Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.2 L+₹1,605.78 (0.38%)Rejected-AOC | ₹4.2 L+₹1,605.78 (0.38%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | BALAMURUGAN ENTERPRISES L2 | SRI ABIRAMI ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00 | BT road cutting etc complete as per direction of departmental officers | 5 | m3 | 1,100 ₹5,504.4 | 929 ₹4,648.72 Lowest |
| 2.00 | Earth work excavation in all soils and sub-soils and the full depth as may be directed by the departmental officers with initial lead and lift and cleaning and levelling the site etc., complete complying with standard specification | 10 | m3 | 135 ₹1,349.73 Lowest | 135 ₹1,349.73 Lowest |
| 3.00 | Dismantling the damaged RCC Slab as per Instruction of departmental officers..including all initial lead and lift etc complete. | 10 | m3 | 3,614 ₹36,132.77 Lowest | 3,614 ₹36,132.77 Lowest |
| 4.00 | Desilting the existing ugd chambers as per Instruction of departmental officers..including all initial lead and lift etc complete. | 7 | m3 | 116 ₹812 Lowest | 116 ₹812 Lowest |
| 5.00 | Dismantling the damaged PCC WALL as per Instruction of departmental officers..including all initial lead and lift etc complete. | 3 | m3 | 534 ₹1,604.14 Lowest | 534 ₹1,604.14 Lowest |
| 6.00 | Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | 50 | m2 | 489 ₹24,450 Lowest | 489 ₹24,450 Lowest |
| 7.00 | Cement concrete 1:3:6 mix (one cement Three sand and Six aggregates) using 20 mm size hard broken stones from approved quarry complying with standard specification | 8 | m3 | 6,319 ₹50,552 Lowest | 6,319 ₹50,552 Lowest |
| 8.00 | Plastering in Cement Morter 1: 5 Mix using 12 mm Thick including Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete | 22 | M2 | 292 ₹6,422.54 Lowest | 292 ₹6,422.54 Lowest |
| 9.00 | Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | 40 | m2 | 1,195 ₹47,794.62 Lowest | 1,195 ₹47,794.62 Lowest |
| 10.00 | Supply and Fabrication of RTS Rods in Various Dia. Including Cutting, Bending and Tying with all Labour Charges Etc., Complete. | 12 | qtl | 9,321 ₹1,11,852 Lowest | 9,321 ₹1,11,852 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
16 Oct 2025, 3:00 pmClosed
Assistant Commissioner West Zone
West Zone, Coimbatore Corporation
Raising of UGD Chamber at various location at Ward Areas in Ward no 41 of west zone.
2025_MAWS_611814_20
E5/West Zone/2025
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation.
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹5,000
8 Apr 2026
8 Oct 2025
17 Oct 2025
9 Oct 2025
16 Oct 2025
9 Oct 2025
stage.html
html • 0.04 MB
techsummary_731769.pdf
finsummary_731769.pdf
20.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.24 MB
SWD.pdf
Tender Documents • 0.67 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
BOQ_731769.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .