Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.3 LAccepted-Finance | ₹2.3 L | 1 | Accepted-Finance 1 |
| 2 | 2₹3.1 L+₹84,070.43 (36.5%)Accepted-Finance | ₹3.1 L+₹84,070.43 (36.5%) | 2 | Accepted-Finance 2 |
| 3 | 3₹3.3 L+₹1.0 L (45.2%)Accepted-Finance | ₹3.3 L+₹1.0 L (45.2%) | 3 | Accepted-Finance 3 |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹3.3 L
EMD Value
₹10,020
Closing Date
28 Jul 2026, 4:00 pmClosed
Executive Engineer Jal Shakti PHE Div. Bijbehara
Executive Engineer Jal Shakti PHE Div. Bijbehara
providing laying and fixing of pipes for newly developed outgrowths at Hiller Barjayi, Tangpawa, Peeratakiya, Bahi and Hardpoor under District Capex (2026-27)
2026_PHE_316014_5
27/PHE/BIJ OF 2026-27
Open Tender
Civil Works - Water Works
Percentage
hardpora
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
Executive Engineer Jal Shakti PHE Div. Bijbehara
₹10,020
Yes
1 Aug 2026
16 Jul 2026
29 Jul 2026
16 Jul 2026
28 Jul 2026
16 Jul 2026
16 Jul 2026 - 28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 135.37 | Cum | 256.85 | ₹34,769.78 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 135.37 | Cum | 479.3 | ₹64,882.84 |
| 3 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work | - | - | - | - |
| 4 | 40 mm dia GI | 500 | Mtr | 44.85 | ₹22,425 |
| 5 | 25 mm dia GI | 500 | Mtr | 33.7 | ₹16,850 |
| 6 | 20 mm dia GI | 500 | Mtr | 22.25 | ₹11,125 |
| 7 | 15 mm dia GI | 650 | Mtr | 22.25 | ₹14,462.5 |
| 8 | Making connection of G.I. distribution branch with G.I. main of
following sizes by providing and fixing Tee, including cutting and
threading the pipe etc. complete | - | - | - | - |
| 9 | 25 to 40 mm nominal bore | 12 | No | 730.25 | ₹8,763 |
| 10 | 50 to 80 mm nominal bore | 6 | No | 1,387.25 | ₹8,323.5 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_1028922.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.65 MB
BOQ_1028922.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .