| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹69,230.68 (0.61%)Admitted-Finance | ₹1.1 Cr+₹69,230.68 (0.61%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SRIRAM L1 | K.SUBRAMANI L2 |
|---|---|---|---|---|---|
| 1.00Part 1 : Improvements to the road from S.P.Road Kuppandigoundenpatti road km 0/0-1/9 Estimate Amount Rs.42.52 Lakhs | |||||
| 2.00 | Clearingthe Scrub jungle including all labour charges for burrying and burning etc., | 2,736 | Sqm | 4.1 ₹11,217.6 Lowest | 5 ₹13,680 |
| 3.00 | Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305. | 2,280 | cum | 89.5 ₹2,04,060 Lowest | 91 ₹2,07,480 |
| 4.00 | Picking the old metal for the B.T Surface and sectioning the undulations and all compackting charges etc., complete. | 2,388.75 | Sqm | 15.31 ₹36,571.76 Lowest | 20 ₹47,775 |
| 5.00Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | |||||
| 6.00 | KM 0/0 - 1/9 | 342 | cum | 279.47 ₹95,578.74 Lowest | 279.47 ₹95,578.74 Lowest |
| 7.00Providing and laying Water Bound Macadam Grading - II(75mm to 22.40mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm | |||||
| 8.00 | KM 0/0 - 1/0 | 84.38 | cum | 2,174.05 ₹1,83,446.34 Lowest | 2,174.05 ₹1,83,446.34 Lowest |
| 9.00Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm | |||||
| 10.00 | KM 0/0 - 1/0 Bell mouth | 284.35 | cum | 2,500.86 ₹7,11,119.54 Lowest | 2,500.86 ₹7,11,119.54 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
27 Nov 2020, 3:00 pmClosed
THE PROJECT DIRECTOR DRDA, DINDIGUL
THE PROJECT DIRECTOR DRDA, DINDIGUL
Dindigul District TNRRIS 2020-2021 Additional - Road works Natham block TN-05-36
2020_RDTN_184628_1
DIPR/4102/TENDER/2020 TN-05-36 Natham Block
Open Tender
Civil Works - Roads
Item Rate
180 days
DINDIGUL
Dindigul District TNRRIS 2020-2021 Additional - Road works Natham block TN-05-36
5 documents required · 5 mandatory
₹0
₹1.1 L
THE PROJECT DIRECTOR DRDA, DINDIGUL
17 Dec 2020
9 Nov 2020
27 Nov 2020
9 Nov 2020
27 Nov 2020
9 Nov 2020
20 Nov 2020
Amount
Part 1 : Improvements to the road from S.P.Road Kuppandigoundenpatti road km 0/0-1/9 Estimate Amount Rs.42.52 Lakhs
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Picking the old metal for the B.T Surface and sectioning the undulations and all compackting charges etc., complete.
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying Water Bound Macadam Grading - II(75mm to 22.40mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
KM 0/0 - 1/0 Bell mouth
Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
KM 0/0 - 1/0 Bell mouth
Providing and laying premix carpet with seal coat type 'A' 20mm consolidated thickness using IRC size machine broken HBG metal 0.18 cum of 13.2mm and 0.09 cum 11.2mm with 14.60kg of 10 sqm for seal coat including cost and conveyance of all materials from approved quary to worksite and stacking them to departmental quaug for premeasurement including cost of bulk bitmen which will be supplied departmentlly at section store and the cost of which will be recovered at the rates as specified in the special condition appended here with and including conveyance of bulk bitmen to work spot handling charges for the same at both ends including labour charges for heating the bitmen to required quantity of metal and bitmen using mini hot mix plant conveying the mix by wheel borrows including labour charges for spreading the mix to greades, lines and profiles and consolitating with power rollar rolling etc.,
KM 0/0 - 1/0 Bell mouth
Supply of Kilometre stone of size 1.65m x 0.45 x 0.15m including all charges etc.,
Supply of Hectametre stone of size 0.90 x 0.15 x 0.15 metre
Provision for Name board
Provision for Sign board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 2 :Strengthening of the Road from Karuthalakkampatti to Kosukurichi Pudur km 0/0-1/47 Estimate Amount Rs.42.72 Lakhs
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying Water Bound Macadam Grading - II(75mm to 22.40mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
KM 0/0 - 1/0 Bell mouth
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
KM 0/0 - 1/0 Bell mouth
Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
KM 0/0 - 1/0 Bell mouth
Providing and laying premix carpet with seal coat type 'A' 20mm consolidated thickness using IRC size machine broken HBG metal 0.18 cum of 13.2mm and 0.09 cum 11.2mm with 14.60kg of 10 sqm for seal coat including cost and conveyance of all materials from approved quary to worksite and stacking them to departmental quaug for premeasurement including cost of bulk bitmen which will be supplied departmentlly at section store and the cost of which will be recovered at the rates as specified in the special condition appended here with and including conveyance of bulk bitmen to work spot handling charges for the same at both ends including labour charges for heating the bitmen to required quantity of metal and bitmen using mini hot mix plant conveying the mix by wheel borrows including labour charges for spreading the mix to greades, lines and profiles and consolitating with power rollar rolling etc.,
KM 0/0 - 1/0 Bell mouth
Supply of Kilometre stone of size 1.65m x 0.45 x 0.15m including all charges etc.,
Supply of Hectametre stone of size 0.90 x 0.15 x 0.15 metre
Provision for Name board
Provision for Sign board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 3 :Strengthening of the Road from Melamettupatti Road km 0/0-1/1 Estimate Amount Rs.29.66 Lakhs
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying Water Bound Macadam Grading - II(75mm to 22.40mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
KM 0/0 - 1/0 Bell mouth
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
KM 0/0 - 1/0 Bell mouth
Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
KM 0/0 - 1/0 Bell mouth
Providing and laying premix carpet with seal coat type 'A' 20mm consolidated thickness using IRC size machine broken HBG metal 0.18 cum of 13.2mm and 0.09 cum 11.2mm with 14.60kg of 10 sqm for seal coat including cost and conveyance of all materials from approved quary to worksite and stacking them to departmental quaug for premeasurement including cost of bulk bitmen which will be supplied departmentlly at section store and the cost of which will be recovered at the rates as specified in the special condition appended here with and including conveyance of bulk bitmen to work spot handling charges for the same at both ends including labour charges for heating the bitmen to required quantity of metal and bitmen using mini hot mix plant conveying the mix by wheel borrows including labour charges for spreading the mix to greades, lines and profiles and consolitating with power rollar rolling etc.,
KM 0/0 - 1/0 Bell mouth
Supply of Kilometre stone of size 1.65m x 0.45 x 0.15m including all charges etc.,
Supply of Hectametre stone of size 0.90 x 0.15 x 0.15 metre
Provision for Name board
Provision for Sign board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K.SUBRAMANI
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .