Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.4 LAccepted-AOC | ₹44.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹44.4 LRejected-AOC SELLIYAEEPALAYAM NAMAKKAL | NAMAKKAL | NAMAKKAL | TAMIL NADU | ₹44.4 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Vigneshwaran L2 | Sri Palani Murugan Enterprises L1 |
|---|---|---|---|---|---|
| 1.00Strengthening to the road from Thirumalaipatti Kaspa - Kaspa AD Mayanam road Km 0/0-1/0 (R - 344) H/O Thirumalaipatti | |||||
| 2.00 | Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers. | 960 | Sqm | 6.36 ₹6,105.60 | 5 ₹4,800 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 1,250 | Sqm | 23.36 ₹29,200 | 23.36 ₹29,200 |
| 4.00 | Earth work excavation and depositing on bank with intial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales, moorums and ordinary gravelly soil etc. as per SS 20 A | 300 | Cum | 131.89 ₹39,567 | 131.89 ₹39,567 |
| 5.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 262.2 | Cum | 341.29 ₹89,486.24 | 341.29 ₹89,486.24 |
| 6.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 | 375 | Cum | 2,492.54 ₹9.3 L | 2,492.54 ₹9.3 L |
| 7.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 375 | Cum | 2,558.05 ₹9.6 L | 2,558.05 ₹9.6 L |
| 8.00 | Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 3,750 | Sqm | 87.54 ₹3.3 L | 87.54 ₹3.3 L |
| 9.00 | Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 3,750 | Sqm | 20.61 ₹77,287.50 | 20.61 ₹77,287.50 |
| 10.00 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials etc | 93.75 | Sqm | 11,911.67 ₹11.2 L | 11,911.67 ₹11.2 L |
Tender Value
₹45.0 L
EMD Value
₹45,040
Closing Date
21 Feb 2026, 3:00 pmClosed
Block Development Officer (VP), Panchayat Union Of
Block Development Officer (VP), Panchayat Union Office , Puduchatram
Strengthening to the road from Thirumalaipatti Kaspha- KasphaAD mayanam road 0/0 to 1/0 (R 344) under 14th CFC 2025-26 Scheme of Puduchatram Block
2026_RDTN_658593_1
183/2026/T1/16.02.2026/PCM6/VP
Open Tender
Civil Works
Puduchatram
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹45,040
Yes
11 Mar 2026
16 Feb 2026
21 Feb 2026
16 Feb 2026
21 Feb 2026
16 Feb 2026
Strengthening to the road from Thirumalaipatti Kaspa - Kaspa AD Mayanam road Km 0/0-1/0 (R - 344) H/O Thirumalaipatti
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation and depositing on bank with intial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales, moorums and ordinary gravelly soil etc. as per SS 20 A
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials etc
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface - Providing and Laying of hot applied Thermoplastic Compound 2.5mm thick including relectorising glass beads @ 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC : 35. The finished surface to be level, uniform and free streaks and holes etc complete as per MORTH & H specification Nos. 803. (Excluding GST)
Providing Hm stones
Providing KM Stone
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_790097.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_790097.xls
BOQ • 0.28 MB
KasphaTechVP.pdf
Tender Documents • 1.14 MB
Download all tender documents and submit your bid