Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-Finance | ₹2.8 L | L1 | Accepted-Finance 1st Lowest |
| 2 | L2₹2.9 L+₹8,085 (2.86%)Rejected-Finance | ₹2.9 L+₹8,085 (2.86%) | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹2.9 L+₹8,952 (3.17%)Rejected-Finance VILL SARANGPUR HABASPUR DISTRICT PURBA BARDHAMAN PIN 713401 | HABASPUR | PURBA BARDHAMAN | WEST BENGAL | 713401 | ₹2.9 L+₹8,952 (3.17%) | L3 | Rejected-Finance 3rd Lowest |
Tender Value
₹2.9 L
EMD Value
₹5,775
Closing Date
11 Aug 2026, 4:00 pmClosed
SDO, Jamalpur Irrigation Sub Division
Jamalpur Irrigation SubDivision, P.O. and P.S. -Jamalpur, Dist.Purba Bardhaman- 713408
M/R to Branch-2/1 Canal by repairing ghoges and eroded canal banks, clearing jungles from canal banks, and removal of water hyacinth, aquatic weeds and sludge from canal bed from Ch.0.00 to Ch.410.00 for Kharif Irrigation under Jaugram (I) Section of
2026_IWD_1035684_7
WBIW/SDO/JISD/eNIT-04/26-27
Open Tender
CIVIL WORKS
Percentage
110 days
Gurap, Dhanikhali
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,775
Yes
27 Aug 2026
4 Aug 2026
11 Aug 2026
4 Aug 2026
11 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | 13,442 | Sqm. | 5.66 | ₹76,081.72 |
| 2 | Earthwork in closing ghoges in embankments including cutting, filling, puddling with water and ramming including all leads and lifts, if necessary. | 1 | Cum. | 122.17 | ₹122.05 |
| 3 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,
NB:Measurement to be taken on the basis of stack measurement / prepostwork section measurement after deduction of void as per norms. No extra payment will be made for stacking.
E) Beyond 4.00 km and upto 5.00 km
Note: This rate is includes compensation for earth land owned/arranged by the contractor @ Rs 25.00 per cum and royalty charges on earth @ Rs 29.00 per cum and cess charges @ Rs 5.3 per cum (i.e Rs 15 per 100 cft) as perGovernment notification and which will be paid on production of necessary documents in support of payment made toward the royalty and cess. | - | Cum. | 323.87 | - |
| 4 | Supplying to site empty cement polythene bags (capacity 50 kg.) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg.). | 629 | Each Bag | 6.79 | ₹4,270.91 |
| 5 | Labour charges for filling empty cement gunny bag/polythene bag (capacity 50 kg.) with all kinds of earth (wet or dry), sand or agreegates(stone/brick) and sewing as done in case of cement bags,(tying with a knot after filling will not be accepted), and stacking within a lead of 30 metre as per direction of Engineer-in-charge (cost is excluding the cost of any types of filling materials).
NB:- Volume of earth/sand filled bags should not be less than 0.028 cum./bag. | 629 | Each Bag | 7.92 | ₹4,981.68 |
| 6 | Dumping in position earth/sand filled gunny/poly bags (capacity 50 kg.) within a lead of 30 metre inclusive of all lifts. | 629 | Each Bag | 3.39 | ₹2,132.31 |
| 7 | Clearing and removal of water hyacinth including weeds, thick and thorny floating jungles and burning them to ashes when dry or removing them outside Government land including all leads and lifts to stack in a nearby available space complete. | 8,339.3 | Sqm. | 7.92 | ₹66,047.26 |
| 8 | Clearing and removal of debris (including floating debris) including sludge & slush mixed with all sorts of industrial waste, solid/semi-solid compact mass formed due to water hyacinth in combination with industrial wastes, carcasses, municipal garbage sludge, polypacks, thick and thorny jungles and long grass etc. and depositing, spreading the same on the canal bank and later burnt to ashes when dry including all leads and lifts complete. | 3,544.21 | Sqm. | 33.94 | ₹1,20,290.49 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
WB_Form_2911.pdf
Tender Documents • 1.86 MB
BOQ_2544195.xls
BOQ • 0.28 MB
Additional_4245-F(Y).pdf
Additional Documents • 0.62 MB
Additional_6718-F(Y).pdf
Additional Documents • 0.93 MB
Additional_Specification of USoR.pdf
Additional Documents • 0.44 MB
Additional_KARMASHREE ORDER ord_1721389139.pdf
Additional Documents • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .