7,600 ₹21,280 |
| 3.00 | Laying R.C.C, A-20, (M-20) with cement (OPC-43 Grade)coarse sand of F.M not less than 2.5 and crused hard stone grit of size 4.75 to 20mm, including lead up to 60m lift up to 3m, mechnical mixing & mechnical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc. | 18.09 | M³ | 10,592 ₹1.9 L | 8,800 ₹1.6 L |
| 4.00 | Centering & Shuttering for C.C & R.C.C work with all lead & lift required for proper completion of work including cost of all material and scafolading labour, T&P etc. Complete. | 115.5 | M² | 730 ₹84,315 | 598 ₹69,069 |
| 5.00 | Cutting bending binding and placing TMT steel bar for reinforcement with cost of binding wirw with required for proper completion of work including cost of all material, labour, T&P etc | 0.68 | MT | 65,759 ₹44,584.60 | 53,160 ₹36,042.48 |
| 6.00 | Dewatering with all cost of power POL machine pump, well point system & operator with assembling & dismantling of equipment etc. | 951.15 | Kwh | 55.11 ₹52,417.88 | 34 ₹32,339.10 |
| 7.00 | Filling of local sand with all lead lift, including excavation, loading, unloading, with all cost of labour T&P etc. complete in all respects. | 156.42 | Cum | 200 ₹31,284 | 957 ₹1.5 L |
| 8.00 | Supplying & Fixing 200mm HDPE PIPE required for proper completion of work. including all cost of material.labour and T.&.P. etc. | 20 | RM | 1,008 ₹20,160 | 940 ₹18,800 |
| 9.00 | PVC water stop seal 10mm thick for proper completion of work including cost of all material, labour, T&P etc | 16 | RM | 1,138 ₹18,208 | 600 ₹9,600 |
Tender Value
₹6.7 L
EMD Value
₹13,000
Closing Date
24 Feb 2026, 2:00 pmClosed
SARYU NAHAR KHAND BANSI SIDDHARTH NAGAR
SARYU NAHAR KHAND BANSI SIDDHARTH NAGAR
Const. Well at Left Bank of Campierganj Branch at Km. 34.475
2026_UPIDC_1117098_1
02/EESNKBANSI/2025-26
Open Tender
Civil Works - Canal
15 days
SIDDHARTH NAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹815
₹13,000
Yes
30 Mar 2026
18 Feb 2026
24 Feb 2026
18 Feb 2026
24 Feb 2026
18 Feb 2026
E/W in excavation of foundation in all type of soil including lead up to 30m lift up to 1.50m and its proper disposal and back filling as per direction by engineer in charge required for proper completion of work including cost of all T&P,Labour etc.
Laying C.C- A 40 (M-10) in foundation of all structures with Cement O.P.C.,43 grade. course sand of F.M. not less than 2.0 and hard stone ballest (20-40mm size) including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc.
Laying R.C.C, A-20, (M-20) with cement (OPC-43 Grade)coarse sand of F.M not less than 2.5 and crused hard stone grit of size 4.75 to 20mm, including lead up to 60m lift up to 3m, mechnical mixing & mechnical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc.
Centering & Shuttering for C.C & R.C.C work with all lead & lift required for proper completion of work including cost of all material and scafolading labour, T&P etc. Complete.
Cutting bending binding and placing TMT steel bar for reinforcement with cost of binding wirw with required for proper completion of work including cost of all material, labour, T&P etc
Dewatering with all cost of power POL machine pump, well point system & operator with assembling & dismantling of equipment etc.
Filling of local sand with all lead lift, including excavation, loading, unloading, with all cost of labour T&P etc. complete in all respects.
Supplying & Fixing 200mm HDPE PIPE required for proper completion of work. including all cost of material.labour and T.&.P. etc.
PVC water stop seal 10mm thick for proper completion of work including cost of all material, labour, T&P etc
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BID.pdf
Tender Documents • 3.79 MB
BOQ_2075317.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid