Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.3 LAccepted-AOC CIRCUIT HOUSE ROAD DIST SINGRAULI M P | NOWROZABAD | SINGRAULI | MADHYA PRADESH | L1 | Accepted-AOC Accepted as on L1 basis | |
| 2 | L2₹11.0 L+₹56,036 (5.39%)Rejected-Finance MAIN ROAD PO SINGRAULI DISTT SINGRAULI MP | SINGRAULI | SINGRAULI | MADHYA PRADESH | L2 | Rejected-Finance Rejected as not L1 basis |
| Sl No | Description | Qty | Unit | Alfa Engineering And Trading Co. L1 | M/S. AKANCHHA ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00Name of work : Repairing of 02 Nos. Main Hydraulic Pumps ( LHS and RHS) for DMH-311 Drill Machine and Repairing of 06 Nos. Hydraulic Rotary Motor for IDM70E Drill Machine at Nigahi Project. | |||||
| 2.00Repairing of 02 Nos. ( LHS and RHS) Main Hydraulic Pumps of DMH-311 Drill Machine: | |||||
| 2.01 | Cost / charges for repairing / rebuilding of inner thrust plate to get original equal micro size finishing including spray welding charges , machining charges, grinding charges, polishing and buffing charges ,etc. and including labour charges, contractor profit etc (1nos. for each Hydraulic pump) (Total 2 Hydraulic pump) | 2 | nos. | 1,22,715 ₹2,45,430 Lowest | 1,25,000 ₹2,50,000 |
| 2.02 | Cost / charges for repairing / rebuilding of outer thrust bearing plate to get original micro size finishing including spray welding charges , machining charges, grinding charges, polishing and buffing charges ,etc. and including labour charges, contractor profit etc (1nos. for each Hydraulic pump) (Total 2 Hydraulic pump) | 2 | nos. | 85,715 ₹1,71,430 Lowest | 86,900 ₹1,73,800 |
| 2.03 | Cost / charges for repairing / rebuilding of piston sub assly to get original equal size finishing including spray welding charges , machining charges, grinding charges ,etc. and including labour charges, contractor profit etc (01 no. for each Hydraulic pump) (Total 2 Hydraulic pump) | 2 | job | 26,175 ₹52,350 Lowest | 27,000 ₹54,000 |
| 2.04 | Cost / charges for repairing / rebuilding of piston sub assly bore to get original equal sizes including spray welding charges , machining charges, grinding charges, Honing charges , polishing and buffing charges ,etc. including labour charges, contractor profit etc (01nos. for each Hydraulic pump) (Total 2 Hydraulic pump) | 2 | job | 22,190 ₹44,380 Lowest | 23,000 ₹46,000 |
| 2.05 | Cost / charges for repairing / rebuilding of bypass sleeve bore and body where bypass sleeve moves including spray welding charges , machining charges, grinding charges, Honing charges , polishing and buffing charges ,etc. and including labour charges, contractor profit etc(01nos. for each Hydraulic pump) (Total 2 Hydraulic pump) | 2 | job | 37,605 ₹75,210 Lowest | 38,650 ₹77,300 |
| 2.06 | Cost / charges for repairing / rebuilding of bypass sleeve to get original equal sizes including spray welding charges , machining charges, grinding charges,etc. and including labour charges, contractor profit etc (01nos. for each Hydraulic pump) (Total 2 Hydraulic pump) | 2 | job | 22,575 ₹45,150 Lowest | 23,400 ₹46,800 |
| 2.07 | Cost / charges for repairing / rebuilding of wobble cam plate to get smooth and original sizes including spray welding charges , machining charges, grinding charges ,etc. and including labour charges, contractor profit etc (1nos. for each Hydraulic pump) (Total 2 Hydraulic pump) | 2 | job | 17,660 ₹35,320 Lowest | 18,200 ₹36,400 |
| 2.08 | Cost / charges for repairing / rebuilding of damaged and weared sub assly piston shoes to get original sizes including spray welding charges , machining charges, grinding charges, polishing and buffing charges ,etc. and including labour charges, contractor profit etc (01nos. for each Hydraulic pump) (Total 2 Hydraulic pump) | 2 | job | 12,260 ₹24,520 Lowest | 13,600 ₹27,200 |
Tender Value
₹12.3 L
EMD Value
₹15,400
Closing Date
21 Sept 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GM(EXCV)NCL, NIGAHI PROJECT
OFFICE OF GENERAL MANAGER (EXCV)NCL, NIGAHI PROJECT, PO-NIGAHI, DISTT-SINGRAULI (MP)
Repairing of 02 Nos. Main Hydraulic Pumps ( LHS and RHS) for DMH-311 Drill Machine and Repairing of 06 Nos. Hydraulic Rotary Motor for IDM70E Drill Machine at Nigahi Project.
2026_NCL_364890_1
NGH/EXCV/TENDERS/26-27/033
Open Tender
Excavation Department Work
Item Rate
30 days
NCL NIGAHI PROJECT
AS PER NIT
4 documents required · 4 mandatory
₹15,400
24 Oct 2026
3 Sept 2026
22 Sept 2026
3 Sept 2026
21 Sept 2026
4 Sept 2026
3 Sept 2026 - 10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Name of work : Repairing of 02 Nos. Main Hydraulic Pumps ( LHS and RHS) for DMH-311 Drill Machine and Repairing of 06 Nos. Hydraulic Rotary Motor for IDM70E Drill Machine at Nigahi Project. | |||||
| 2Repairing of 02 Nos. ( LHS and RHS) Main Hydraulic Pumps of DMH-311 Drill Machine: | |||||
| 2.01 | Cost / charges for repairing / rebuilding of inner thrust plate to get original equal micro size finishing including spray welding charges , machining charges, grinding charges, polishing and buffing charges ,etc. and including labour charges, contractor profit etc (1nos. for each Hydraulic pump) (Total 2 Hydraulic pump) | 2 | nos. | - | - |
| 2.02 | Cost / charges for repairing / rebuilding of outer thrust bearing plate to get original micro size finishing including spray welding charges , machining charges, grinding charges, polishing and buffing charges ,etc. and including labour charges, contractor profit etc (1nos. for each Hydraulic pump) (Total 2 Hydraulic pump) | 2 | nos. | - | - |
| 2.03 | Cost / charges for repairing / rebuilding of piston sub assly to get original equal size finishing including spray welding charges , machining charges, grinding charges ,etc. and including labour charges, contractor profit etc (01 no. for each Hydraulic pump) (Total 2 Hydraulic pump) | 2 | job | - | - |
| 2.04 | Cost / charges for repairing / rebuilding of piston sub assly bore to get original equal sizes including spray welding charges , machining charges, grinding charges, Honing charges , polishing and buffing charges ,etc. including labour charges, contractor profit etc (01nos. for each Hydraulic pump) (Total 2 Hydraulic pump) | 2 | job | - | - |
| 2.05 | Cost / charges for repairing / rebuilding of bypass sleeve bore and body where bypass sleeve moves including spray welding charges , machining charges, grinding charges, Honing charges , polishing and buffing charges ,etc. and including labour charges, contractor profit etc(01nos. for each Hydraulic pump) (Total 2 Hydraulic pump) | 2 | job | - | - |
| 2.06 | Cost / charges for repairing / rebuilding of bypass sleeve to get original equal sizes including spray welding charges , machining charges, grinding charges,etc. and including labour charges, contractor profit etc (01nos. for each Hydraulic pump) (Total 2 Hydraulic pump) | 2 | job | - | - |
| 2.07 | Cost / charges for repairing / rebuilding of wobble cam plate to get smooth and original sizes including spray welding charges , machining charges, grinding charges ,etc. and including labour charges, contractor profit etc (1nos. for each Hydraulic pump) (Total 2 Hydraulic pump) | 2 | job | - | - |
| 2.08 | Cost / charges for repairing / rebuilding of damaged and weared sub assly piston shoes to get original sizes including spray welding charges , machining charges, grinding charges, polishing and buffing charges ,etc. and including labour charges, contractor profit etc (01nos. for each Hydraulic pump) (Total 2 Hydraulic pump) | 2 | job | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 3.85 MB
UNDERTAKINGASPERANNEXURE-II.pdf
Tender Documents • 0.08 MB
BOQ_377807.xls
BOQ • 0.30 MB
ANNEXURESANDOTHERIMPORTENTDOCUMENT.pdf
Tender Documents • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .