| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.5 LAdmitted-Finance | -8.99% | ₹14.5 L | L1 | Admitted-Finance |
| 2 | L2₹15.4 L+₹90,361.90 (6.22%)Admitted-Finance | -3.33% | ₹15.4 L+₹90,361.90 (6.22%) | L2 | Admitted-Finance |
| 3 | L3₹15.5 L+₹93,874.20 (6.46%)Admitted-Finance | -3.11% | ₹15.5 L+₹93,874.20 (6.46%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-Submitted Document Not as per NIT Conditions |
Tender Value
₹16.0 L
EMD Value
₹31,940
Closing Date
25 May 2026, 6:00 pmClosed
EO MB BANERA
EO MB BANERA
Construction work of Boundary wall and wire fencing work at Ambedkar Bhawan which is situated at near of Kanchan Gate in the municipality area Banera.
2026_DLB_557461_2
NPB/NIRMA/2026-27/135
Open Tender
Civil Works
Percentage
365 days
EO MB BANERA
Refer Tender Notice
3 documents required · 3 mandatory
₹1,000
Tender Fee EMD EO Banera/Pro. Fee MDRISL Jaipur
₹31,940
Yes
2 Jun 2026
9 May 2026
26 May 2026
9 May 2026
25 May 2026
9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt,clay, black cotton soil, kankar, etc.Depth upto 1.5 m | 200 | Cum | 229.5 | ₹45,900 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:5:10 (1 cement : 5 fine/ coarse sand : 10 graded stone aggregate 40 mm nominal size) | 15 | Cum | 4,330 | ₹64,950 |
| 3 | providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 nominal size) | 20 | Cum | 5,510 | ₹1,10,200 |
| 4 | Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) | 15 | Cum | 6,300 | ₹94,500 |
| 5 | Half brick masonry with FPS bricks of class designation 75 in superstructure above plinth level upto two stories.Cement mortar 1:4 (1 cement :4 coarse sand) | 25 | Sqm | 767 | ₹19,175 |
| 6 | Random rubble masonry with hard stone in foundation and plinth Cement mortar 1:6 (1 cement : 6 coarse sand) | 90 | Cum | 4,860 | ₹4,37,400 |
| 7 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:6 (1 cement : 6 fine/ coarse sand) | 200 | Sqm | 294.5 | ₹58,900 |
| 8 | G.I Barbed Wire Fencing 1.8 m high Providing and fixing 1.8 m high GI barbed wire fencing with 2.4 m RCC M15 grade 150 mm x 150 mm concrete post placed every 3 m centre-to-centre founded in M15 grade cement concrete, 0.6 m below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 12 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckles etc. complete as per MoRTH Specification Clause 808. | 190 | Rmt | 561 | ₹1,06,590 |
| 9 | Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm). | 340 | Sqm | 144 | ₹48,960 |
| 10 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 3,950 | kg | 144.5 | ₹5,70,775 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_992469.xls
BOQ • 5.15 MB
CorrigendumNPBNIT03.pdf
PDF • 0.23 MB
CorrigendumNPBNIT03.pdf
PDF • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .