Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹29.2 L+₹1.5 L (5.23%)Rejected-Finance FLAT NO 151 BLOCK NO 1 DIAMOND SQUARE CGHS LTD PLOT NO 13A SECTOR 6 DWARKA NEW DELHI 110075 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110075 | L2 | Rejected-Finance L2 | |
| 3 | L3₹33.2 L+₹5.5 L (19.8%)Rejected-Finance PLOT NO 32 FF SHIVAJI ENCLAVE NEW DELHI 110027 | NEW DELHI | NEW DELHI | DELHI | 110027 | L3 | Rejected-Finance L3 | |
| 4 | L4₹34.8 L+₹7.1 L (25.6%)Rejected-Finance INDEX NO E 108 HQ CWE NO 2 DELHI CANTT J 636 SECTOR 23 SANJAY NAGAR GHAZIABAD UTTAR PRADESH 201002 | GHAZIABAD | UTTAR PRADESH | 201002 | L4 | Rejected-Finance L4 | |
| 5 | L5₹35.2 L+₹7.5 L (27.0%)Rejected-Finance 14 98 RAM COLONY BARNALA ROAD SIRSA | SIRSA | SIRSA | HARYANA | 125055 | L5 | Rejected-Finance L5 |
Tender Value
₹43.4 L
EMD Value
₹86,760
Closing Date
28 May 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE AF FARIDABAD
Garrison Engineer AF Faridabad Dabua Colony Faridabad Haryana Pin-121005
REPAIR MAINT OF COOLING APPLIANCES INCLUDING ALLIED WORKS AT AF STN DADRI
2020_MES_320661_3
GE (FBD)/AF-47/2019-2020
Open Tender
Civil Works
Item Rate
330 days
AF STATION DADRI
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE AF FARIDABAD
₹86,760
Yes
6 Jul 2020
14 May 2020
30 May 2020
14 May 2020
28 May 2020
15 May 2020
60 days
Amount
Manning and Operation including minor maintenance to LT/HT Panells, 11 KV Transformers DG sets, HT OCBs,/VCBs HT GODs fuses and jumpers/AC units and allied work in the AF Stn Dadri with minor spares as required and directed by Engr-in-charge round the clock (24 Hrs a day ) including sunday and gazetted holidays incl maintenance and cleanliness of the sub station building and surrouding area including flower plantation etc to keep the installation in presentable condition in three shifts for :- (a) Sub Stn No -One (One Electrician (Skilled) for one shift One FGM (Skilled) for one shift One Ref Mech (Skilled) for One Shift and one Helper (Semi Skilled) for three shift) . The duty personnel along with helper must be available on duty as above per shift :- (i) 1st shift :- 0800 hrs to 1600 hrs (ii) 2nd shift 1600 hrs to 2400 hrs (iii) 3rd shift 2400 hrs to 0800 hrs
Manning and Operation including daily Maintenance/check to Water supply DG set and Pump House and sewage pump house including attending complaints of external water supply like leakage with minor spares as required and directed by Engr-in-charge round the clock (24 hrs a day as required) including sunday and gazetted holidays Maintenance and cleanliness of the Pump house and surrounding area including flower plantation etc to keep the installation in presentable condition in shifts consisting of the following by One FGM skilled for three shift and one helper semi skilled for three shift at pump houses in stn. (i) 1st shift :- 08.00 hrs to 16.00 hrs (ii) 2nd shift 16.00 hrs to 24.00 hrs (iii) 3rd shift 24.00 hrs to 08.00 hrs
Note applicable to Ser item No 1 & 2 above: - (a) Skilled Electrician should be ITI qualified with 3 yrs of experience in HT installation (b) Skilled FGM/Valve man should be ITI qualified with 3 yrs of experience in respective work. ( c) Helpers should be Matric pass with 2 yrs of experience in respective work. (d) Duty Roster to be submittedand approved by Engineer-in-Charge every month by Contractor or his supervisor. (e) The contractor has to supply printed stationary which is deemed to be incl into the contract at no extra cost like Chlorine Consumption register,TDS/PPM OF Chlorine register, register of preventive maintenance of equipment as per the the format given by MES. In case of non- compliance of the each record a recovery @ Rs. 1000.00 will be affected. (f) In case of absence of the any tradesman a recovery will be affected double of the minimum fair wages applicable for the relevant category or double the quoted rate whichever is high. (g) If the area is not maintained neat and clean recovery of Rs. 1000/- per month will be recovered. (h) Non maintaining of the log sheet daily, market Recovery of Rs. 1000/- per month will be recovered. (j) All the tradesmen deployed will be insured for accidental insurance as per the standing rule by the Government of India. No tradesmanwill be allowed deployed on installation without accidental insurance. (k) The contractor will maintain the First Aid Box. In case of non- compliance a recovery @ Rs. 1000.00 will be affected for each installation.
Note applicable to Ser item No 1 & 2 above: - (l) Full body protective Clothes will be provided to each tradesmen by the contractor, cost of which deemed to be included in the quoted rates, In case of non- compliance a Recovery @ Rs. 2000.00 per person will be affected. (m) The Electrician/FGM will maintain the Daily log sheet and other documents required to be maintained in the installation and as directed by Engineer-in-Charge and will be signed by the JE (E/M) daily. (n) For water supply, TDS/PPM of chlorine register will be maintained and signed by the Medical authorities daily. (o) Contractor has to provide chlorine Test kit. T&P for repairs and day to day complaints of external water supply & minor repairs for pumps starters motors are deemed to be included, In case of non- compliance a recovery @ Rs. 1000.00 will be affected for each record and each installation. (p) Necessary reliver for trademan rest will be responsibility of contractor (q) Necessery working tools and safety equipments like hands glaves, safety belts,shoues and helmets etc as required to carry out work will be provided by contractor In case of non- compliance a Recovery @ Rs. 4000.00 per shift per installation will be affected
Notes applicable for srl item No 1.00 and 2.00 above The Government of India vide their notification No F.No. 1/36(3)/2019-LS-II dt 23 Sep 2019 has notified minimum fair wages to be paid to the labour. The rate analysis has been done on minimum fair wages. A list of points to be kept under consideration while quoting rates is also provided at schedule 'A' notes here-in-before. It shall also be noted that this contract is guided by the Payment of wages Act- 1936 (revised upto date) and other Acts and laws governing engagement of contacts labour as applicable for the state of location of the work. The rate analysis has been based on above criteria. If the contractor quotes rates less than the reasonable amount as worked out through market analysis then a fixed deposit of the difference amount rounded up to near one thousand i.e amount based on Rate Analysis - (minus) quoted rate will be deposited with the Accepting officer before acceptance of the contract. The amount so deposited shall be refunded back to the contractor after two years from the date of payment of the bill to the contractor subject of fulfillment of conditions laid down vide condition 67 of IAFW 2249, provided no dues is outstanding from the contractor in terms of conditions of the contract and the contractor has furnished a No claim demand certificate on IAFA-451. The department shall be entitled to utilize the amount so deposited for making any established under payment / non payment of wages to the worksmen directly under intimation to the contractor in the event of the failure of the contractor to clear such dues within a period of 20 days from the date of providing intimation by the department through post as well as digital media (whattsapp message/e mail).
BRIJ MOHAN LAL AND CO.
Singh Associates
KRISHANA ELECTRIC WORKS
GARG CONSTRUCTION CO
Parveen Builders
H.B. Traders
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .