| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC | ₹6.0 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹6.1 LRejected-AOC | ₹6.1 L | L2 | Rejected-AOC Accepted |
| Sl No | Description | Qty | Unit | SAI SURYA CONSTRUCTION L2 | SRI SAI CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Vellore District Renewal of Road From Masigam J.J.Nagr Road R - 228 ( KM 0/0 - 0/30 ) at Pernambut Block RRM 2025 - 2026 Package no 01 | |||||
| 2.00Renewal of Road | |||||
| 3.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., complete. | 162 | SQM | 6.47 ₹1,048.14 | 6.36 ₹1,030.32 |
| 4.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 40.5 | CUM | 346.83 ₹14,046.62 | 340.86 ₹13,804.83 |
| 5.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal | 12.94 | CUM | 4,310.37 ₹55,776.19 | 4,236.2 ₹54,816.43 |
| 6.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | 7.64 | CUM | 5,005.05 ₹38,238.58 | 4,918.93 ₹37,580.63 |
| 7.00 | Providing and laying Tack coat over Existing BT surface using 2.0 Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges | 900 | SQM | 29.51 ₹26,559 | 29 ₹26,100 |
| 8.00 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of | 27 | CUM | 11,768.64 ₹3.2 L | 11,566.15 ₹3.1 L |
| 9.00 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface | 60 | SQM | 905.22 ₹54,313.20 | 889.64 ₹53,378.40 |
| 10.00 | Provision For H.M Stone | 1 | Nos | 584.48 ₹584.48 | 574.42 ₹574.42 |
Tender Value
Refer Docs
EMD Value
₹12,600
Closing Date
19 Feb 2026, 3:00 pmClosed
The Block Developement Officer Pernambut
The Block Developement Office Pernambut
Vellore District Renewal of Road From Masigam JJ Nagr Road R -228 ( KM 0-0 - 0-30 ) at Pernambut Block RRM 2025 - 2026 Package no 01
2026_RDTN_656163_1
A2/309/2026
Open Tender
Civil Works
180 days
The Block Developement Office Pernambut
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹12,600
11 Jun 2026
12 Feb 2026
19 Feb 2026
12 Feb 2026
19 Feb 2026
12 Feb 2026
Vellore District Renewal of Road From Masigam J.J.Nagr Road R - 228 ( KM 0/0 - 0/30 ) at Pernambut Block RRM 2025 - 2026 Package no 01
Renewal of Road
Clearing the Scrub jungle including all labour charges for burrying and burning etc., complete.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Providing and laying Tack coat over Existing BT surface using 2.0 Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision For H.M Stone
Provision For Sign Board
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_786828.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
Tendernotice_2.pdf
PDF • 0.37 MB
BOQ_786828.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid