Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹5.6 LAccepted-AOC | l1 | Accepted-AOC a | |
| 2 | l2₹6.2 L+₹62,955.98 (11.2%)Rejected-AOC | l2 | Rejected-AOC a | |
| 3 | l3₹6.4 L+₹74,522.30 (13.3%)Rejected-AOC VILLAGE DHABKI GUJJAR DISTT SAHARANPUR UTTAR PRADESH | SAHARANPUR | UTTAR PRADESH | 247001 | l3 | Rejected-AOC a |
| Sl No | Description | Qty | Unit | M/S ANIL CEMENT AGENCY L2 | M/S SHIV GORAKH CONSTRUCTION L3 | M/S BHOOP SINGH TRADERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Uprooting jhunds. | 1,176 | NOS | 33.12 ₹38,949.12 | 33.3 ₹39,160.8 | 30 ₹35,280 Lowest |
| 2.00 | Silt Clearance/trench digging including lift upto 1.50m. and lead upto 6m. Including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc. but excluding levelling, dressing & compaction. | 7,081 | CUM | 42.32 ₹2,99,667.92 | 42.5 ₹3,00,942.5 | 35 ₹2,47,835 Lowest |
| 3.00 | Scrapping of internal section of Existing channel i.c Bed & slope with silt upto 5cm. | 64,782 | sqm | 4.05 ₹2,62,237.54 | 4.2 ₹2,72,084.4 | 4 ₹2,59,128 Lowest |
| 4.00 | Video Graphy/Photography of Silt Clearance works in canal and drains before & after Silt clearance by DRONE as per requirement including supply of Videography/Photography in Pen Drive and vehicles for movement as per direction of Engineer-in-charge. | 13.8 | PER KM | 1,288 ₹17,774.4 | 1,302 ₹17,967.6 | 1,050 ₹14,490 Lowest |
| 5.00 | Painting & Letter Writing on Old Iron Sign Board i/c all cost of material, labour, T & P etc. | 1 | NOS | 5,060 ₹5,060 | 5,100 ₹5,100 | 4,000 ₹4,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹68,000
Closing Date
27 Apr 2026, 11:00 amClosed
EE LOWER DIVISION YAMUNA CANAL SHAMLI
EE LOWER DIVISION YAMUNA CANAL OFFICE SHAMLI.
SILT CLEARANCE OF KURTHAL DY. FROM KM. 0.000 TO KM. 13.800.
2026_UPIDC_1138220_1
2966/T-1/2026-27/DT. 04-04-2026
Open Tender
Civil Works - Canal
Item Rate
20 days
SHAMLI
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹68,000
20 May 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting jhunds. | - | NOS | - | - |
| 2 | Silt Clearance/trench digging including lift upto 1.50m. and lead upto 6m. Including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc. but excluding levelling, dressing & compaction. | - | CUM | - | - |
| 3 | Scrapping of internal section of Existing channel i.c Bed & slope with silt upto 5cm. | - | sqm | - | - |
| 4 | Video Graphy/Photography of Silt Clearance works in canal and drains before & after Silt clearance by DRONE as per requirement including supply of Videography/Photography in Pen Drive and vehicles for movement as per direction of Engineer-in-charge. | - | PER KM | - | - |
| 5 | Painting & Letter Writing on Old Iron Sign Board i/c all cost of material, labour, T & P etc. | - | NOS | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.84 MB
BOQ_2125291.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .