Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
28 Aug 2026, 5:00 pm5d left
Chief Construction Engineer,R.W Circle,KPD-JJP
O/o CCE,Rural Works Circle,KPD-JJP
Construction of 4 Nos. E type Staff quarter for Sub-Register Office at Sukinda for the year 2025-26_building
2026_CERWI_139064_1
Tender Online RCK-15/26
National Competitive Bid
Civil Works - Buildings
Percentage
365 days
Jajpur
2 documents required · 2 mandatory
₹10,000
₹1.6 L
Yes
18 Aug 2026
18 Aug 2026
29 Aug 2026
18 Aug 2026
28 Aug 2026
18 Aug 2026
18 Aug 2026 - 28 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Double under reamed pile foundation with R.C.C M-20 including cost of boring but excluding cost of steel and bending ,binding
GROUND FLOOR (STILT FLOOR) | 61 | nos | 15,627.29 | ₹9,53,264.77 |
| 2 | Earth work in excavation of foundation in hard soil with initial lead & lift including rough dressing & levelling with all cost etc. complete .
GROUND FLOOR (STILT FLOOR) | 78.86 | cum | 282.88 | ₹22,307.92 |
| 3 | BOUNDARY WALL & APPROACH ROAD | 32.69 | cum | 282.88 | ₹9,246.02 |
| 4 | Filling foundation and plinth with sand well watered and rammed with cost carriage royalty etc as per specification & direction of the EIC.
GROUND FLOOR (STILT FLOOR) | 568.06 | cum | 778.14 | ₹4,42,031.76 |
| 5 | BOUNDARY WALL & APPROACH ROAD | 4.02 | cum | 778.14 | ₹3,127.11 |
| 6 | Cement Concrete (1:4:8) using 40mm size H.G. metal in foundation including all cost etc. complete.
GROUND FLOOR (STILT FLOOR) | 45.51 | cum | 5,997.45 | ₹2,72,943.95 |
| 7 | C.C.(1:3:6) in foundation and plinth with 4cm. size h.g. metal including cost carriage etc complete.as per specification & direction of the EIC..
BOUNDARY WALL & APPROACH ROAD | 4.02 | cum | 6,408.46 | ₹25,753.68 |
| 8 | Brick masonary using Fly ash bricks in CM(1:6) in foundation and plinth with cost of all labour and materials, etc complete.
GROUND FLOOR (STILT FLOOR) | 28.41 | cum | 5,842.3 | ₹1,65,979.74 |
| 9 | R.C.C. (1:1.5:3) with 12 mm size h.g. c.b. chips with cost carriage royalty of all materials etc.complete.as per specification & direction of the EIC
Pile Cap
GROUND FLOOR (STILT FLOOR) | 45.45 | cum | 13,061.61 | ₹5,93,650.17 |
| 10 | Plinth Band
GROUND FLOOR (STILT FLOOR) | 9.6 | cum | 10,217.26 | ₹98,085.7 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.36 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_606526.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].