Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.5 LAccepted-AOC | L1 | Accepted-AOC 1st Lowest | |
| 2 | L2₹40.4 L+₹3.9 L (10.7%)Rejected-Finance SWAGAT CO OP HSG SOCIETY LTD 22 303 CHAITANYA SHIVAJI RAJE COMPLEX MHADA COMPLEX OPP EKA NAGAR KANDIVALI W MUMBAI 400 067 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400067 | L2 | Rejected-Finance Being 2nd Lowest | |
| 3 | L3₹40.5 L+₹3.9 L (10.8%)Rejected-Finance | L3 | Rejected-Finance Being 3rd Lowest |
Tender Value
₹25.4 L
EMD Value
₹50,872
Closing Date
4 Jan 2020, 6:00 pmClosed
CWE Karanja
CWE Karanja Naval Station Karanja Uran Dist Raigad
PROVISION OF AIR CONDITIONING FOR WORKSHOP OF TAL TARPEDO AT NAD KARANJA
2019_MES_308395_1
83967-K/E8
Limited
Miscellaneous Works
Item Rate
180 days
Naval Station Karanja
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Yes
CWE Karanja
₹50,872
Yes
27 Apr 2020
21 Dec 2019
6 Jan 2020
21 Dec 2019
4 Jan 2020
28 Dec 2019
Amount
Designing, supplying, installing, testing and commissioning of chilled water type central air conditioning plant of capacity 22 TR (Approx)- 11 TR (02 No working and 01 No standby) with all equipments and accessories complete and comprising of the followng to maintain inside condition :-
Temperature: 23+/- 2 degree celsius RH : 60+/-5 % Air Change : 02/hr Dust Level : 25 Micron maximum at 85 % efficiency Operation : 24 hrs Equipment load : 10 KW Internal lighting load : 1.8 KW (except EOT) Occupancy : 12 persons
(a) Three Nos of water cooled chiller unit factory assembled micro processor controlled each with 50% of full load coilling capacity complete and make Blue star model No. XWC2S-011R2 are equivalent in Daikin/Hitachi/Carrier comprising of the following:-
(i) Three Nos scroll compressor hermatically sealed units using R - 407C refrigerant complete with suction and discharge shut off valves, automatic capacity control with the thermostats and solenoid valves, built in suction strainer, oil pump, hot gas muffler, heat wheel, oil pressure, safety switch etc all as specified.
(ii) Three Nos shell and tube type water cooled condenser MS Shell and integrally finned copper tubes complete with safety valve, drain valve, water inlet and out valves, hot gas inlet and liquid outlet isolating valves, thermometer and pressure gauges at water inlet/outlet and purge valve all as specified.
(iii) Three Nos shell and tube type DX chiller with thermal insulation, temperature of water entering the chiller 12 deg C, temperature of water leaving of the chiller 7 deg C, including refrigerant inlet and outlet connections with isolating valves, expansion valves, water inlet and outlet valves, temperature and pressure gauges at water inlet and outlet, drain and vent, stop valves complete all as specified..
(iv) Three Nos stands fabricated out of MS channel/angle of suitable size for mounting compressor, motor, and condenser.
(v) Three set of neoprene rubber anti-vibration ribbed pads with MS channel in foundation etc complete as per manufacturer's instructions for installation of the plant
(vi) Necessary mild steel heavy duty refrigerant piping for suction and discharge lines and copper piping for liquid line complete with fittings valves etc
(vii) First charge of R - 407C refrigerant and Compressor oil for the complete plant.
(viii) Bright annealed copper heavy duty refrigerant piping for suction, discharge and liquid line compete with fitting valves. suction line should be insulated
(b) Condenser water cooling aarangement comprising of the following :-
(i) Three Nos EEC Series (Engery efficient) monoblock centrifugal condenser cooling water pumping sets of suitable capacity not less than 2HP Make : Kirloskar/Becon/Armstrong/Grandfuss to achieve desired dishcarge and head alongwith necessary valves in suction and delivery line each of 50% capacity (02 Nos working and 01 Nos Standby) and suitable for operation on 3 phase 50 cycles, 415 volts AC supply along with hydraulic vane type water meter for flow measurement and providing a pressure gauge in each pump set of suitable capacity including suitablefoundaiton with neoprene rubber anti vibration ribbed pads all as specified
(ii) One No corrosion resistant, fire retardant, FRP induced draft, rectangular type counter flow cooling tower of capacity 28 TR make advance/ mihir/pharapur/polo/delta of capacity 120% of plant running capacity with maximum allowable temperature 50 degree centigrade, drift loss 0.005% of water circulation of star with suitable foundation and float valve of suitable size and make up PVC three layered, closed lid, cylindrical shaped, ISI marked water tank of not less than 5000 Ltrs capacity, (of Syntex Company ) mounted on suitable stagging as specified
(iii) One lot of condenser water piping as per IS-1239 from make up tank to cooling tower, from cooling tower to condenser and return complete with fittings, valves, pot strainers etc.
(c) Chilled water circulation arrangement comprising of the following :-
(i) Three Nos monoblock centrifugal pumpsets not less than 2HP of make Kirloskar/Becon/Armstrong/ grandfuss for circulating chilled water alongwith necessary valves in suction and delevery line each of 50% capacity (02 Nos working and 01 Nos Standby) and suitable for operation on 3 phase 50 cycles, 415 volts AC supply, along with one number pressure gauge in each pump set of suitable capacity including suitable foundation with neoprene rubber anti-vibration ribbed pads all as specified.
(ii) Chilled water piping :- (a) A lot of galvanised iron, heavy grade , classic, ISI marked pipe of with all fittings such as bends, elbow, tees, reducers, tees supports, flow indicators etc of suitable sizes as per site requirement to maintain the continuous and constant flow of chilled water from chiller unit to AHUs so that designed conditions can be met with.The chilled water pipe line network shall be laid under ground , above ground, floor, roof, a long wall etc. chilled water pipe line shall be insulated with EPS section of 50mm thickness with and including applying bitumenous compound and AL cladding with 27 gauge AL sheet to avoid the heatloss including water pipe line. Bidder shall ensure the quality of line insulation and adequate insulation be provided so that chilled water temperature of 8-9Degree celcius can be maintained at AHUs inlet point. (b) A lot of butter fly valve, gate valve, sluice valve in chilled piping network to maintain required flow in each branch line as per approved layout diagram.
(iii) Condensate water drain piping with GI pipe-B class conforming to IS:1239 of suitable size including all fittings like anchor fasteners, couplings, bends, elbows, tees, thrust, blocks, wooden blocks, flanges, welding as required including insulation as specified.
(iv) Chilled water make up ISI marked, three layered, closed lid, cylindrical shaped tank of syntex company having capacity of not less than1000 ltrs and thermally insulated with 50 mm thick EPS TF quality sheet of suitable sizes having density not less than 65 Kg/ Cu.m , thermal conductiivity 0.334 w /MK at '0' degree centigrade of make : Beard Sell or equivalent in Mag Hard insulator/ Zenith/ Modi with protecting covering of 25 gauge aluminium cladding and supporting piping connections, valves, fittings etc all as directed and specified..
(d) One Nos Air handling unit of make Nutech/Zeco/edgetech/Citizen 6000 CFM ,static pressur 50mm WG suitable capacity with chiller unit of sectionalised construction, factory made double skinned six row deep cooling coil and 50 mm TSP complete with all accessories controls etc as per OEM specifications and comprising :-
(i) Cooling coils of copper tube with aluminium fins.
(ii) Prefilter, plenum and fire dampers in the supply air duct.
(iii) Blowers for AHU complete with suitable electric motor, TEFC squiral cage induction motors for operation on 415 Volt, 3 phase, AC supply, with V Belt and belts guard
i(v) Insulation of AHUs all as specified.
(e) 01 Lot of air distribution system comprising of supply air ducts from AHU to all conditioned space and return air duct as per site requirement from conditioned space to AHU's etc including providing insulation to avoide condensation and effective designed condition in air conditioned space of all building including interconnectors as required from AHU to the conditioned space comprising of class VIII galvanised sheet with suitable supporting arrangements and bracing, supply / return/ fresh air grilles on sheet metal frame work duly painted /finished to match with the exisiting ceiling. Fire dampers operated with fusiable link shall be porvided. Note :- For Bldg no 361
(f) AHU Control panel - one Nos cubical wall mounted, indoor LT panel, dust and vermin proof factory fabricated, CPRI approved, made out of not less than 2 mm thick CRCA sheet and 50 x 50 x 6 mm angle iron frame, powder coated, suitable for operation on 3 phase 50 Hz, 415 volts, including internal wiring with 1100 volts grade single core, PVC insulated, FRLS, multistranded copper conductor cables of suitable current carrying capacity complete and comprising of the following accessories :-
(i) One set of 200 Amps rated copper bus bar suitable for 3 phase 4 wire, 415 volts mounted on PVC/ hygroscopic insulators and PVC colour coded Sleeves of R,Y, B and green colour complete arranged in separate compartment. -01 set.
(ii) Incoming MCCB, 4P, 63 Amps, 16 KA at 415 Volts with thermal magnetic release and adjustable overload (70% to 100%) - 01 No
(iii) Outgoing MCCB, TP, 40 Amps, 10 KA, 415 volts with thermal magnetic release and adjustable overload (70% to 100%) - 01 Nos (Spare)
(iv) Outgoing MCCB, TP, 40 Amps, 10 KA, 415 Volts - 01 No with thermal magnetic release and adjustable overload 70% to 100%) (For AHU motor)
(v) LED Phase indicating lamps RYB - 01 Set for each outgoing and incoming connection
(vii) Single phase preventor for motors.
NOTE:- (i) Any civil work involved in installation of panel board deemed to be included in item rate. (ii) The Contractor shall submit the constructional / general arrangement drawing for approval of accepting officer. (iii) Engineer- in- Charge shall ensure that panel shall be manufactured as per approved drawing only. Contractor shall arrange inspection for panel at factory premises before dispatch. The inspection shall be carried out by the nominated representative of Accepting Officer.
(g) Main Contorl Pannel :-Job each - 01 Supplying, fixing, testing and commissioning, cubical, floor mounted, indoor, LT panel, CPRI approved dust and vermin proof factory fabricated, made out of not less than 2 mm thick CRCA sheet , powder coated, suitable for operation on 3 phase 50 Hz, 415 volts, including internal wiring with 1100 volts grade single core, PVC insulated, FRLS, multistranded copper conductor cables of suitable current carrying capacity complete and comprising of the following accessories
(i) One set of 300Amps rated copper bus bar suitable for 3 phase, 4 wire, 415 volts system mounted on PVC/ hygroscopic insulators and PVC colour coaded sleeves of R, Y, B and green colour, complete arranged in seperate compartment - 01 Set
(ii) Incoming MCCB 200 Amps, FP, 415 Volts 25 KA with micro prosess release - 01 No.
(iii) Outgoing, MCCB TP, 80 Amps, 10 kA at 415 Volts with thermal magnectic release and adjustable overload (70 % to 100 %) - 03 Nos (For Compressor)
(iv) Outgoing MCCB TP, 20 Amps, 10 kA at 415 Volts with thermal magnetic release and adjustable overload (70% to 100 %) -09 Nos (For CT Fan motor and condensor pumps, chiller pumps).
(v) Outgoing MCCB TP, 63 Amps, 10 KA at 415 Volts with thermal magnetic release and adjustable overload - 02 No (For AHU control panel)
(vi) Outgoing MCCB TP, 32 Amps, 10 KA at 415 Volts with thermal magnetic release and adjustable overload - 01 No (For Hot water generator)
(viii) Digital KWH (Energy) meter, Tamper proof, 3 phase, 415 Volts, 50Hz, CT operated of not less than 400 Amps Capacity - 01 No.
(ix) Phase indicating lamps RYB for incoming and each outgoing circuit connection
(xi) Fully automatic, star-delta starter / DOL Starter having protection against single phasing, under voltage, overvoltage, short circuit current for all motors.
NOTE : - (i) Main LT pannel shall be installed in AC plant Room. (ii) The provision of inter locking wiring between compressor motor, condenser pump, AHU, cooling tower, chiller pumps, thermostate, solenoid switch shall be provided. (iii) The electric connections from main LT pannel to each devices such as motors, AHU, compressor etc shall be proviced by XLPE insulated, multistranded , 1100 volts grade copper conductor cable of adequate sizes. The cables shall run over the cable tray made of GI sheet of not less than 1.6 mm thick provided with fasteners, hangers etc as per the engr-in-charge directions . (iv) LT pannel shall be compartmentalised comprising of cable gallaries, busbar chamber, compartment for each MCCB/MCB/ Starter etc duly marked with connected machineries etc.
(v) Any civil work involved in installation of panel board deemed to be included in item rate.
(vi) Engineer- in- Charge shall ensure that panel shall be manufactured as per approved drawing only. Contractor shall arrange inspection for panel at factory premises before dispatch. The inspection shall be carried out by the nominated representative of GE
(vii) The Contractor shall submit the constructional / general arrangement drawing for approval of GE
(j ) Masonary work connected with the installation of plant, excavation for laying of pipe line, foundation for cooling tower and other equipments, cutting holes and making good the same etc.
(k) Controls and instruments such as thermostats, humidistats, airstats solenoid valves etc for fully automatic operation of the plant.
(l) Digital temperature and RH measuring sensor and RH & temperature control shall be installed in AHU room and all rooms. The RH and temperature control shall ensure fully automatic operation of compressors and loading / undloading. The entire system shall be of Make : Honeywell / Forbes Marshal. The LCD display panel showing Temperature and Humiditywith control wiring and switches of all buildings shall be installed in AC Plant room.
(m) Any other connected work not mentioned above but considered necessary for maintaining the designed conditions of all buildings successful installation, commissioning and operation and efficient performance of the plant are deemed to be included into scope of work and quoted rates.
(n) By pass valve of make siemens/ ABB shall be provided with each AHU to by pass the chilled water circulation on attaining the desired temperature in the conditioned space.
(h) M & L for earthing complete, with GI earth plate electrode of size 60cm x 60 cm x 6mm thick burried directly in ground (earth pit not less than 2.25 m deep below ground level) with top edge of the plate not less than 1.5m below the normal ground level connected with GI Strip 32 x 6mm by means of bolts, nuts, check nuts and washers of galvanished iron steel including necessary excavation and earth work in any type of soil , removing surplus soil to a distance not exc 50, with and including PCC chamber in PCC (1:2:4), type B1, using (20mm graded stone aggregate), having outer dimensions 60 cm X 60 cm X 60 cm and internal dimensions 30 cm X 30 cm X 30 cm, "mild steel angle iron frame" made out of MS angle iron of size 40 x 40 x 6mm thick duly painted with two coats of synthetic enamel paint over one coat of red oxide zinc chrome primer hinged with an including 10 mm thick CI cover with handle, watering arrangment with funnel internally secured with wire mesh with 20 mm dia medium grade pipe for watering, 40 mm dia light grade, GI pipe for lead protection form electrode to Test Point/ Pannels/ accessories in & including alternate layers of charcoal dust and common salt complete all as shown in electrical " Plate No 3" and connected and indicated including testing on completion
Supply ,install ,commissioing and testing hot water generator 15 KW(in two steps) with suitable water flow rate and working pressure consting of shell made of MS sheet 08mm thickness and 10mm thick dish ends with 50mm thick resin bonded fiber glass wool insulastion (32 kg density) with aluminium sheet cladding having water resistance immersion type heaters(copper tube chromium plated) including step controller thermometer pressure gauges with ball valve pressure relife valve low level cutout autovent etc . capable of withstanding pressure of 250psi complete all as specified and directed.
Manning and operation of chilled water type central AC plants(01 No Bldg No 361) installed against BOQ Item no 1.0 for a period of 11 months after satisfactory completion of phase I test of central AC plant in three shifts with one operator in each shift for the AC Plant i.e 0600Hrs to 1400 Hrs,1400Hrs to 2200 Hrs and 2200 Hrs to 0600 Hrs round the clock for all days including sunday and holidays etc. all as specified and as directed by GE and Engineer-in-Charge.
(a) First year (11 months after completion of phase I test)
NOTE FOR ITEM NO 04
(a) Rates quoted ubder col 6 for sl no 4 shall be for manning and operation complete unless mentioned otherwise.
(b) The contractor shall be responsible for periodical maintenance as per maintenance schedule attached and specified including renewal/replacement of parts fitting fixture filling of refrigerant gas etc required for smooth functioning of the plants as per manufacture's instruction.
(c) Maintenance of log sheet and all maintenance record shall be responsibility of contractor and no stationary shall be provided by Department. Format of log sheet and maintenance records etc shall be decided by GE/Engineer-in-Charge
(d)The contractor shall ensured the neat and cleanliness of all equipments installed within the premises and surrounding of AC plant room, cooling tower, water tanks, ducting, AHU rooms etc.
(e) Manning and operation of central AC plant shall be carried out round the clock in three shifts each 08 Hrs through the ITI in Ref & air conditioning qualified tradesman and the tradesman shall be in proper uniform all as directed by Engr-in-charge.
(f ) During the defect liability period, the payment of manning and operation of AC plant shall be made and comprehensive maintenance part shall be covered into the quoted rate of central AC plant (installation work) being within the defect liability period. The contractor shall keep the personnel on installation with such qualification who can carryout the preventive/routine/breakdown maintenance.
cooltech engineering services
BRITE INDUSTRIES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_345714.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .