Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical SOUTH THOTTAM PALAKKANTHU PO DINDIGUL WEST TALUK DINDIGUL 624 019 TAMIL NADU | 624019 | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹58,000
Closing Date
27 Aug 2026, 3:00 pmClosed
Chief Engineer
No. 487, Anna Salai, Nandanam, Chennai - 600 035
Construction of Agricultural Engineering Extension and Training Centre at Dharapuram, Tiruppur District
2026_AED_693772_1
SCB1-4-2026-27
Open Tender
Civil Works - Buildings
Percentage
210 days
Dharapuram
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹58,000
28 Aug 2026
13 Aug 2026
28 Aug 2026
13 Aug 2026
27 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. Data worked out for 48 m3 per day/8 hrs. | 196.8 | M3 | 366.82 | ₹72,190.18 |
| 2 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 59.83 | M3 | 259.27 | ₹15,512.12 |
| 3 | Supplying and filling in foundation, basement, etc with filling Crushed Stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 42.25 | M3 | 2,119.03 | ₹89,529.02 |
| 4 | Dismantling and clearing away the Doors & windows including removal of frames, hinges and fastenings etc., complete complying with standard specification and as directed by the departmental officers | 26.1 | Sqm | 164.31 | ₹4,288.49 |
| 5 | Dismantling and clearing away the Pantile or Mangalore tiled roof without roof timbers etc., complete complying with standard specification and as directed by the departmental officers. | 161 | Sqm | 21.25 | ₹3,421.25 |
| 6 | Dismantling and clearing away the Corrugated iron sheet roofing without roof timbers etc., complete complying with standard specification and as directed by the departmental officers. | 53 | Sqm | 32.01 | ₹1,696.53 |
| 7 | Dismantling and clearing away the framed timbers in roofs / floors etc., complete complying with standard specification and as directed by the departmental officers | 5 | Cum | 793.3 | ₹3,966.5 |
| 8 | Dismantling and clearing away the Brick / stone masonry in Cement mortar walls etc., complete complying with standard specification and as directed by the departmental officers. | 156 | Cum | 302.96 | ₹47,261.76 |
| 9 | Dismantling RCC by manual / by using deploying machineries SOR vol 1 pg:30 W-0035 | 1.19 | Cum | 4,610.31 | ₹5,486.27 |
| 10 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 36 | M3 | 157.79 | ₹5,680.44 |
stage.html
html • 0.05 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
Technical_Dharapuram.pdf
Tender Documents • 0.88 MB
Financial_Dharapuram.pdf
Tender Documents • 0.11 MB
BOQ_834122.xls
BOQ • 0.61 MB
Corrigendum_4.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .