Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹94.5 LAccepted-AOC | ₹94.5 L Quoted ₹80.1 L | l1 | Accepted-AOC accepted since l1 . originial date of supplier is 25.01.2026 |
| 2 | l2₹81 L+₹90,000 (1.12%)Rejected-Finance | ₹81 L+₹90,000 (1.12%) | l2 | Rejected-Finance not lowest amount |
| 3 | Rejected-Technical | - | - | Rejected-Technical all technical documents required not submitted |
| 4 | Rejected-Technical | - | - | Rejected-Technical all technical documents required not submitted |
| 5 | Rejected-Technical | - | - | Rejected-Technical all technical documents required not submitted |
| Sl No | Description | Qty | Unit | Navnirmiti rural infrastructure developers pvt.ltd. L1 | Gallops Systems and Solutions L2 |
|---|---|---|---|---|---|
| 1.00SUPPLY, INSTALATION, TESTING AND COMMISSIONING OF PUFF PANEL WORK OF COLD STORAGE INTEGRATED PACKHOUSE, PRE-COOLING UNIT, RIPENING CHAMBER | |||||
| 1.01 | SUPPLY, INSTALATION, TESTING OF PUFF PANEL WORK OF COLD STORAGE INTEGRATED PACKHOUSE, PRE-COOLING UNIT, RIPENING CHAMBER | 1 | no | 73,00,000 ₹73,00,000 | 72,90,000 ₹72,90,000 Lowest |
| 2.01 | Transportation, INSTALLATION and Commissioning Charges | 1 | Lumpsum | 7,10,000 ₹7,10,000 Lowest | 8,10,000 ₹8,10,000 |
Tender Value
Refer Docs
Closing Date
30 Oct 2025, 12:00 pmClosed
PRESIDENT AATMANIRBHAR NATURAL VEGETABLES AND FRUI
kamtha po kinkhed tq murtijapur dist akola
AATMANIRBHAR NATURAL VEGETABLES AND FRUITS AND SPICES PRODUCER COMPANY LIMITED KAMTHA PO KINKHED TQ MURTIJAPUR DIST AKOLA
2025_DOAWB_1162909_2
SMART DIUAKOLA aatmanirbhar puff 10 25-26
Open Tender
Farm Machinery and Equipments
Item Rate
180 days
AATMANIRBHAR NATURAL VEGETABLES AND FRUITS AND SPI
as per tender document
2 documents required · 2 mandatory
₹1,180
Exempted
HeadDistrictImplementationUnitSmartProject
29 Mar 2026
30 Sept 2025
31 Oct 2025
30 Sept 2025
30 Oct 2025
30 Sept 2025
30 Sept 2025 - 9 Oct 2025
9 Oct 2025
SUPPLY, INSTALATION, TESTING AND COMMISSIONING OF PUFF PANEL WORK OF COLD STORAGE INTEGRATED PACKHOUSE, PRE-COOLING UNIT, RIPENING CHAMBER
SUPPLY, INSTALATION, TESTING OF PUFF PANEL WORK OF COLD STORAGE INTEGRATED PACKHOUSE, PRE-COOLING UNIT, RIPENING CHAMBER
Transportation, INSTALLATION and Commissioning Charges
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
NCPPUFFAATMANIRBHARFINAL.pdf
Tender Documents • 1.18 MB
BOQ_2105089.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .