Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical R O CHUCHOT GONGMA | POONCH | JAMMU AND KASHMIR | 185101 | Accepted-Technical Admitted |
| 2 | Accepted-Technical CHUCHOT GONGMA | Accepted-Technical Admitted |
| 3 | Accepted-Technical | Accepted-Technical Admitted |
| 4 | Accepted-Technical | Accepted-Technical Admitted |
| 5 | Accepted-Technical | Accepted-Technical Admitted |
Tender Value
₹42.0 L
EMD Value
₹84,060
Closing Date
15 Jul 2026, 4:00 pmClosed
Executive Engineer Igoo Phey Division Leh
Executive Engineer Igoo Phey Division Leh
Improvement of Igoo Phey Canal by way of strengthening of main canal and distributor channels including pitching and grouting extention of distrbutor channels cross drainage for Igoo Phey canal repairing by way of PCC lining at D16 and D17 Escape
2026_PWD_19162_3
E-Tender 04of IPD Leh of 2026-27
Open Tender
Civil Works - Others
Percentage
45 days
leh
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive Engineer Igoo Phey Division Leh
₹84,060
23 Jul 2026
4 Jul 2026
16 Jul 2026
5 Jul 2026
15 Jul 2026
5 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5min width or 10 sqm on plan), including dressing of sides and ramming of bottoms, liftupto1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m. All kinds of soil. | 567 | Cum | 278.09 | ₹1,57,677.03 |
| 2 | Demolishingcementconcretemanually/bymechanicalmeansincludingdisposalof material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 52.8 | Cum | 1,673.01 | ₹88,334.93 |
| 3 | Dry stone pitching (any thickness) 1ncluding cost of stones. On Horizontal | 120 | Cum | 635.59 | ₹76,270.8 |
| 4 | Dry stone pitching (any thickness) including cost of stones. On Slopes | 307.5 | Cum | 724.02 | ₹2,22,636.15 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 gradedstone aggregate 20 mm nominal size derived from natural sources) | 417 | Cum | 6,606.08 | ₹27,54,735.36 |
| 6 | Carriage of materials from source to site of work. Cement an avg. lead 10 km. | 133.44 | MT | 241.38 | ₹32,209.75 |
| 7 | Sand an avg. lead 10 km. | 187.65 | Cum | 271.52 | ₹50,950.73 |
| 8 | Aggreagte an avg. lead 05 km. | 358.62 | Cum | 218.63 | ₹78,405.09 |
| 9 | Stone an avg. lead 05 km. | 427.5 | Cum | 236.64 | ₹1,01,163.6 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_45632.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .