Loading…
Loading…
| # | Schedule | Awarded To | Bids | Value |
|---|---|---|---|---|
| 1 | Schedule 1 | Not yet disclosed by govt. | 5 | - |
| 2 | Schedule 2 | Not yet disclosed by govt. | 5 | - |
Updated dates
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
14 May 2026, 10:00 amClosed
# 01-TUBULAR SHAFT ASSEMBLY COMPLETE WITH FABRICATION AND MACHINING AS PER ANNEXURE-I
# 02- TOP OIL RETAINER ASSY COMPLETE WITH FABRICATION AND MACHINING AS PER ANNEXURE-I
9259307
GEM/2026/B/7477089
Two Packet Bid
# 01-TUBULAR SHAFT ASSEMBLY COMPLETE WITH FABRICATION AND MACHINING AS PER ANNEXURE-I,# 02-TOP OIL
Bhopal, Madhya Pradesh
Item wise evaluation
PRODUCT_CUSTOM
1 document required · 1 mandatory
| Item | Delivery Location | Qty | Delivery | Spec |
|---|---|---|---|---|
| # 01-TUBULAR SHAFT ASSEMBLY COMPLETE WITH FABRICATION AND MACHINING AS PER ANNEXURE-I | Saurabh Kumar Sinha PO IL RETA prarambh हहोोननेेककततााररखख ससेेददननककससंंययाामम /Quanti betostart completed 462022,BHARAT HEAVY afterby ELECTRICALLTD, PIPLANI IN ER ASSY CO MPLETE WITH FA BR ICA TIO NA ND MA CH IN IN GA SPER | 1 | 150 days | |
| # 02- TOP OIL RETAINER ASSY COMPLETE WITH FABRICATION AND MACHINING AS PER ANNEXURE-I | Saurabh Kumar Sinha prarambh हहोोननेेककततााररखख ससेेददननककससंंययाामम /Quanti be 462022,BHARAT HEAVY tostart completed ELECTRICALLTD, PIPLANI afterby | 2 | 120 days |
Exempted
Yes
11 May 2026
25 Apr 2026
14 May 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9259307.pdf
GEM_BID • 0.14 MB
bidding_docs_2026-04-25-15-32-36_c6962df5e429f13262c32012c35c7fc3.pdf
GEM_SPEC • 14.38 MB
bidding_docs_2026-04-25-15-37-00_5563065606805c041dc0177ce0c5a16d.pdf
GEM_SPEC • 14.38 MB
suvidha.pdf
GEM_OTHER • 0.02 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid