Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-AOC | L1 | Accepted-AOC Tender Accepted | |
| 2 | L2₹10.7 L+₹3.3 L (44.9%)Rejected-AOC | L2 | Rejected-AOC L2 Bidder |
Tender Value
₹7.3 L
EMD Value
₹7,300
Closing Date
28 Sept 2020, 2:00 pmClosed
SE/ES
Superintending Engineer-Electrical Systems- Tuticorin Thermal Power Station-Tuticorin
Maintenance of Control panels of EAST Hitachi Upgraded DCS HIACS 5000M Pro Control Turbodem 9020 HP Bypass PRDS and STC of Unit IV and V and maintenance of various Transmitters and Switches in Units IV and V Boiler and Turbine areas
2020_EB_179143_1
SE/ES/TTPS/160/2020-21
Open Tender
Electrical Works
Item Rate
180 days
TTPS
As per BQR conditions in NIT
6 documents required · 6 mandatory
₹0
₹7,300
Yes
17 Mar 2021
12 Sept 2020
29 Sept 2020
12 Sept 2020
28 Sept 2020
12 Sept 2020
Maintenance (Cleaning and signal termination checking) of Control panels of EAST, Pro Control, , Hitachi Upgraded DCS HIACS 5000M,Turbodem, 9020, HP Bypass, PRDS and STC in Units IV&V Control Rooms.
Maintenance (Cleaning and checking of signal terminations and process connections) of various pressure, temperature, flow and level transmitters & allied with Junction boxes in Units IV & V Boiler & Turbine Areas.
Maintenance (Cleaning and checking of signal terminations and process connections) of various pressure, temperature, flow and level switches in Units IV & V Boiler & Turbine Areas.
SRI AYYAPPAN ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .