| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹5.9 L+₹93,395.38 (19.0%)Accepted-AOC | L2 | Accepted-AOC L2 | |
| 2 | L1₹4.9 LRejected-AOC | L1 | Rejected-AOC L1 | |
| 3 | L3₹6.2 L+₹1.3 L (25.7%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹6.9 L+₹2.0 L (40.5%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹7.8 L+₹2.8 L (57.7%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
₹4.1 L
EMD Value
₹10,300
Closing Date
3 Jul 2020, 5:00 pmClosed
Executive Officer MC Solan
Executive Officer MC Solan
Construction of Four Nos. Septic Tank at I.H.S.D.P. Project Chambaghat.
2020_UDDHP_38364_1
TEN(5)20/2019-2644-46,16/06/20
Open Tender
Civil Works
Item Rate
90 days
MC Solan
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Executive Officer MC Solan
₹10,300
7 May 2021
25 Jun 2020
4 Jul 2020
25 Jun 2020
3 Jul 2020
25 Jun 2020
Amount
Excavation in foundation trenches etc. in earth work, lift up to 1.5 mtrs. Stacking the excavated soil not more than 3 mtrs, clear from the edge of excavation and then returning the stacked soil from the edge of excavation and then returning the stacked soil in 15 cm. layers, when required into the plinth, sides of foundation etc. consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated earth as directed within a leads of 20 mtrs. In pick jumper work.
P/L C.C. 1:6:12 (1 cement: 6 sand: 12 graded stone aggregate 40 mm nominal size) mach. Mixed and curing complete including cost of form work in foundation and plinth.
Brick work using 2nd class common burnt clay building bricks in foundation and plinth in Cement mortar 1:6 (1 cement : 6 sand)
Half brick masonry in common burnt clay building bricks inCement Mortar 1:4 (1 cement : 4 sand) First Class Bricks
15 (Fifteen) millimeters thick cement plaster in single coat on the rough side of brick/concrete/ stone walls for interior plastering up to all heights including arises. Internal rounded angles, chamfers and/or rounded angles not exceeding 80 (Eighty) millimeters in girth and finished even and smooth in cement mortar 1:4 (One cement: Foursand)
Providing for work steel plates of 3.15 mm thick welded with angle iron in frames of 30 x 30 x 5 mm size so as to give a fair finish including centering, shuttering strutting and etc. with wooden battens and, heights of roofing and centering below supporting floor to ceiling not exceeding 4 mtrs. And removal of the same for an situ reinforced concrete and plain concrete work in:i) Flat surfaces such as soffits of suspended floors, roofs landing and the like floor etc. up to 200 mm in thickness.
Providing and laying cement concrete 1:1.5:3 (1 cement :1.5: Sand : 3 graded stone aggregate 20 mm nominal size and curing complete excluding cost of form work. suspended floor, roof, shelves and their supports, balconies, beams girder and bressumers and cantilever In all levels.
Providing tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position complete up to all floor levels/all heights.
Providing and fixing on wall face PVC (D-Plast) rain water pipes of working pressure not less than 4.5 kg/sqm including filling the joints withapproved adhesive complete. 110mm dia pipes
Construction chamber 300*300*500(Three hundred into Three hundred into Five hundred) inside size for stop cock with Cast Iron surface box 100*100*75 (One hundred into One hundred into Seventy Five) millimeters (inside) with hinged cover fixed in cement concrete slab 1:2:4 mix (One cement isto Two sand isto Four graded stone aggregate Twenty millimeters nominal size) 75 (Seventy Five) millimeters thick foundation concrete 1:5:10 ( One cement isto Five sand isto Ten grades stone aggregate forty millimeters nominal size) and inside plastering with cement mortar 1:3 (One cement isto Three sand) finished with a floating coat of neat cement including curing complete :- with 100 (One hundred) millimeters thick walls of brick masonry in cement mortar 1:5(One cement isto Five sand), as per HP.PWD specification, including carriage of all labour equipment and material to various location through all modes of transportation in all leads lifts and all incidental charges.
Cover of septick tank ( MR )
Cement concrete flooring 1:2:4 (1 cement : 2 sand:4 graded stone aggregate 20 mm nominal size)laid in one layer finished with a floating coat of neat Cement.50mm thick.
AP Associates
Prashant Kashyap
BHUPENDER SINGH THAKUR
Rahul Sharma
SHEDS EDUCATIONAL AND CHARITABLE TRUST
Anil Chauhan
Vikrant Sharma
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .