Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹3.8 L
EMD Value
₹3,800
Closing Date
15 Mar 2022, 2:00 pmClosed
SE/Civil/MTPS-II
SE/Civil/MTPS-II
Removal of silt , slush from all the storm water drains in Coal yard upto ETP Sump, from Wagon tippler MCC room upto railway track, all drains around PCH, SCH, Dozzer shed, Junction towers etc and Clearing the jungle from CH
2022_EB_223185_1
SE/Civil/MTPS-II/OT-68/2021-22
Open Tender
Civil Works - Others
Works
90 days
MTPs-II/Mettur Dam
2 documents required · 2 mandatory
₹0
₹3,800
Yes
21 Mar 2022
25 Feb 2022
16 Mar 2022
25 Feb 2022
15 Mar 2022
25 Feb 2022
Amount
Clearing the scrub jungle and disposing the debris to a suitable place away from the site as directed by the engineer at site including all labour charges, hire charges for vehicle, tools and plants required, leads & lifts etc., complete.
Removal of silt & slush and other waste materials deposited under water in drain/sump using baskets / vessels, spades, showel and special tools, removal of precast slab wherever necessary as per site condition etc., complete.
Disposal of collected silt, slush, and other waste materials etc away from the site, rate including cost of labour, lead, lift, tools and tackles, transporting by tractor, loading and unloading as directed by the Engineer in charge, etc., complete.
Removing the roots of jungle and, other plants with uprooting, and stacking at one point nearby carefully using JCB and disposing off as directed by the Engineer at site, including cost of labour charges, loading, unloading lead, lift, hire charges of T&P’s etc., Complete.
Brick work in CM 1:4 using Fly ash Bricks of size 23x11x7.50cm as directed by the Engineer in charge including cost of all materials, labour charges, curing, lead, lift, T&P etc.,complete.
Plastering in C.M 1:5, 12 mm thick for safety wall surfaces including cost of all materials, labour charges , curing, lead, lift etc complete.
SURIYA ENGINEERING CONTRACTORS
ARP Engineering Contractor
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .