Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.5 LAccepted-AOC 13193 GALI NO 9 NAMDEV MARG BATHINDA | ₹56.5 L | L1 | Accepted-AOC Lowest Quoted Amount |
Tender Value
₹58.6 L
EMD Value
₹1.2 L
Closing Date
12 Feb 2026, 12:00 pmClosed
DSCO Keshav Kumar
Opposite Aggarwal Hospital, Kishanpura Road, Sangrur
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV/Sluice Valves, Construction of Haudies and all other allied works.
2025_DOA_156598_4
DSWC/SGR/2025-26/20/B
Open Tender
Pipe Laying Works
365 days
Sangrur
Please refer tender documents.
3 documents required · 3 mandatory
₹2,000
₹1.2 L
30 Mar 2026
6 Feb 2026
12 Feb 2026
6 Feb 2026
12 Feb 2026
6 Feb 2026
FINANCIAL BID NO.: DSWC/SGR/2025-26/20/B
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs.
Quoted by Contractor (As % less of Estimated Amount) Quote (+/-%)
Note: Please quote only figure (upto 2 decimal points) in above blue colour box in minus or plus. Do not put %age sign after this figure. Please check Quoted Rate in Next cell.
Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 300 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Rogla (C/o 30739/R), Tehsil Dirba and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 7489.8 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. /Mtrs 84 Eighty Four Rupees And Zero Paisa Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 2628 /Joints 117.42 One Hundred Seventeen Rupees And Forty Two Paisa Only
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (300mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 30 /Meter 1355.85 One Thousand Three Hundered Fifty Five and Eighty FIve Paisa Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (300 mm) 61 /Cut hole 75 Seventy Five Rupees And Zero Paisa Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 17 /Cut hole 41 Forty One Rupees And Zero Paisa Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (300 mm) 61 /Riser & Valve 491.99 Four Hundred Ninty One Rupees And Ninty Nine Paisa Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) 17 /Air pipe 290.45 Two Hundred Ninty Rupees And Forty Five Paisa Only
Fixing of Gate valves with C.C 1:2:4 (300 mm) 17 /Gate Valve 1458.91 One Thousand Four Hundred Fifty Eight Rupees And Ninty One Paisa Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3888.98 Three Thousand Eight Hundred Eighty Eight Rupees And Ninty Eight Paisa Only
Plain Cement Concrete 1:2:4 0.14 cum 5155.09 Five Thousand One Hundered Fifty Five Rupees And Nine Paisa Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum Five Thousand Fifty Four Rupees And Fourteen Paisa Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.59 Two Hundred Two Rupees And Fifty Nine Paisa Only
RCC Slab 1:2:4 0.21 cum Eight Thousand Two Hundred Forty Seven Rupees And Thirteen Paisa Only
Foot rest (Item No. 29.37) 6 No 100 One Hundred Rupees And Zero Paisa Only
Total Cost for ONE Haudi
Total Cost for Nineteen Haudis
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Three Thousand Only
Nimar for jointing the pipe 206.04 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 364.283 Ton One Hundred Sixty Rupees And Thirty Paisa Only
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency 24108
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 450 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village -Dhandoli Kalan (C/o 12018/L Extension) Tehsil-Dirba, District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 6697.6 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 1664 /Joints 235.55 Rupees Two Hundred Thirty Five and Fifty Five Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (450 mm) 38 /Cut hole 116 One Hundred Sixteen Rupees And Zero Paisa Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 10 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (450 mm) 38 /Riser & Valve 769.15 Seven Hundred Sixty Nine Rupees And Fifteen Paisa Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) 10 /Air pipe 289.19 Two Hundred Eighty Nine Rupees And Ninteen Paisa Only
Fixing of Gate valves with C.C 1:2:4 (450 mm) 9 /Gate Valve 2176.54 Two Thousand One Hundred Seventy Six Rupees And Fifty Four Paisa Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Eighty Six Only
B.B.C 1:8:16 0.6 cum 3880.15 Three Thousand Eight Hundred Eighty Rupees And Fifteen Paisa Only
Plain Cement Concrete 1:2:4 0.14 cum 5130.79 Five Thousand One Hundered Thirty Rupees And Seventy Nine Paisa Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5049.72 Four Thousand Forty Nine Rupees And Seventy Two Paisa Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.3 Two Hundred Two Rupees And Thirty Paisa Only
RCC Slab 1:2:4 0.21 cum 8224.98 Eight Thousand Two Hundred Twenty Four Rupees And Ninty Eight Paisa Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for Four Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Nimar for jointing the pipe 254.925 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 501.534 Ton 172.94 One Hundred Seventy Two Rupees And Ninety Four Paisa Only
Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 300 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Harigarh (C/o 82570/83460/R), Tehsil Dirba and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 5586 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. /Mtrs 84 Eighty Four Rupees And Zero Paisa Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 1960 /Joints 117.4 One Hundred Seventeen Rupees And Forty Paisa Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (300 mm) 45 /Cut hole 75 Seventy Five Rupees And Zero Paisa Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 18 /Cut hole 41 Forty One Rupees And Zero Paisa Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (300 mm) 45 /Riser & Valve 491.79 Four Hundred Ninty One Rupees And Seventy Nine Paisa Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) 18 /Air pipe 290.33 Two Hundred Ninty Rupees And Thirty Three Paisa Only
Fixing of Gate valves with C.C 1:2:4 (300 mm) 14 /Gate Valve 1458.71 One Thousand Four Hundred Fifty Eight Rupees And Seventy One Paisa Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Eighty Six Only
B.B.C 1:8:16 0.6 cum 3888.09 Three Thousand Eight Hundred Eighty Eight Rupees And Nine Paisa Only
Plain Cement Concrete 1:2:4 0.14 cum Five Thousand One Hundered Fifty Two Rupees And Sixty Nine Paisa Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5053.7 Four Thousand Fifty Three Rupees And Seventy Paisa Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.56 Two Hundred Two Rupees And Fifty Six Paisa Only
RCC Slab 1:2:4 0.21 cum 8244.94 Eight Thousand Two Hundred Forty Four Rupees And Ninty Four Paisa Only
Foot rest (Item No. 29.37) 6 No 100 One Hundred Rupees And Zero Paisa Only
Total Cost for ONE Haudi
Total Cost for Nine Haudis
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only
Nimar for jointing the pipe 153.664 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 271.671 Ton One Hundred Sixty Rupees And Thirty Paisa Only
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Rogla (C/o 60092/R Extension) Tehsil-Dirba, District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1032.08 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 278 /Joints 208.96 Rupees Two Hundred Eight and Ninty Six Paise Only
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (400mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 10 /Meter 2777 Two Thousand Seven Hundered Seventy Seven Rupees Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 6 /Cut hole 105 One Hundred Five Rupees And Zero Paisa Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 3 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 400 mm) 6 /Riser & Valve 712.88 Seven Hundred Twelve Rupees And Eighty Eight Paisa Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) 3 /Air pipe 290.33 Two Hundred Ninty Rupees And Thirty Three Paisa Only
Fixing of Gate valves with C.C 1:2:4 (400 mm) 2 /Gate Valve 2057.89 Two Thousand Fifty Seven Rupees And Eighty Nine Paisa Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Eighty Six Only
B.B.C 1:8:16 0.6 cum 3888.09 Three Thousand Eight Hundred Eighty Eight Rupees And Nine Paisa Only
Plain Cement Concrete 1:2:4 0.14 cum Five Thousand One Hundered Fifty Two Rupees And Sixty Nine Paisa Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5053.7 Four Thousand Fifty Three Rupees And Seventy Paisa Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.56 Two Hundred Two Rupees And Fifty Six Paisa Only
RCC Slab 1:2:4 0.21 cum 8244.94 Eight Thousand Two Hundred Forty Four Rupees And Ninty Four Paisa Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for Two Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Nimar for jointing the pipe 38.364 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 68.564 Ton 172.94 One Hundred Seventy Two Rupees And Ninety Four Paisa Only
Grand Total (A+B+C+D+E+F+G)
Grand Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
NITUGPL252620B.pdf
Tender Documents • 0.50 MB
DNITUGPL252620B.pdf
Tender Documents • 1.16 MB
FBUGPL252620b.xls
Additional Documents • 0.16 MB
Download all tender documents and submit your bid