| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹8.2 Laccepted-aoc | ₹8.2 L | accepted-aoc |
Tender Value
₹10.2 L
EMD Value
₹26,000
Closing Date
18 Jul 2026, 10:30 pmClosed
Krishna Bhagya Jala Nigam Limited
Rajendra Rodagi
Earth work excavation for foundation filling off Murrum soil CNS soil for foundation CC40M10 Concrete reinforcement steel CC40M15 concreteNP-3 600mmdiaBackfilling
KBJNL/2026-27/CN/WORK_INDENT2967
KBJNL/2026-27/CN/WORK_INDENT2967
Open
Canals including Lining and Structures
Electronic Documents, First(One Cover)
KBJNL Division MLI Division No 2 Babaleshwara
6 documents required · 6 mandatory
₹500
₹26,000
18 Jul 2026
11 Jul 2026
14 Jul 2026
Name of Work- Construction of HR and CD works across Nala leading to Arjunagi Tank filling under at CH 102.00 KM of Malghan West Main Canal for the Year 2026-27
Iteam Estimated Qty Item of work Unit Section Rate Amount
1 306.16 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work in All kinds of soil depth upto 3.00m WRD SR Vol-IV Item No:1.14.1 Page No-08 Cum 102.00 31228.32
2 16.17 Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenanaces required to complete the work as per technical specifications using Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates. WRD SR Vol-IV Item No:2.1.2 Page No-15 Cum 5607.00 90665.19
3 1.796 Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Common SR Item No:2.1 Page No-18 tonne 80019.00 143714.12
4 65.68 Providing and laying insitu vibrated M-15grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials machinery, labour, cleaning, providing mortar layer for lift joints, batching,mixing,placing in position, levelling, vibrating, finishing, curing,wit all other ancillary operations complete. . WRD SR Vol-IV Item No:2.13 Cum 5989.00 393357.52
5 20.00 Supplying P-3 Class R.C.C spun pipes ( safe for 6 kg / cm2 test pressure ) to work spot including cost of all materials, machinery, labour, taxes, duties, levies, royalty & all necessary works as applicable as per specification. 600 mm dia P-3 Class R.C.C spun pipe WRD SR Vol-IV Item No:7.21.4 Page No-95 M 2712.00 54240.00
6 20.00 Laying and jointing P-2/P-3 class R.C.C spun pipes true to line and level with perfect linking at joint including loading, unloading, rolling / lifting and lowering into trench, applying soft soap to spigot and socket ends, cleaning inserting rubber sealing ring into correct position, jointing the pipes perfectly by jacking or other approved method, giving necessary hydraulic test at the specified pressure, cost of all jointing and water pressure testing materials, machinery, labour & all necessary works complete as per specification 600 mm dia P-2 / P-3 class R.C.C spun pipes WRD SR Vol-IV Item No:7.22.4 Page No-95 M 323.00 6460.00
7 162.400 Providing and filling murrum / gravelly soil ( CNS soil ) for foundation or around pipes including cost of all materials, labour, spreading soil in layers of 100 to 150 mm, breaking clods, watering, compaction by earth masters to achieve density control of not less than 90 percent and all other ancillary operations complete. WRD SR Vol-IV Item No:4.15 Page No-61 Cum 820.00 133168.00
8 0.219 Design, fabrication, supply, erection and commissioning of embedded parts ( with top seal seat ) consisting of sill beam, wheel tracks, seal seats, guide rails, groove lining upto top with all accessories for vertical lift roller gate for canal escape / regulator including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint complets as per specifications and approved drawings WRD SR Vol-IV Item No:6.27 Page No-82 Tonne 189000.00 41391.00
9 0.146 Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift gate ( with top seal ) consisting of skin plate, siffeners, horizontal and vertical girders, wheels, guide rollers, rubber seals with all accessories for canal escape / regulator vent including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings. WRD SR Vol-IV Item No:6.28 Page No-83 Tonne 176500.00 25769.00
10 2.00 Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw type hoist consisting of supporting structure, platfom, railing, ladder with all accessories for operating canal escape / regulator gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, greasing, applying two coats of zinc chromate red oxide primer and three coats of approved synthetic enamel paint and all other ancillary operations complete as per specifications and approved drawings Note: 1. Capacity of hoist in t with 25 % reserve capacity =2.50 x Wt of gate. ( Hoist capacity shall be rounded off to next 1 tonne ) WRD SR Vol-IV Item No:6.29 Page No-83 Tonne 47700.00 95400.00
TOTAL 1015393.15
Assistant Executive Engineer Executive Engineer
KBJNL MLI Sub Division - 6 KBJNL MLI Division No-2
Babaleshwar Babaleshwar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Schedule B 2967.xlsx
Others - Schedule B • 0.23 MB
DTP-2967-General.doc
Tender Document • 1.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .